Search Documents

  • DFI
    Pile Foundations General - .1 Equipment information

    By Bengt H. Fellenius

    .1.1 Prior to commencement of pile installation operation, submit to [Engineer] for [approval] [review], details of equipment for installation of piles. SPEC NOTE: The information requested in 3.1

    Jan 1, 1991

  • NIOSH
    Review Of Literature On Dusts - Introduction

    By J. J. Forbes

    Problems connected with the incidence, effects, determination, and control of dusts are still much before the public, although more information is available to the layman than when Bulletin 400, of wh

    Jan 1, 1950

  • CIM
    Reducing Energy Consumption by Alternative Processing Routes to Produce Ferrochromium Alloys from Chromite Ore

    By Arthur Barnes, Mika Muinonen, M. J. Lavigne

    "The carbothermic reduction of chromite ore to produce high carbon ferrochromium is among the most energy intensive metal extraction processes performed, due not only to the highly endothermic nature

    Jan 1, 2015

  • ISEE
    Reducing Blasting Costs using Air-Decks: The Do's and Don'ts

    By S B. Richardson, D Mead, N T. Moxon

    The use of air-decks to reduce explosive costs has become very topical in recent years. The majority of the research in this area has been arried out between the Soviet Union where reductions in explo

    Jan 1, 1991

  • SME
    Slicklines, Droplines, Diverter Boots—A Monograph - SME Annual Meeting 2025

    By Lauren M. Roberts, Ralph R. Sacrison

    Pipeline or borehole free-fall transfer of material has long been done in support of underground mining. This paper addresses some characteristics and design elements in selecting systems suitable to

    Feb 1, 2025

  • NIOSH
    IC 8235 A Review Of Well Stimulation And Techniques To Prevent Formation Damage In Oil And Gas Production

    By J. L. Eakin

    The works and opinions of experts on well stimulation and related problems are summarized in this paper. The material is devoted to stimulative work in petroleum and natural-gas wells exclusive of the

    Jan 1, 1964

  • SME
    Postmining Operations

    By Richard B. Stein

    Section 25 has been assembled to give the geological, mining, or metallurgical engineer an overview of some of the important downstream operations that typically follow mining activities. This subject

    Jan 1, 2008

  • NIOSH
    Bureau Of Mines Development Of Titanium Production Technology

    By J. L. Henry

    The development and status of technology for producing titanium from U.S. resource materials are summarized in this Bureau of Mines report. Commercially feasible processes and investigations of altern

    Jan 1, 1987

  • NIOSH
    OFR-2(1)-78 Water Management In Oil Shale Mining - Volume 1- Main Text

    By A. Brown

    This report details work performed and results obtained in a study of the water management aspects of oil shale mining and retorting in the Piceance Creek Basin. Three specific sites were investigated

    Jan 1, 1977

  • AUSIMM
    Updraught Sintering

    By Green A. D M

    The establishment of the Imperial Smelting Furnace at Sulphide Coporation Pty. Limited for the smelting of zinc and lead made it necessary to design and install sintering capacity to produce approxima

    Jan 1, 1964

  • DFI
    Final Report – Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "In partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC), Deep Foun

    Jan 1, 2016

  • NIOSH
    OFR-134-77 Development Of Emergency Escape Systems Guidelines For Underground Metal And Nonmetal Mines

    By D. Randolph Berry

    This report describes a study to develop a detailed set of guidelines and equipment recommendations to be used as a guide for mine operators, mine inspectors, and equipment manufacturers in implementi

    Jan 1, 1976

  • DFI
    Workshop on Quality Assurance for Post-Grouted Drilled Shafts

    By Mary Ellen Bruce Large

    "INTRODUCTIONIn partnership with California Department of Transportation (Caltrans), Federal Highway Administration (FHWA), and with support from International Association of Foundation Drilling (ADSC

    Jan 1, 2016

  • DFI
  • NIOSH
    OFR-48-79 Design And Fabrication Of Instrumentation For Remote Sealing Of Underground Coal Mine Passageways - Volume I

    By David A. Monaghan

    This report describes instrumentation which is part of a system for extinguishing mine fires by pumping material through surface boreholes in order to seal off all underground passageways leading to t

    Jan 1, 1977

  • SME
    Construction of the NATM Tunnel at San Diego State University

    By Justin Brown, Michael Kobler, Dave Ragland, Bob Shufflebotham

    PROJECT OVERVIEW As the sun-bronzed San Diego students strolled casually to class, mining crews from Atkinson Construction were working only 9 meters below the surface. The330 meter long, 11.3 met

    Jan 1, 2003

  • TMS
    Modern Tank House Design and Practices at Copper Refineries Pty. Ltd.

    By D. W. Hoey

    Eight years use of the ISA Process is reviewed and current design and operations described. Nodern Technology used for impurity control and disposal as well as the use of mechanised electrode handling

    Jan 1, 1987

  • NIOSH
    OFR-18-80 Evaluation Of Surface Mining Blasting Procedures ? 1.0 Summary

    An evaluation of blasting procedures in surface mining operations was undertaken to determine means for improving safety. The objectives of the study were to: 1. Develop guidelines for safer blasti

    Jan 1, 1977

  • NIOSH
    OFR-11-83 Portable Trailing Cables, Splices, And Couplers Design And Installation Considerations

    By L. A. Morley

    This report summarizes the work performed on Bureau of Mines Contract J0199106, "Portable Trailing Cables, Splices, and Couplers - Design and Installation Considerations," from May 1, 1979 until Decem

    Jan 1, 1982

  • DFI