Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Pyrometallurgy: The Key to Sustainable Use of MaterialsBy U. M. J. Boin, E. V. Verhoef
Pyrometallurgical reactors constitute a key processing component in the total primary and industrial/recycling resource cycle, being involved both in primary smelting, converting and extraction, as we
Jan 1, 2003
-
Optimización Energética Y Confiabilidad Operativa En La Producción De Gases Del AireBy Daniel Eduardo Parodi
Para acompañar el plan de aumento de producción de slabs de Siderar, fue necesario proyectar una nueva unidad separadora de aire para incrementar la generación de oxígeno, nitrógeno y argón. La premis
Sep 25, 2017
-
Thermal analysis and microstructural evaluation of intermetallic compounds formed during pre- and post-eutectic reactions in 319 aluminum alloyBy S. G. Shabestari
Thermal analysis is a tool that is generally employed to predict the structure of the alloy before the actual casting is carried out. By cooling a sample of the molten alloy and recording the temperat
Jan 1, 2004
-
Improving the Flotation Circuit Performance Using Empirical Simulation at Nunavik Nickel ConcentratorBy J. Bouchard, A. Clapperton, L. Ebacher, N. Singh
"Canadian Royalties Inc. owns and exploits the Nunavik Nickel project: a copper and nickel deposit in Nunavik, Quebec. Froth flotation is used to produce nickel and copper concentrates. As is the case
Jan 1, 2018
-
CFD Studies on the Flow Field Characteristics of the 600 M3 Air-Forced Mechanical Flotation CellBy X. S. Fan, T. R. Feng, D. Chen
To meet the flotation process requirements, the large-scale flotation cell must be designed for sufficient pulp mixing, reasonable air dispersion and solid suspension, which is very difficult to desig
Jan 1, 2015
-
Recent Progress in Milling and Gold Extraction At Giant Yellowknife Gold Mines LimitedBy R. C. Tait
The gold at Giant Yellowknife is intimately associated with a complex mixture of sulphides, including pyrite, arsenopyrite, stibnite, and a wide variety of antimony sulpho-salts. Direct cyanidation ha
Jan 1, 1961
-
Computer Control of Flotation at the Ecstall ConcentratorBy C. Chapman, M. G. Reading, M. P. Amsden
Ecstall Mining Limited, a subsidiary of Texasgulf Incorporated, operates the Kidd Creek mine, a 10,000- tpd base metal producer, near Timmins, Ontario. Two different ore types are mined and milled cop
Jan 1, 1973
-
In-Situ Coal Gasification: The Forestburg (Alberta) Field TestThe principles and utility of in-situ coal gasification are discussed, and a first field test conducted by the Alberta Research Council in 1976 near Forestburg, Alberta, is described. The test was car
Jan 1, 1977
-
Electronic Initiation System in Fosterville Gold Mine DevelopmentBy C. Zuniga, S. Combrinck, C. Peters
Agnico Eagle Gold have partnered with Enaex Australia at their Fosterville gold mine to leverage a combination of drill and blast technologies to optimise underground development mining. The mine is t
Feb 6, 2023
-
Post-mining – A holistic approachBy JURGEN KRETSCHMANN
The European climate and energy framework for 2030 is highlighting the reduction of man-made CO2 by increasing the use of renewable energy. In this spirit, Germany has decided to erase coal use as an
-
Incorporating Ventilation Network Simulation into CFD Modeling to Analyze Airflow Distribution around Longwall PanelsBy M. Fig, A. Juganda, M. Zurhorst, J. Brune, C. Strebinger, G. Bogin
"Understanding the airflow patterns in and around the longwall panel can help to identify poorly ventilated areas that may be prone to methane accumulation. Ventilation network modeling provides quick
Jan 1, 2018
-
RI 9445 - Gob And Gate Road Reaction To Longwall Mining In Bump-Prone StrataBy Alan A. Campoli
The U.S. Bureau of Mines conducted research to characterize longwall gob loading under bump-prone geologic conditions. Bureau-designed stress meters were installed in the floor rock beneath two longwa
Jan 1, 2010
-
IC 8997 Automated Temporary Roof Support (ATRS) Systems For Roof Bolting Machines - Proceedings: Bureau Of Mines Technology Transfer Symposium, Charleston, WV, June 23, 1983This publication contains 10 papers presented at a symposium on ATRS systems in Charleston, WV, on June 23, 1983. Included are papers by MSHA Technical Support (Roof Control), West Virginia Institute
Jan 1, 1985
-
IC 6608 Methods And Costs Of Quarrying, Crushing And Grinding Limestone At The Plant Of The Southwestern Portland Cement Co., El Paso, Texas ? IntroductionBy Robert T. Mann
This paper is one of a series being prepared for and published by the United States Bureau of Mines on the quarrying, crushing, and grinding of limestone for cement manufacture. These papers are desig
Jan 1, 1933
-
The Clean Air Act Amendments of 1990 -An Eastern Coal Producers ViewBy G. W. Luxbacher
With the advent of acid rain legislation included within the Clean Air Act Amendments of 1990, a great deal of uncertainty with regard to price, source and production quantities has been cast into the
Jan 1, 1992
-
Mitigation of Longwall Subsidence Effects on Operating RailroadBy Robert Kimutis, Ke Yang, Yi Luo, Jianwei Cheng
"Surface subsidence processes, especially those associated with a longwall mining operations, could cause operational and/or safety problems to railroads. For railroads with normal amounts of traffic,
Jan 1, 2010
-
Alameda Corridor-East: San Gabriel Trench ProjectBy David Peterson, Terry Tucker, Rafael Serrano
"The Alameda Corridor-East (ACE) Construction Authority awarded a $172.6 million contract to Walsh Construction Company (Walsh) for the construction of a 2.2 mi (3.5 km) long grade separation includin
Jan 1, 2017
-
IC 8281 Respiratory Protective Devices Approved By The Bureau Of Mines As Of October 1, 1965 ? IntroductionBy R. H. Schutz
TO ASSIST users in the selection of reliable and satisfactory respiratory protective devices, the Bureau of Mines bas established five schedules of minimum performance requirements for the approval of
Jan 1, 1966
-
IC 8281 Respiratory Protective Devices Approved By The Bureau Of Mines As Of October 1, 1965 ? Introduction (d50a2866-05cb-4fa4-a5e9-2b585dba8edb)By R. H. Schutz
TO ASSIST users in the selection of reliable and satisfactory respiratory protective devices, the Bureau of Mines bas established five schedules of minimum performance requirements for the approval of
Jan 1, 1966
-
The Underground Quarrying of Backfill Material - A Potentially Viable Option (3e0fe107-4258-4ea0-abd2-b85d48fc35ff)By Robertson AC
Studies by Tennent, Isokangas Pty Ltd (TIP) have indicated that underground quarrying of backfill may be a cost competitive option for providing backfill for specialised situations in underground mi
Jan 1, 1998