Search Documents

  • AUSIMM
    Why Accounting for Uncertainty and Risk can Improve Final Decision-Making in Strategic Open Pit Mine Evaluation

    The objectives of this paper are two-fold. First, it will show what problems can arise when single estimated values are substituted for a distribution of values when evaluating an open pit mine projec

    Jan 1, 2009

  • CIM
    Truck-shovel optimization accounting for cost, safety, and operational practice

    By C. O. Aksoy, H. Kose, K. Ozfirat, T. Malli, A. Gonen, S. Gurgen

    In selecting mobile mining equipment, factors including availability, useful economic life, maintenance and operating costs, and spare parts availability are considered. Given these factors, trucks an

    Jan 1, 2005

  • SME
    Limitations of Acid-Base Accounting for Predicting Acid Rock Drainage

    By J. M. Scharer, Bruce E. Halbert, Pettit. Carol M., Lysane Bolduc

    The ratio of neutralization potential (NP) to acid production (AP) ratio is often employed for predicting acidic discharges from waste rock dumps. The available NP was evaluated in laboratory studies

    Jan 1, 2000

  • SME
    RETC 2015 Full Proceedings - RETC2015

    By Shemek Oginski, MARK C. JOHNSON

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2015

  • SME
    The Modelling Of Froth Zone Recovery In Batch And Continuously Operated Laboratory Flotation Cells

    By Z. T. Mathe, M. A. Vera, M. C. Harris

    This contribution presents a methodology how to quantify froth zone recovery in a continuously operated laboratory mechanical flotation cell. The methodology consists of relating the overall flotatio

    Jan 1, 2001

  • DFI
  • NIOSH
    RI 4288 Flood-Prevention Projects at Pennsylvania Anthracite Mines Progress Report for Fiscal Year Ended June 30, 1947

    By W. E. Cassan, W. L. Eaton, James Westfield, W. M. Romisher, Karl Hughes, S. H. Ash

    "INTRODUCTION Funds were made available to the Bureau of Mines, United States Department of the Interior, for anthracite investigations during the fiscal year ended June 30, 1945. One of the approved

    Apr 1, 1948

  • AUSIMM
    A Progressive, Iterative Approach Leading to Reliable Metallurgical Accounting Sampling Systems

    By F F. Pitard

    The optimization of metallurgical processes requires knowledge of the heterogeneity carried by constituents of interest. The common scenario, almost an industry standard, is to rely on the engineering

    Sep 7, 2015

  • AUSIMM
    The Development of a KPI and Metallurgical Accounting Systems at Nabalco

    By J Barnes

    During September 2000, Nabalco management identified the need for a corporate system to deliver its key performance indicators (KPIs). In June 2001, a need was also identified to replace the existing

    Jan 1, 2002

  • NIOSH
    OFR-130(3)-85 High Reliability Miner Hydraulic System - Volume II -Mining Hydraulics Manual ? 1. Introduction ? 1.1 General

    Hydraulic fluid power systems are advantageous whenever power output must be accurately and safely controlled. The load movers, cylinders, jacks, rotary actuators and hydraulic actuators in these syst

    Jan 1, 1982

  • AIME
    Part II – February 1969 - Papers - Tensile Properties of Unidirectionally Solidified AI-Cu AI2 Eutectic Composites

    By A. S. Yue, A. E. Vidoz, F. W. Crossman

    Tensile specimens were prepared from a single grain of an epitaxially grown Al-CuAl2 eutectic ingot. The eutectic lanzellae were oriented parallel and perpendicular to the tensile axis of the specimen

    Jan 1, 1970

  • DFI
    Foundation Rehabilitation of the Henry Hudson Bridge

    By Dharmil S. Patel, Zoyav S. Benyaminov, Cassandra A. Wetzel

    Rehabilitation of the Henry Hudson Bridge is nearing completion, connecting Spuyten Duyvil in the Bronx to Inwood Hill in Manhattan, New York. Constructed in 1936, the Henry Hudson Bridge spans 840 fe

    Sep 8, 2021

  • NIOSH
    An Appraisal Of Minerals Availability For 34 Commodities ? Introduction ? Program Overview

    The Bureau of Mines, through its Minerals Availability Program (MAP), investigates the mineral supply potential of the United States and market economy countries (MEC's) for a number of minerals

    Jan 1, 1987

  • DFI
    Newtown Creek Pile Foundation Work 2009

    By Thomas Trochalides

    Newtown Creek Water Pollution Control Plant in Brooklyn, NY is the largest of 14 Water Pollution Control Plants in New York City. It services over 1 million people with a current processing capacity

    Jan 1, 2010

  • NIOSH
    RI 5593 Flotation Characteristics Of Goethite ? Introduction And Summary

    By I. Iwasaki

    In recent years the rapid depletion of high-grade iron ores and the demand by blast furnace operators for increasingly low-silica ores have stimulated interest in flotation studies of low-grade iron o

    Jan 1, 1960

  • SAIMM
    The Human Cost Of Sub-Contracting/Outsourcing - Introduction

    By D. Pillay

    Outsourcing? and ?sub-contracting? have become buzzwords in recent years, as SA industry becomes increasingly exposed to the global economy, and global competitiveness. In its effort to ?catch up? aft

    Jan 1, 1999

  • SAIMM
    Internal Logistics Optimisation Of Ferro Alloy Manufacturing Plant

    By Rajib K. Mohapatra, K. Vizaya Kumar

    In any manufacturing organization internal logistics plays a vital role in improving and maintaining the productivity. In Ferro Alloys manufacturing organization where there is huge input of raw mater

    Jan 1, 2007

  • DFI
    Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface Challenges

    By Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo

    Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue

    Jan 1, 2019

  • CIM
    Les Terrains Auriferes Site -Site Closure and Rehabilitation, Conceptual to Construction

    By R. Knapp, R. Firlotte

    "Les Terrains Auriferes (LIA) Property, formerly the Malartic Goldfield (Goldfield) mine, ceased its remaining milling operations in the fall of 1994. During the early years of mining, the mill proces

    Jan 1, 1997

  • IMPC
    Development of a Heuristic Methodology for Designing Measurement Networks for Metallurgical Accounting

    By P. A. Bepswa

    A numerical study done to test the efficacy of heuristics developed for the design of measurement networks for high precision metallurgical accounting is presented in this paper. The heuristics consid

    Jan 1, 2014