Search Documents

  • CIM
    Automation to Change the way we Mine in Narrow-Veins

    By Ben R. Bjorkman

    The future is here ? or at least that?s what Mine Planners predicted some 15 years ago ? that by 2004 we would have man-less mines running themselves using space-aged technology. Truthfully, though, t

    Oct 1, 2004

  • CIM
    The Recovery of Precious Metals and Platinum Group Metals from Mine Ores and Tailings using Plasma Smelting Technology

    By D. E. Deegan, G. Holcroft, T. P. Johnson

    "The rising cost of extracting metals from existing traditional deposits, increasingly stringent environmental regulations and a greater awareness of corporate social responsibility issues are all fac

    Jan 1, 2016

  • ABM
    Sail Rsp Blast Furnace No. 5 - A Greenfield Project In A Brownfield Optimization Context

    By Jan Bak

    Rourkela Steel Plant (RSP), which is operated by the Steel Authority of India Limited (SAIL), was inaugurated in 1959 and was the first Integrated Steel Plant in the public sector in India. In 2013, R

    Aug 2, 2018

  • CIM
    The Development of Gold Recovery Technology from Pyrite-Pyrrhotite-Bearing Ores

    By L. V. Kin, V. V. Lodeischikov, A. V. Byvaltsev, IRGIREDMET JSC, O. D. Khmelnitskaya, S. V. Petrov

    "Irgiredmet Institute carried out the study on the development of gold recovery technology from refractory ore from a Russian deposit. The ore contained 1.1 g/t Au, 1.5% of pyrite and 2.4% of pyrrhoti

    Jan 1, 2016

  • TMS
    Investigation Of The Effects Of Interstitial Filling Ratios On The Dry Grinding Kinetics Of K-Feldspar

    By H. Ipek

    In this study the effects of interstitial ratios on k-feldspar samples were investigated. The k-feldspar samples were taken from Egypt using dry batch grinding conditions and a kinetic model. Three di

    Jan 1, 2006

  • IMPC
    Optimization Studies On The Removal Of Copper From Sarcheshmeh Molybdenite Concentrate By Ferric Chloride Leaching

    By Ali Dehghani Ahmad Abady

    In Sarcheshmeh Copper Complex, a molybdenite floatation concentrate was produced by selective removal of copper impurities with 7 stages of cleaner floatation banks, that contains around 1% copper and

    Sep 1, 2012

  • AIME
    Institute of Metals Division - Determination of Diffusivity of Carbon in Tantalum and Columbium Carbides by Layer-Growth Measurements (TN)

    By R. Steinitz, L. Seigle, R. Resnick

    THE rates of growth of the carbide phases MC and M2C in the Ta-C and Cb-C systems have been measured at various temperatures and the results used to estimate the rate of carbon diffusion within the in

    Jan 1, 1965

  • AUSIMM
    Operational Challenges and Lessons Learnt at Xinli Nonferrous Co Ltd’s Ilmenite Smelter

    By H Weitz

    Bateman Engineering provided process technology and engineering design to China Yunnan Metallurgical Company (CYMCO) for a 30 MW DC furnace for the production of high-grade titanium dioxide slag.Follo

    Oct 5, 2011

  • AUSIMM
    How Mining is Catching Up

    In terms of tunnelling the mining industry is generally thought of as the crude cousin of the civil construction industry. Mining has tended to concentrate on speed and flexibility rather than the hig

    Jan 1, 1999

  • SME
    Beneficiation Of Sulfur Ore By Conventional And Column Flotation

    By J. Stachurski, N. A. Abdel-Khalek

    The objective of this investigation was to compare the results of countercurrent, column cell flotation vs. conventional (mechanical) cell flotation for the cleaning of a sulfur ore (-0.5 mm, 27.43% S

    Jan 1, 1994

  • TMS
    Fluid Flow and Particle Removal by Bubble Flotation in a Mechanically Stirred Vessel

    By Shoji Taniguchi, Lifeng Zhang

    "In this paper, firstly the 3D single-phase turbulent steady fluid flow in a vessel with four baffles stirred by a single impeller is mathematically simulated. Turbulence is modeled by using the stand

    Jan 1, 2000

  • SME
    Longest Underground Belt Haulage System

    By W. G. Kegel

    Coal mining today is confronted with numerous problems, all of which affect in some way the ability of the operator to produce profitably. The major endeavor, therefore, is a quest for cost lowering t

    Jan 1, 1964

  • SME
    Recovery of Iron Values from Discarded Iron Ore Slimes Mining, Metallurgy and Exploration

    By Nikhil Dhawan, Veeranjaneyulu Rayapudi, Singh Rahulkumar Sunil

    The ever-increasing demand for steel and the subsequent depletion of high-grade ores requires the massive utilization of low-grade iron ores. In the present study, an iron ore slime sample containing

  • SAIMM
    Selective Leaching Of Phases Occurring In Charge Chrome

    By A. Wedepohl

    Selective leaching of phases in charge chrome is used in a variety of industrial processes for the production of chromium chemicals. A mineralogical study was made of a range of local charge chrome sa

    Jan 1, 2000

  • SME
    Miner Act Technology: Past, Present, and Future

    By S. M. Moore, J. F. Burr, R. Fernando, D. Snyder

    "The Mine Improvement and New Emergency Response Act of 2006 (MINER Act Public Law 109-236) was passed by Congress in response to three major underground coal mine accidents in the United States that

    Jan 1, 2017

  • SME
    Optimum Open-Pit Mine Scheduling Considering Multivariate Grade Uncertainty Using Deep Q-Learning

    By Sebastian Avalos, Julian M. Ortiz

    The long-term mine scheduling is the optimal decision on how to extract and process the mining reserves. The resulting plan is mainly driven by economic, metallurgical, and geological factors. Account

    Jun 25, 2023

  • TMS
    Mixture Design Applied to the Electrochemical Reduction of CaW04 to W

    By Metehan Erdogan, Orhan Gökçe Göksu, Ishak Karakaya

    "An experiment (mixture) design was created to optimize the process parameters of the electrochemical reduction of CaW04 to W in molten CaCl2-NaCl eutectic mixture. Temperature, applied voltage and th

    Jan 1, 2012

  • NIOSH
    Minerals In The U.S. Economy: Ten-Year Supply-Demand Profiles For Mineral And Fuel Commodities

    The accompanying supply/demand flow diagrams and 10-year tables for mineral and fuel commodities present essential data required by government, industry, and others to formulate policies and programs

    Jan 1, 1975

  • IMPC
    A Process of Producing Magnesium Sulphate by Treating with Waste Water from Titanium White Plant

    By Q. W. Jiang

    This paper presents a new process for producing industrial magnesium sulphate using waste water from titanium white plant and magnesium oxide from calcinations of magnesite ore as raw materials. With

    Jan 1, 2014

  • SME-ICGCM
    Premature Rock Bolt Failure Through Stress Corrosion Cracking (SCC)

    By Bruce Hebblewhite

    An ACARP-funded industry research project in Australia recently investigated the problem of premature rock bolt failures in underground coal mines. The project carried out limited sampling from 9 diff

    Jan 1, 2003