Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Sulfide Waste Management Considerations at Homestake's Santa Fe MineBy Dale A. Shay, Roy R. Cellan
The Santa Fe Mine, located in west central Nevada, began leaching ore in 1988 and completed ore processing in 1995. Homestake Mining Company has completed final reclamation of the site, including reme
Jan 1, 2000
-
The Importance Of Iron Ore Characterisation And Dem Modelling In Materials Handling Applications With A Focus On WearBy Tobias Krull
The characterisation of iron ore from a materials handling point of view is paramount in order to provide the best possible design for the desired application and maximise equipment uptime at the lowe
Aug 1, 2018
-
Substituição Do Queimador Da Planta De Pulverização De CarvãoBy Marcelo Ito
Este artigo pretende apresentar a solução adotada para aumentar a disponibilidade da planta de moagem de carvão em 6,6% na unidade Barro Alto, membro do grupo Anglo American Brasil, substituindo o com
Oct 30, 2017
-
Medição Robotizada De Umidade Em Campo De Finos De Minério De Ferro Após Filtragem Em Filtros De Discos Verticais A VácuoBy Luciano França Rocha
A medição online de umidade de finos de minério de ferro sempre foi uma informação muito desejada nas plantas de pelotização de minério de ferro. Controlar a umidade do pellet feed produzido pela unid
Jul 30, 2018
-
Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024By Joseph Goessling, Mark Kroncke, James Parkes
The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi
Jun 23, 2024
-
Geophysical log applications to geological and geotechnical assessmentBy B Zhou
Geophysical borehole logging, which measures various in situ petrophysical parameters, can be used not only for qualitative interpretation such as strata correlation, but also for geotechnical assessm
Nov 8, 2021
-
Geology Says Otherwise - SME Annual Meeting 2024By William H. Langer
I spent 41 years as a geologist with the US Geological Survey (USGS) conducting geologic studies and preparing peer reviewed maps and reports describing the results of those studies. Since retiring fr
Feb 1, 2024
-
Operations versus Projects - How Do People Think and What are the Implications?By B Clements, G Lane
The operations and project environments are very different, but overlap in many areas. The development of mineral processing projects is goal oriented, is schedule focused and is a contractual environ
Oct 29, 2012
-
Mine-Caves Under The City Of Scranton.By Eli T. Conner
(Wilkes-Barre Meeting, June, 1911.) My connection, under a commission from the Councils and Board of School Control of the city of Scranton, Pa., with a recent investigation of mine-caves and the res
Sep 1, 1911
-
Deutschman Cave, Near Banff, B.C., CanadaBy W. S. Ayres
I. INTRODUCTION. THIS cavern was discovered Oct. 22, 1904, by Mr. Charles H. Deutschman, in company with whom I made, May 29 to June 3, 1905, at the request of Mr. Howard Douglas, Superintendent of t
Jan 1, 1907
-
Fresh Concrete Pressure in Cast In-Situ Bored PilesBy Matthias Pulsfort, Hanna Nissen, Markus Herten
An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke
Sep 8, 2021
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Prediction and Assessment of Rock Burst Using Various Meta-heuristic Approaches - Mining, Metallurgy & Exploration (2021)By P. K. Kankar, Manoj Khandelwal, Ramesht Shukla
One of the utmost severe mining catastrophes in underground hard rock mines is rock burst phenomena. It can lead to damage to mine openings and equipment as well as trigger accidents or even threat to
Mar 17, 2021
-
Turning mineral processing tailings into an Asset: A programmatic approach for the development of valorization opportunities, J.L. Broadhurst, A. Kotsiopoulos, J.R. Amaral Filho, and S.T.L. HarrisonBy S. T. L. Harrison, A. Kotsiopoulos, J. R. Amaral Filho, J. L. Broadhurst
The land disposal of voluminous fine-grained tailings from the processing of mined ore bodies poses a long-term risk to the surrounding environment and local communities, while also representing a los
Jan 1, 2020
-
Análise Técnico-gerencial Da Produção De Eixos Motrizes Recuperados Por SoldagemBy Heretiano Dalmacio Sampaio Junior
Neste trabalho será apresentado o detalhamento das atividades necessárias à realização dos serviços de recuperação de eixos comuns de acionamento de grandes equipamentos mecânicos. Apesar do ideal ser
Aug 8, 2018
-
2-D FEM parametric numerical analysis of inclined coal pillarsBy Kostas Kaklis, Zach Agioutantis, Robin Flattery
Pillars are used as the primary support structures for underground mining to maintain stability by supporting the over laying strata. In the case of horizontal seams, the pillars are typically subject
-
A Discussion On Causation Mechanisms For Overburden Bumps As Distinct From Coal BurstsBy Russell Frith
The entire subject area of micro-seismic events due to stored strain energy, as distinct from gas-driven coal outbursts, can be readily sub-divided into firstly events with their energy source from wi
-
Second Narrows Water Supply Tunnel—Conventional Deep Shaft Excavation in Variable Weak Rock - RETC2023By J. Andrew McGlenn, Brian McInnes, Bruce Downing, Murray Gant
The Second Narrows Water Supply Tunnel crossing beneath Burrard Inlet is an important component of the Greater Vancouver Water District’s plans to increase seismic resilience and meet increasing water
Jun 13, 2023
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern SydneyBy Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Designing User Interfaces for the Mines of the Future – User Centred ApproachBy E Widzyk-Capehart
The mines of the future can be envisioned as complex, large-scale technological systems being operated remotely from few centrally located (major cities) operating centres and skeletal crew stationed
Nov 22, 2011