Search Documents

Sort by

  • NIOSH
    RI 8536 High-Pressure Shrouded Water Sprays for Dust Control

    By N. I. Jayaraman

    High-pressure shrouded sprays were first tested on a bench to determine air-moving capability and dust collection efficiency. The bench-scale tests indicated that at 500 psi and above, the dust collec

    Jan 1, 1981

  • AUSIMM
    Some Methods of Estimating Quantities, as Applied to Dams, Dumps, Etc.

    FREQUENTLY the Survey Department is caIled upon to estimate the quantity of material in various dumps, dams piles, etc... and in the carrying out of this work various methods may be employed.The metho

    Jan 1, 1925

  • AIME
    Coal - Flowsheet Changes for Decreased Moisture of Concord Mine Coal

    By J. D. Allen

    In the coal preparation plant at U.S. Steel Corp.'s Concord mine in Alabama, the product moisture was reduced from about 20% to 9% through the development of a workable flowsheet for dying the cl

    Jan 1, 1969

  • AUSIMM
    Mining Methods in Use at North Broken Hill Ltd., Broken Hill, N.S.W.

    This paper gives a description of the methods of mining employed at North Broken Hill Limited, Broken Hill, N.S.W.GEOLOGICAL NOTESThe main Broken Hill lode occurs as a replacement of tightly folded pr

    Jan 1, 1940

  • NIOSH
    Bulletin 158 Cost Accounting for Oil Producers

    By CLARENCE G. SMITH

    Prior to the actual development of an oil property it is difficult to determine the quantity of oil under the property and the rate at which this oil can be brought to the surface-factors that determi

    Jan 1, 1917

  • NIOSH
    Bulletin 54 Foundry-Cupola Gases and Temperatures

    By A. W. BELDEN

    Among the investigations that the Bureau of Mines is conducting witha view to increasing efficiency in the utilization of fuels belonging to or for the use of the Government is an investigation of the

    Jan 1, 1913

  • NIOSH
    RI 3249 Chemical Method For Removing Mud Sheaths In Oil Wells

    By H. C. Miller

    The removal of the mud sheaths that are deposited against the faces of productive oil sands during rotary drilling is one of the important problems confronting operators, especially in semidepleted fi

    Jan 1, 1934

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Project Selection and Process Development for Mining Juniors

    By L Lorenzen, H Muller

    "Every year a large number of projects are evaluated by small listed and unlisted mining companies that are hoping to find the ideal project, which will catapult them from a mining junior status to th

    May 24, 2012

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber plant was recently completed at an existing facility, in order to treat the sulphur dioxide off-gas emitted from rotary kilns. Proper planning of the diffe

    Jan 1, 2016

  • CIM
    Mill Installation and Power Development at Big Missouri Mine

    By G. H. McKay

    AT the Eagle mine, near Gilman, Colorado, where the Empire Zinc Company have installed an underground mill, transportation problems were comparatively simple. A railway siding on the Denver and Rio Gr

    Jan 1, 1938

  • DFI
    A Tall Slender Tower Rises On Secant Piles and Drilled Shafts

    By Renzo D. Verastegui, T. C. Michael Law, Sitotaw Y. Fantaye, Alfredas Daugiala

    "When completed, 520 Park Avenue will amend the Manhattan skyline and be one of the most prestigious high rise towers in New York City. The 52-story condominium building is located on a 60 by 100 feet

    Jan 1, 2016

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • SME
    Predicting Vanishing Tons Before Production Starts Or Small Blocks Are No Good For Planning In Porphyry Type Deposits

    By Michel Dagbert

    In the exploitation of porphyry-type deposits, the quality of the ore is mostly defined according to its grade. Besides the simplest distinction, ore-waste, several grade categories may exist and they

    Jan 1, 1977

  • AIME
    An Automatic Stock-Line Recorder for Iron Blast-Furnaces

    By J. E. Johnson

    OF the many items of information necessary to the successful management of the blast-furnace, few are more important than knowledge of the location and movement of the stock-line: whether the furnace

    Mar 1, 1905

  • AIME
    Exploration Of Cuban Iron-Ore Deposits.

    By DIFTIGIHT E. WOODBRIDGE

    (Glen Summit Meeting, June, 1911,) DURING April, May, and June, 1910, I was in charge of an examination of the greater part of the Moa iron-ore area in Oriente Province, Cuba, on the north coast, nea

    Mar 1, 1911

  • TMS
    A Remotely Operable Sensor for Precision Surface Mapping Using Coherent Frequency Modulated (FM) Laser Radar

    By A. Slotwinski, R. E. Barry, M. M. Menon, P. T. Spampinato

    "A coherent FM laser radar based sensor for remote metrology of plasma facing material surfaces in a fusion reactor is described. The sensor is capable of 3-D mapping of surfaces, based on a series of

    Jan 1, 1997

  • SME
    Centrifugal Pump Parts With Superior Erosion-Corrosion Performance

    By G. A. Calboreanu

    The deterioration rate of any metal or alloy is increased in a erosion-corrosion application because the passivated surface layer is removed by the solid particles contained in the pumping fluid and t

    Jan 1, 1997

  • TMS
    Fugitive Emissions Related to Oxidation of Liquid Silicon during Ladle Refining

    By Nils Eivind Kamfjord, Mari K. Næss, Gabriella M. Tranell

    "In oxidative ladle refining (OLR) of silicon, the metal surface is oxidized resulting in the formation of a condensed silica fume (SiO2). In the current work, industrial measurement campaigns were pe

    Jan 1, 2011