Search Documents

  • CIM
    The Princess Colliery Man-Rake Rope

    By Gordon S. Farnham

    THIS paper summarizes the results of investigations carried out at Sydney Mines, N.S., and at Ottawa, following the disaster at Princess colliery, December 6th, 1938. The Honourable Minister of Mines

    Jan 1, 1939

  • SAIMM
    The geometric axial surface profiles of granular flows in rotating drums

    By A. Mainza, I. Govender, Elbasher M. E. Ahmed

    A mechanistic description of axial segregation in rotating drum flows remains an open question. Consequently, optimal mixing of grinding balls and rocks for efficient breakage, maximum production of f

    May 1, 2021

  • AUSIMM
    Bias Testing of Mechanical Sampling Systems for Coal - A Review of Test Results and Call for Use of Multivariate Statistical Analyses

    By C D. Rose

    A review and summary of the results of 120 coal sampling system bias tests is presented. This review supports new methodology using multivariate statistics currently being considered by ISO TC27 SC4.

    Aug 21, 2012

  • CIM
    Geology of the lngerbelle and Copper Mountain Deposits at Princeton, B.C.

    By T. N. MacAuley

    "The Ingerbelle and Copper Mountain deposits are located near Princeton in southern British Columbia. They are owned by Newmont Mining Corporation's wholly owned subsidiary, Similkameen Mining Company

    Jan 1, 1973

  • SME
    The Influence of Stirred Mill Orientation on Calcite Grinding - Mining, Metallurgy & Exploration (2021)

    By HASAN SERKAN GOKCEN, SERKAN CAYIRLI

    The purpose of this study was to investigate the dry grindability of calcite powders in a vertically and horizontally orientable laboratory batch type stirred mill. The experimental results were evalu

    Apr 21, 2021

  • NIOSH
    RI 6788 A Method For Determining The Electrical Resistivity Of Solid Anthracite Specimens

    By Albert F. Baker

    Techniques were developed and circuitry was assembled for measuring the total and volume resistances to the flow of electric current through solid specimens of anthracite. The two-, three-, and four-t

    Jan 1, 1966

  • AUSIMM
    Site Investigation and Design for Melbourne’s New Metro

    By H Asche

    The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper

    Mar 8, 2011

  • IMPC
    The Prediction of Flotation Characteristics of a Disseminated Ore Using Ore Texture Data

    By G. K. Nimal Subasinghe

    The establishment of grind size that optimally liberates the valuable mineral for efficient down-stream processing is of great importance for most mineral processing operations. Reasonably accurate co

    Jan 1, 2014

  • SME
    Prediction Model for Safe Width of Rock Mass Preventing Water Inrush from Fault in Excavation Roadway and Influencing Factors Analysis: a Case Study of the Xintian Coal Mine - Mining, Metallurgy & Exploration (2023)

    By Jie Long, Zijie Liu, Pu Liu, Bo Li, Menghua Li, Qiang Wu

    During coal mine operations, roadways may be located close to faults. When designing these roadways, it is important to determine the width of the rock mass between a roadway and a fault area to preve

    Jul 5, 2023

  • SME
    American College Tunnels in Athens, Greece—Design and Construction of Very Large Diameter Tunnels in Rock

    By S. Schina

    Part of the Imittos Western Peripheral Motorway in Athens is the twin road tunnel in the vicinity of American College, with 20m excavation diameter. In the paper, the environmental and other requireme

    Jan 1, 2001

  • CIM
    Population Growth and Mineral Demand

    By Louis M. Perlman

    CAN PRESENT TRENDS CONTINUE? Can population growth in the world keep going at the average rates of the last few decades, till, say, the year 2000? And beyond? At the same time, can we expect steady i

    Jan 1, 1977

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Extensive Pile Testing of Auger Pressure Grouted Displacement (APGD) Piles, Los Angeles, California

    By Todd W. Armstrong, Michael D. Reader

    "INTRODUCTIONThe Playa Vista Development is the largest urban infill development in the history of the United States. Overall, it encompasses about 1100 acres in the City of Los Angeles and is situate

    Jan 1, 2005

  • IOM3
    The logic of trams

    By Gibson J.

    The writer hopes to prove that the economical tram is of even greater importance than, say, the economical engine, and as no difficult and involved calculations are required, and all the governing fac

    Dec 1, 1916

  • TMS
    Characterization and Utilization of Iron-Bearing Steel Plant Waste Materials

    By Donald R. Fosnacht

    An investigation was initiated to obtain the scope of the problems associated with recycling various waste oxide materials generated at Inland Steel and to identify and? test techniques that could pos

    Jan 1, 1985

  • SME
    Improving Grinding Efficiency By Rationed Ball Charging At Amax's Climax Molybdenum Mine

    By Robert R. Dorfler

    AMPS[. has completed a rationed grinding ball test in a 2.93 m x 2.93 m ball mill at Climax Molybdenum Company. The test consisted of purging the ball distribution formed by charging 100%, 76 mm carbo

    Jan 1, 1981

  • AUSIMM
    An Overview of Current Planning and Production Systems at McArthur River Mine

    By M Gwynne

    McArthur River Mine is located approximately 50 km south-east of the NT township of Borroloola and approximately 120 km from the Gulf of Carpentaria. The mine hosts a series of layered shallow dipping

    Jan 1, 1998

  • IOM3
    Broken Hill area, Australia, as a Proterozoic fold-and-thrust belt: implications for the Broken Hill base-metal deposit: discussion and authors' reply

    By A. L. W. Lips, B. P. J. Stevens, T. J. R. Bareley, E. Rothery, S. H. White

    B.P.J. Stevens contributes a further response to the authors' earlier lengthy reply regarding their paper published in Trans.IMM B, vol.104, 1995, p.B1-B17, contending that despite the positive contri

    Jun 19, 1905

  • AIME
    Robert Linton Heads Nominating Committee

    By Robert Linton

    AT its meeting on May 21, the Board of Directors approved the recommendations submitted by President Lovejoy and named a nominating committee for the year that is especially well distributed as to maj

    Jan 1, 1936

  • DFI
    Jet Grouting for Echo Dam Seismic Rehabilitation

    By Tara Schenk-McFarland, Mark Bliss

    Echo Dam, located near Coalville, Utah, is a facility that provides storage for irrigation and municipal use. Original construction of the dam was completed in 1931. Because of seismic concerns, the s

    Jan 1, 2017