Search Documents

  • AIME
    Surface-Hardening and Hard-Surfacing

    By C. E. MacQuigg

    MAN?S desire to harden metal is older than recorded history and obviously would date from the moment when he found his implements were not equal to the demands of service. This need for hardness in me

    Jan 1, 1939

  • AIME
    Sinking With The Hydro-Mucker At Mather "B" Shaft

    By Westwater, J. S.

    The Mather mine of The Negaunee Mine Co. embraces nearly all of Sections 1 and 2, T47N, R27W. within the limits of the cities of Negaunee and Ishpeming on the Marquette iron range of Michigan's U

    Jan 1, 1949

  • DFI
    Shoring of Long Beach Main Pump Station Utilizing Ground Improvement Methods, Long Beach, CA

    By Eric Lindquist, John Compagnone, Gabriel Carvajal

    "Condon-Johnson & Associates, Inc. (CJA) with the assistance of design consultant, Brierley Associates, designed and installed a water tight shoring system utilizing several ground improvement techniq

    Jan 1, 2017

  • SME
    Control Of Copper In Carbon Adsorption And Gold Recovery Circuits - American Girl Mining Experience

    By C. L. McKenzie

    American Girl Mine is located in the Cargo Muchacho Mountains in the southeastern Imperial Valley of Southern California. Production from the current open pit mine and heap leach recovery system began

    Jan 1, 1993

  • AIME
    49. Iron Ore Deposits of the Iron Springs District, Southwestern Utah

    By J. Hoover Mackin

    The iron ore bodies of the Iron Springs district are replacement deposits of magnetite and hematite in Jurassic limestone around the borders of three intrusions of quartz-monzonite porphyry. Productio

    Jan 1, 1968

  • SME
    Maintenance Practices At The Barrick Goldstrike Pressure Oxidation Plant

    By A. Durnan

    Barrick Goldstrike Mines Inc. (Goldstrike) operates a six circuit (train) pressure oxidation plant for the pretreatment of gold bearing sulfide ores. The property is located 27 miles north of Carlin,

    Jan 1, 1994

  • CIM
    Industrial Engineering at the Jeffrey Mine

    By J M. Fletcher

    The responsibility and scope of the Industrial Engineering Department, as organized at the Jeffrey mine, has been broadened to include any study, project or report that could result in more effective

    Jan 1, 1963

  • DFI
  • AUSIMM
    A new approach to implement quality assurance and quality control to technological innovations – quality of spectral data capture and processes in the minerals industry

    By M Haest, O Dominguez, D Mittrup

    Technological innovations and emerging analytical capabilities are transforming the way drill samples are analysed, with real-time mineralogical analysis made possible. In addition, new business/techn

    May 9, 2017

  • SAIMM
    In-Pit Crusher Location as a Dynamic Location Problem

    By M. Paricheh, M. Rahmanpour

    "The cost efficiency and high reliability of semi-mobile or combined in-pit crushing-conveying (IPCC) and truck systems, compared to conventional truck-shovel systems alone, make them more attractive

    Jan 1, 2017

  • AUSIMM
    Logistics in Mining Towards 2000 'The Low Cost Provider'

    A combination of the needs of business, employee desires and safety and health considerations is stimulating increasing attention to the time spent by people at work and the timing of that work. Pa

    Jan 1, 1996

  • TMS
    Two-Phase Flow in Tundish Nozzles during Continuous Casting of Steel

    By H. Bai, B. G. Thomas

    "A three-dimensional finite difference model has been developed to study the liquid steel-argon bubble two-phase turbulent flow in continuous casting tundish nozzles. Experiments have been performed o

    Jan 1, 2000

  • DFI
    Guidelines for Selecting Cutoff Wall Systems

    By Mary Ellen Large

    This publication of Deep Foundations Institute (DFI) is intended to provide project owners, design engineers and construction professionals with guidelines for selecting cutoff wall and barrier system

    Jan 1, 2021

  • CIM
    Integration and enhancement of mine operations and maintenance — A structured analysis approach

    By P. Roman, L. Daneshmend

    "During the last decade, mining companies have been overwhelmed by technological solutions to perceived problems. This is particularly true with information technology where rapid advances have result

    Jan 1, 2001

  • NIOSH
    Bulletin 99 Mine-Ventilation Stoppings

    By R. Y. Williams

    In this report an attempt is made to discuss the first cost of each of several types of mine-ventilation stoppings, as well as the total annual expense of maintaining a stopping during its required pe

    Jan 1, 1915

  • NIOSH
    RI 9020 - Calcium Chloride-Oxygen Leaching and Metals Recovery From an Arsenical Copper-Cobalt Concentrate

    By G. A. Smyres

    A GaC12--B2 l-eachtng procedure and meEal-recovery method for treating an arsenical Cu-Co sulfide concentrate was developed by the Bureau of Mines as an alternative to smelting, which is no longer con

    Jan 1, 1986

  • CIM
    Keynote Address - Energy Session

    By John J. Laffin

    "IN THE BOOK that has been rated the best seller of all time, it is predicted that man will earn his livelihood by the sweat of his brow. Apparently man has accepted the statement as a challenge and h

    Jan 1, 1972

  • CIM
    Water Power in British Columbia

    By Ernest Davis

    WATER power, until developed, produces nothing, but when harnessed it continues to produce, it might be said, indefinitely. Hence the importance of developing all feasible water powers. British Colu

    Jan 1, 1942

  • NIOSH
    IC 6964 Reconnaissance Of Mining Districts In Clark County, Nev. ? Introduction

    By William O. Vanderburg

    This paper 3/gives the results of a reconnaissance of mining districts in Clark County, Nev., made from November 18 to December 22, 1936, and from February 9 to March 8, 1937-in all, 63 days. While th

    Jan 1, 1937

  • CIM
    Accurate Live Measurments for Shaft Aligment during Sinking or Shaft Remediation

    By G. Bonin, A. Jamal, G. Preciado, S. Gillis

    "Accurate, easy to obtain, and reliable methods of measurement are the cornerstone of shaft and tunnel developments - during their sinking, operation and maintenance, or in some cases, remediation. Th

    Jan 1, 2019