Search Documents

  • NIOSH
    RI 8793 The Generation, Collection, and Analysis of Welding Fumes

    By J. F. McIlwain

    The Bureau of Mines investigated fumes generated by selected welding materials used in mines in order to help determine their relative hazard potential. The initial phases of the study have been compl

    Jan 1, 1983

  • CIM
    Some Pre-Cambrian Rocks in Northern Quebec

    By James H. C. Martens

    Among the many interesting problems of the pre-Cambrian of the Canadian Shield is that of the origin of certain types of gneisses which are intimately associated with the granites on the one hand and

    Jan 1, 1927

  • CIM
    Monitoring Furnace Sidewall Integrity Using Multivariate Statistical Models

    By T. Gerritsen, T. Plikas, K. Ochoa, M. Loveless, R. MacRosty, J. Reichart, R. Pula

    Sidewall accretion in a smelting furnace plays an important role in furnace integrity as it provides protection to the sidewall cooling elements and thereby extends the furnace campaign life. The extr

    Jan 1, 2019

  • CIM
    Principles of Ontario Hoisting Plant Operation and Maintenance in an MSHA Mine

    By Dan Miners

    "This presentation will provide an overview and understanding of Mine Safety and Health Administration (MSHA) and Ontario Regulations for Mines and Mining Plants. It includes discussions on the histor

    Jan 1, 2019

  • CIM
    Information Systems for Technological Data with Support of Internet of Things

    By O. Kodym

    The paper has focused on possibilities of interconnecting information sources concerning monitoring & control of mining industry technical processes (TP), and the related safety hazards. The key issue

    Aug 1, 2013

  • SME
    Modern Management Technology Methods And Systems For Higher Margins (0f94c010-61c2-400a-a87b-0f8d501cb39b)

    Maximizing margins in competitive markets demands superior productivity. Unfortunately, management systems developed early this century for other industries often drive counterproductive behaviors cho

    Jan 1, 1999

  • ISEE
    What We Learned While Determining VOD’s in Underground Small Hole Blasting

    By Scott Rosenthal, Kyle Murphy

    This paper discusses the trials and tribulations of obtaining Velocity of Detonation (VOD) readings in small diameter blast holes in an underground mine.

    Feb 1, 2020

  • CIM
    The Sullivan Concentrator Pilot Mill

    By R. M. Lauer

    OVER THE YEARS concentration of the Sullivan ore has become progressively more difficult as the ore has become increasingly refractory. The introduction of new reagents and changes in the flow of the

    Jan 1, 1960

  • SME
    Why Bother With Computer Control?

    By P. F. Mataich

    "Why bother with computer control?" This question and others like it have been heard over and over again by those who have tried to convince operating men that there are sound merits to installing a p

    Jan 1, 1965

  • AUSIMM
    Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate

    By C Switzer, R Logan, S Konopa, P Stoker, R Lewis

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G

    Mar 18, 2015

  • CIM
    “Beyond 2000” — How we are changing

    By B. Crane, S. Schwartz

    "IntroductionThe Cape Breton Development Corporation (CBDC) located in Cape Breton, Nova Scotia, in eastern Canada, was established in 1967. Its mandate at that time was to facilitate a phased downsiz

    Jan 1, 1997

  • AUSIMM
    Sampling in Block Cave Mines

    By I T. Ross

    Sampling drawpoints in block cave mines has been a contentious issue for many years. Doubts have been expressed as to the validity of the process used at most mines. This paper outlines the sampling p

    Aug 21, 2012

  • SME
    "Key Technologies of Large RectangularPipe Jacking Machine"

    By Lianhui Jia, Yali Han

    "The key technologies of a large rectangular pipe jacking machine with dimensions of 10.12m × 7.27m (width x height) include selection of rectangular cross-section cutting modes, analysis on the stren

    Jan 1, 2016

  • CIM
    Risk Weighted Cash Flow, a Communication Tool for Engineers and Financial Professionals on New Technology Projects

    By Mark Kennedy, Allan MacRae, Cameron Hams

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2011

  • AUSIMM
    Ventilation Officers or Mine Managers? Who should Ultimately be Responsible for Mine Ventilation? A Comparison between Western Australia and Queensland

    By A Halim

    "There is still debate about who should ultimately be responsible for the ventilation system in anunderground mine. The Queensland Coal Mining Safety and Health Regulation 2001, states that adedicated

    Jun 1, 2012

  • AUSIMM
    An Overview of Surface Rock Support for Deformable Ground Conditions

    By M P. Sandy, V Louchnikov, V Eremenko, M Orunesu, O Watson

    "Surface support is a key component of most ground support systems which are applied as a means of reducing the risk of rockfall occurrence and maintaining serviceability of mine development. Surface

    Mar 24, 2014

  • CIM
    An Update of the Sag Milling Operation at the Peñasquito Mine Located in the Zactecas State, Mexico

    By Elmer Palmer

    As part of the Goldcorp Inc growth plan Minera Peñasquito SA de CV has developed its polymetallic deposit with a large ?state of the art? concentrator to process lead and zinc ores. The plant consists

    Jan 1, 2012

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • SAIMM
    Acclimatizing Men to Heat in Climatic Rooms on Mines

    By C. H. Wyndham, N. B. Strydom

    Discussion C. G. Hinds (Member): The climatic chamber at Kloof Gold Mine was built to the design referred to in the paper presented by Professor Wyndham and Dr Strydom. As no suitable underground fa

    Jan 10, 1969

  • DFI