Search Documents

  • AUSIMM
    Project Controls for Large Mining Projects - The Client's Perspective

    Control of construction projects is the responsibility of the Project Leaders who have the authority to make decisions. Project Controls cost and scheduling systems provide the Leaders with timely inf

    Jan 1, 1993

  • AIME
    Minerals Beneficiation - San Manuel's New Process for the Recovery of Molybdenite

    By J. F. Shirley, H. K. Burke

    In January, 1964, three years of laboratory and pilot plant test work reached its culmination. The San Manuel Div. of the Magma Copper Co. switched its molybdenite extraction circuit from the sodium h

    Jan 1, 1965

  • AUSIMM
    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Using Dynamic Simulation Throughout a Process Plant's Life Cycle

    Sep 13, 2010

  • SME
    A Study on the Impact of In-Seam Rock Partings on Coal Pillar Strength Based on Field Instrumentation and Numerical Modeling at the Maple Eagle Mine - SME Annual Meeting 2024

    By Morgan M. Sears, Mark Morris, Joseph Bright

    In an effort to advance the science underlying modern coal pillar stability analysis, researchers at the National Institute for Occupational Safety and Health are currently involved in research aimed

    Feb 1, 2024

  • SME
    Assessment Of The Real Economic Feasibility Of Potential Critical Raw Materials Mining Projects In The U.s.; Implementation Of A Newly Developed Computational Tool - SME Annual Meeting 2022

    By M. A. Islam, H. Mischo, G. Barakos

    Among the thirty-five declared critical raw materials (CRM) in the United States, there is no sustainable domestic production for the fourteen of them, while for some others domestic supply does not m

    Mar 2, 2022

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • SME
    Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024

    By Rob Herr, Irwan Halim, Heather Marsh

    This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap

    Jun 23, 2024

  • DFI
    Wrigley Field – The 1060 Project

    By Darren S. Diehm

    "Construction for the restoration and expansion of 102-year-old Wrigley Field in Chicago, Illinois began at the conclusion of the 2014 baseball season. This six year project involves structural upgrad

    Jan 1, 1900

  • DFI
    St. Croix Bridge, Minnesota: The Influence of Construction on the Axial Resistance of Drilled Shaft Foundations in Weak Sandstone

    By William G. Ryan, David S. Graham, Dan A. Brown, Rich A. Lamb, Paul J. Axtell

    "The St. Croix River Crossing project on the Minnesota-Wisconsin border has been in the process of planning and public debate for two decades, with several changes in alignment. During the course of t

    Jan 1, 2015

  • SAIMM
    Review of step changes taken to improve recovery of fine pentlandite at Kevitsa Mine, B. Musuku, N. Schreithofer, and O. Dahi

    By O. Dahl, B. Musuku, N. Schreithofer

    Recovery of fine pentlandite is proving to be a challenging task in the Kevitsa sequential flotation operations, with over 60% of the nickel losses reporting into the -25μm size fraction. Since commis

    Jan 1, 2020

  • ABM
    Requerimentos De Amostras Para Ensaios Na Prensa De Rolos De Alta Pressão

    By Claudio Luiz Schneider

    Projetos green field exigem quantidades relativamente grandes de amostra de alma de sondagem. Se a rota de processamento do projeto inclui moagem no HPGR, são necessários testes em escala de laboratór

    Aug 16, 2017

  • AUSIMM
    Improving Open Stope Productivity at Sunrise Dam

    By K Guilfoyle

    AngloGold Ashanti Australia Ltd operates an underground mine below a large open pit at the Sunrise Dam Gold Mine near Laverton in Western Australia. Operations are based on an extensive mineralised zo

    Nov 8, 2011

  • SME
    Shale Gas Well Casing Deformation in Longwall Chain Pillars under Deep Cover – Field Measurement and Numerical Modeling

    By Peter Zhang, Daniel Su, Mark Van Dyke, Heather Dougherty

    The integrity of shale gas wells in longwall chain pillars under the influence of longwall mining is a safety concern for both coal and gas operators. Previous modeling studies of gas wells in longwal

  • SME
    "Minesite" A Basis For Mineral Resource Planning (Getting The Rock In The Box Isn't Like It Use To Be)

    By David L. Brostrom, William C. Brice, Perry A. Canton

    The business of mineral exploration and development has become much more than simply a problem of locating orebodies and designing mines. Favorable economic analysis of mining and processing feasibili

    Jan 1, 1974

  • AIME
    Central Ohio Coal Company's Mine Expansion Program

    By Paul D. Martinka

    Coal is the principal energy source for the American Electric Power System (AEP System), which generates and delivers more electric energy to its customers within a seven-state area than any other inv

    Jan 1, 1969

  • ABM
    Towards The Development Of Design Criteria For Reduced Wear In Iron Ore Transfers

    By Dusan Ilic

    Conveyor system wear of belts and transfers attribute to a significant proportion of the maintenance costs and lost productive hours when handling hard abrasive ores at high unit rates typical of the

    Aug 17, 2017

  • SME
    Development of an equation describing signature waveform based on the Fourier series for blast vibration prediction - SME Transactions 2012

    By B. T. Lusk, J. J. Silva Castro

    Currently, there are several methodologies to assess ground vibrations from blasting. Of all available methodologies, one that is becoming more important is the waveform superposition or signature hol

    Jan 1, 2012

  • SME
    Simulated learning model for minable reserves evaluation in surface mining projects - SME Transactions 2013

    By C. V. Deutsch, J. B. Boisvert, M. A. Cuba

    The amount of information available for characterizing a deposit increases over time due to the continuous acquisition of data during mining. This additional information is collected from different so

    Jan 1, 2013

  • SME
    Direct upscaling of semivariograms and cross semivariograms for scaleconsistent geomodeling - SME Transactions 2013

    By O. Babak, O. Leuangthong, M. A. Cuba

    Integration of data from multiple sources and/or multiple scales is a common, yet challenging aspect of geostatistical resource modeling. Common approaches to data integration are based on a cokriging

    Jan 1, 2013

  • SME
    Initial Breakthrough Analysis Between Grasberg Block Caving Mine and Grasberg Open Pit Through Seismicity - RASIM22

    By Eric Sitorus, Septian Prahastudhi, Roy William, Wieda Azani

    In July 2020, massive slope failure occurred in the southeast corner Grasberg open pit. This was the final episode in the breakthrough of Production Block 2 South (PB2S) of the Grasberg Block Cave to

    Jan 1, 2022