Search Documents

  • SME
    Meeting The Requirements Of The Surface Mining Control And Reclamation Act ? Introduction

    By James R. Jones

    The Surface Mining Control & Reclamation Act is a complex piece of legislation signed into law on August 3, 1977. It is the culmination of more than six years of debate by the Congress over the need f

    Jan 1, 1979

  • IMPC
    Enhancement of material handling system efficiency in ZISCO plant by HPGR circuit modification

    By Majid Saghaeian, Rasool Hejazi, Parisa Ghobadi

    "Pulp handling in mineral processing circuits is very complicated due to its inherent different specifications compared with other fluids such as water. Because any variation in ore property (e.g. siz

    Jan 1, 2014

  • CIM
    Use of Glycine as an Alternative Lixiviant to Leach Copper from Chalcopyrite

    By Jaeheon Lee, Junmo Ahn, Doyun Shin

    "Many alternative leaching systems including bacterial leaching have been introduced to avoid passivation on the surface of chalcopyrite and to increase the leaching efficiency of copper from chalcopy

    Jan 1, 2017

  • SME
    Development Of An Adaptive Optimal Control Strategy For An Industrial Ball Mill Grinding Circuit ? Introduction

    By J. A. Herbst

    Ball mill grinding circuits can be subject to upsets that arise from variable characteristics of the feed ore. These upsets are transients in critical circuit variables such as ball mill mass holdup,

    Jan 1, 1984

  • SME
    Methods To Operate Successful Longwalls

    By Dr. Ing. Hermann Boldt

    The Bituminous Coal Mining Industry of the Federal Republic of Germany produces nearly 100 million t/yr of clean coal. The largest coal mining area is the Ruhr District with dimensions of 100 x 40 km

    Jan 1, 1977

  • CIM
    Effect of grain refinement on the tensile and fatigue crack growth properties of sand cast AM60 magnesium alloy

    By M. Mahfoud

    The effect of grain refinement on the tensile and fatigue crack propagation behavior of sand cast magnesium alloy AM60B has been investigated in the present study, C2Cl6 in the amount of 0,3% was used

    Jan 1, 2005

  • CIM
    The Role of Bubble Air Stream in Selective Flotation

    By Vladislava A. Ignatkina, Victor D. Samyguin

    "Within the limits of two-phase approach, considering mass transfer with pulp and air streams was shown that each bubble appears to be an elementary carrier, transporting particles from the collection

    Jan 1, 2016

  • SME
    Palabora - Changing To Meet The Challenge Of The 80's (d5b5051e-9d5f-4235-982c-36a6ba44fe75)

    By J. P. Gliddon

    Since 1980 a number of significant changes have been introduced at Palabora in an effort to off-set the effects of reduced product price and increased unit cost of inputs. These changes and improveme

    Jan 1, 1987

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • ISEE
    Anfo Truck Burn Trials

    By E. Contestabile, B. von Rosen

    Recently, the Canadian Explosives Research Laboratory (CERL) completed its investigation of a truck accident, which involved 18,000 kg of commercial explosives, 13,000 kg of which was ANFO. Over the t

    Jan 1, 2004

  • CIM
    Derive Establishment Strategy of BIM Library Market and Optimal Revenue-Sharing Strategy Between the Business Principals

    By Dong-min Lee

    As the construction industry is becoming more large-scaled and complex, the BIM technology has been utilized throughout the industry. Since 2008, the construction industry in South Korea (Korea) has r

    Aug 1, 2013

  • AIME
    Extractive Metallurgy Division - Sintering Zinc Concentrates on the Blackwell 12 by 168 Ft Machine

    By A. E. Lee

    THE Blackwell Zinc Co., Inc., a subsidiary of the American Metal Co., Ltd., operates a horizontal retort zinc smelter at Blackwell, Okla. The plant has 14 furnace blocks of 800 retorts each, fired wit

    Jan 1, 1954

  • TMS
    Process-Control Scheme of Copper Smelting Processes in Japan and Future View

    By Ryokichi Shimpo, Akio Fuwa

    "In order to elucidate the present status of process-control technology, survey study has been made on the present process control schemes of representative copper smelting and converting processes in

    Jan 1, 1989

  • SAIMM
    Repair works and tests at the Rossio tunnel, Portugal

    By F. Pinto, J. V. Lemos, A. Sousa, L. Ribeiro e Sousa

    The Rossio railway tunnel was built in 1890 crossing several formations involving limestones, basalts and also sandy and clayey formations. Due to the fact that it is an old underground structure reha

    Jan 1, 2003

  • SME
    The Mechanics Of Coal Mine Bumps ? Introduction

    By S. L. Crouch

    The general term "coal mine burp" refers to the sudden and violent failure of in situ coal. Coal bumps occur in most countries where coal is worked by underground methods, and are related to both geol

    Jan 1, 1973

  • CIM
    Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", Poland

    By W. Swidzinski

    "Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola

    Jan 1, 2007

  • SME
    Should the TBM Operators Be Certified?

    By Steve Skelhorn, Dan Ifrim

    "A tunnel project poses many challenges; the operation of the Tunnel Boring Machine (TBM) being one of them. Mechanized tunneling is known as a safe and effective alternative to other methods in terms

    Jan 1, 2016

  • ISEE
    Shock-tunnel Waveform Analysis

    By Joshua Hoffman, Braden Lusk, David McLane, John Rathbun

    The dynamics of explosive detonations are understood; however recreating a real-world, to-scale scenario is costly. The use of a shock-tunnel allows testing to be done on a smaller scale, with the sim

    Jan 1, 2011

  • SME
    Mineworker Fatigue: A Review of What We Know and Future Decisions

    By Zoë Dugdale, Gerald Poplin, Tim Bauerle

    "Fatigue presents several challenges for the mining industry. Depending on the specific occupation, daily work or operational setup on any given mine site, mining jobs can have a fair amount of labor-

    Jan 3, 2018

  • AIME
    Work Place Ground Support at Inco's Thompson Mine

    By G. D. Marshall, D. K. Sarin, V. E. Hampton

    Ground support at the Thompson Mine emphasizes scaling, rock bolting and wire mesh screening on the backs and walls of all underground stoping and development areas and also full column grouted cable

    Jan 1, 1983