  • ABM
    Reduced Preparation Time And Threading The Coils In The Intry Section Pltcm

    By Michel Rodrigo Luiz, Glaudistoni da Silva Félix, Osmar Duarte Junior

    This article deals with a project to reduce the preparation time and threading the coils in the input section of a pickling line coupled to the cold strip mill (PLTCM) at ArcelorMittal Vega. The proje

    Oct 1, 2019

  • CIM
    Goldex, the GRG Jewel (f7d6adb6-5ccd-46eb-a997-fe635a7b545b)

    By G. Belzil, F. Robichaud, M. Fullam

    ABSTRACT The Goldex mining and milling complex is operated by Agnico-Eagle and is located in the Abitibi greenstone region of northwestern Quebec, Canada. Commercial production started in 2008. Averag

    Jan 1, 2013

  • SME
    Current issues with purported “asbestos” content of talc: Asbestos nomenclature and examples in metamorphic carbonate and ultramafic hosted talc ores - SME Transactions 2018

    By M. E. Buzon, M. E. Gunter, B. D. McNamee

    A Google search on talc asbestos yields more than 500,000 hits due to the growing number of civil lawsuits in this area. Historically, the litigation was centered on amphibole-containing industrial ta

    Jan 1, 2018

  • CIM
    High Self-Heating Rate of a Pyrrhotite-Rich Material: H2S as a Fuel?

    By James A. Finch, Stéphanie Somot

    "The self-heating facility developed at the Noranda Technology Centre [Rosenblum and coworkers, 2001; 1995] has now been established in the Department of Mining, Metals and Materials Engineering at Mc

    Jan 1, 2006

  • SME
    An Analysis Of Air Cooling Prior To Reentering A Drift Containing Emplaced High-Level Nuclear Waste

    By Jr. Wallace

    This paper describes an analysis performed to determine the cool-down time of drifts in the prospective commercial nuclear waste repository in volcanic tuff at Yucca mountain, Nevada. Two emplacement

    Jan 1, 1988

  • CIM
    The CESL Gold Process

    By K. Mayhew, K. Murray

    The CESL Copper Process was developed as a hydrometallurgical alternative to smelting and refining for copper sulphide concentrates. As the majority of such concentrates contain appreciable gold and s

    Jan 1, 2011

  • AIME
    Petroleum Engineering Education - Is the Petroleum Industry Underengineered and, if so, to What Extent?

    By L. C. Uren

    Some of US have been impressed with the need for a better understanding of the future place of the engineer in the petroleum industry. In academic work we are continually asked to advise students as t

    Jan 1, 1929

  • SME
    Diesel Aerosols in an Underground Coal Mine

    By Jared Winkler, Jon A. Hummer, Aleksandar D. Bugarski, Shad Peters, Steven E. Mischler, Steve Cochrane, Shawn Vanderslice, Teresa Barone

    The case study assessed submicron aerosols at a continuous miner (CM) section, diesel aerosol concentrations at the longwall (LW) section, and elemental carbon (EC) and total carbon (TC) exposures. Ae

    Mar 16, 2022

  • IMPC
    Modernazation And Expansion Of Process Plant By Implementing Sag And Ball Mill And Carbon-In-Pulp Technology At The Hutti Gold Mines Company Limited

    By Gurubasayya Swamy

    This paper presents the consequences of modernization and expansion of process plant by implementing SAG and Ball Mill and Carbon-in-pulp technology at the Hutti Gold Mine. From the inception of the p

    Sep 1, 2012

  • CIM
    The Integration of Condition Monitoring into the Maintenance Process

    By Joel Werner

    Weak metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to remain c

    May 1, 2003

  • NIOSH
    RI 9001 - Calamity Hollow Mine Fire Project (In Five Parts) 5. Excavation and Evaluation of the Fire Zone

    By K. E. Soroka

    More than 500 fires are now burning in abandoned coal waste banks and coal deposits in the United States. Once established, such fires can burn for decades, and extinguishing them by conventional meth

    Jan 1, 1986

  • CIM
    The Cumberland Basin - A Possible Rift

    By R. D. White

    "The Cumberland Basin of Nova Scotia has long been considered a structural basin by virtue of the elliptical outcrop and inward dip pattern of the Pennsylvanian outcrops. Recent published and unpublis

    Jan 1, 1972

  • SME
    Scaleup of Pressure Oxidation Processes

    By D. D. Gertenbach

    "The successful commercialization of a pressure oxidation (POX) process for recovering metal values, including gold, copper, zinc, nickel and molybdenum, is the result of a carefully planned developme

    Jan 1, 2016

  • NIOSH
    Washability of Ultrafine Coal

    By R. Hogg, T. F. Dumm

    "Abstract - With increasing interest in the physical cleaning of fine coal, there is a need for extension of the sink float analysis procedure to finer sizes. Problems arise, however, in ensuring comp

    Jan 1, 1988

  • SME
    Ettringite Precipitation for Sulfate and TDS Reduction: A 10 GPM Pilot Plant Study

    By R. Bryce, T. J. Doughty, K. Stoll

    Sulfate-impacted mine waters are under regulatory scrutiny to reduce total dissolved solids (TDS). There are several options to reduce TDS. One option is transforming the soluble sulfate into insolubl

    Jan 1, 2019

  • NIOSH
    RI 8356 Radiant Heating of Mine Bulkheads

    By John C. Edwards

    The Bureau of Mines has developed a time-dependent mathematical model of radiative heating of bulkheads in mines. The model includes both reradiation from the duct (cylindrical) walls and direct radia

    Jan 1, 1979

  • SME
    Adapting to Project Needs: Frozen Cross Passages and Adits - RETC2023

    By Kyle Amoroso, Larry Applegate, Aaron K. McCain

    The use of frozen soil as ground improvement and temporary ground support for the excavation and construction of cross passages and adits has gained in popularity over the last decade. Frozen soil pro

    Jun 13, 2023

  • AIME
    Minerals In Man's Future

    By Zay Jeffries

    From the title of this chapter the reader could expect an attempt to outline the anticipated shape of things to come, mineralwise. We have no crystal ball and if we possessed one we could claim no exp

    Jan 1, 1959

  • CIM
    Laboratory Scale Concentration of Various Ores in a 2" Diameter by 24'8" High Flotation Column

    By D. A. Wheeler, Rémi Tremblay

    "INTRODUCTIONDuring the last few years, through Column Flotation Company of Canada ltd, the Centre de Recherches minérales has worked on the column flotation of coal, phosphate, feldspar, talc, graphi

    Jan 1, 1988

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015