Modernização Da Instrumentação E Controle Das Caldeiras 8 E 9 Na Central Termoelétrica 1 Da CsnBy Milson de Andrade Júnior
A central termoelétrica número 1 (CTE#1) da Companhia Siderúrgica Nacional possui duas caldeiras em operação denominadas 8 e 9 com capacidade total de produção de vapor de 200 Toneladas por hora. Esta
Jul 31, 2018
-
Melhoria Do Refratário Dos Convertedores Da Aciaria Usiminas CubatãoBy Haysler Apolinário Amoroso Lima
O desempenho de uma Aciaria depende da estabilidade dos equipamentos industriais. A conservação do refratário do convertedor garante produtividade, evitando paradas para reparo e campanhas antecipadas
Jul 30, 2018
-
Ground Improvement By Controlled Modulus Columns - A San Pedro Case StudyBy Sunil S. Basarkar, Vinothkumar S
Ground Improvement Techniques serves to improve various engineering properties for supporting various foundations. These may be undertaken either by conventional or advanced methods. The Controlled Mo
Sep 1, 2022
-
Dynamic Load Testing Of Non-Uniform PilesBy Thai Nguyen Ph. D
Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes
Oct 1, 2022
-
Redução Da Perda Metálica Na Aciaria Da Gerdau Usina De Ouro BrancoBy Carlos Vinícius Domingos de Carvalho
As perdas geradas nos processos de uma Aciaria contribuem de forma significativa para a perda metálica do processo. Eventualmente, mesmo com uma operação correta, do ponto de vista de características
Oct 30, 2017
-
Roll Pass Design Methods For Three- And Four-roll Rolling Mills – Comparison And Analysis*By Christian Overhagen
In bar and wire rod mills, rolling procedures featuring three- and four-roll technologies are state-of-the-art to produce high-quality long products. While a rolling model for the three-roll process i
Oct 1, 2019
-
Improved sustainability through WHIMS Plant addition at Roy HillBy C Jenkins, J Jasper, Y Suryaputradinata, S Lozyk, M J. Hartmann
The primary objective of mining companies is to function as a profitable business by delivering products that fit customer requirements in a safe and sustainable manner. Optimum resource utilisation i
Nov 8, 2021
-
Empowering Community Engagements: Knowledge and Sustainable Management of Critical Raw Materials - SME Annual Meeting 2025By Leena Suopajärvi, Karin Käär, Marcin Szumny, Jari Joutsenvaara, Md Ariful Islam, Helmut Mischo, Georg Meissner, Ossi Kotavaara, Catalina Vrabie
This study outlines implemented tactics and results for community empowerment through participation in questionnaire surveys, educational programs, and discussion on sustainable sourcing from new crit
Feb 1, 2025
-
Crushing and Grinding Circuit Availability: Why Is It Important in Design, and How Can We Increase It Cost-Effectively? - SME Annual Meeting 2025By Phil Dakin, Rajiv Chandramohan, John Lo Grande, Greg Lane
Crushing and grinding circuit availability is a critical design factor defining the installed equipment selection and the process buffers required to maintain throughput during maintenance. The commin
Feb 1, 2025
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
Equivalence Between Hot Tensile And Creep Data In Aluminum Alloy Al7475-t7351. Part 2: Analysis By Different Parameterization MethodologiesBy Gilmar Ferreira Bataglia
The possibility of parameterization of hot tensile data together with creep data is investigated, for Aluminium Alloy 7475-T7351. This study represents part of a broader research program aiming at the
Aug 8, 2018
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Adding Value in HydrometallurgyIn this paper, three types of value-adding in the minerals industry are discussed: downstream processing, improving the efficiency of existing processing and increasing the knowledge base and expert
Jan 1, 1995
-
The Aged Reloading Response Of Piles In ClayBy Paul Doherty
It is known that the axial capacity of a displacement piles installed in clay varies with time. Consolidation theory suggests that dissipation of porewater pressure set-up during pile installation wou
Jan 1, 2011
-
A comparison study of collisions of bidisperse inertial particles in a homogeneous isotropic turbulence, G. Wang, D. Wan, and X. ChenBy X. Chen, G. Wang, D. Wan
Computational fluid dynamics have been applied for detailed modelling of particle-bubble collisions. The most accurate approach in the previous work is using the point particle method to treat particl
Jan 1, 2020
-
Stress Distribution in Pillars as a Function of Opening and Pillar Geometry and Material PropertiesBy Zachary E. Wedding, Zach Agioutantis
Excavation of underground openings results in the redistribution of the in situ stress into the rock adjacent to the opening. Stress redistribution depends on opening geometry, pillar geometry, materi
Jul 1, 2023
-
Desenvolvimento De Um Ensaio Laboratorial Para O Dimensionamento De Moinhos VerticaisBy Maria Stella Vasconcellos Limaverde
A utilização de moinhos verticais na indústria mineral vem ganhando destaque nas últimas décadas, quando granulometrias mais finas passaram a ser exigidas, principalmente por tais equipamentos apresen
Aug 16, 2017
-
Automação Dos Processos De Recebimento, Armazenamento E Distribuição De CombustíveisBy DIEGO RAFAEL MONTEIRO DINIZ
Os processos de recebimento, armazenamento e distribuição de combustíveis em grandes empresas mineradoras necessitam de um controle robusto e eficaz de todas as operações, uma vez que representam elev
Oct 30, 2017
-
RI 3940 Exploration of Argentiferous Lead-Copper Deposits of the Slana District, AlaskaBy Robert L. Thorne
As an integral part of the investigation of critical and essential minerals in Alaska , the Bureau of Mines examined the lead deposits in the Slana area . Four examinations were made during June , Jul
Nov 1, 1946
-
Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth
A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di
Jun 13, 2023