  • CIM
    The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold Corporation

    By P. W. Jensen

    Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,

    May 1, 2003

  • CIM
    Constructing, Commissioning and Operating a Mine at High Altitude - The Collahuasi Experience

    By Colin Lindsay

    "The Collahuasi copper mine, located at an altitude of 4300 meters above sea level in northern Chile, commenced operations late in 1998. The mine is currently the 4‘h largest copper producer in the wo

    Jan 1, 2001

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • CIM
    In Kiruna mineral processing starts underground - bulk sorting by LIF

    By Åke Krukka, Heribert F. Broicher

    "The iron ores of the Kiruna Mine in Sweden are of exceptional quality but for the phosphorus content in certain zones of the orebody. The prevention of mixing ores high in phosphorus with those low i

    Jan 1, 2002

  • TMS
    Characterization of the Flexural Properties of Polyester Matrix Composites Reinforced with Continuous Jute Fibers

    By Sergio N. Monteiro

    Jute fiber reinforced polymer composites are among the most investigated and applied natural composites. In this past decade the mechanical properties of these composites has been assessed for various

    Jan 1, 2010

  • TMS
    Stress Analysis and Deformation Prediction of A Heavy Hydraulic Turbine Blade Casting in Heat Treatment Process

    By Jinwu Kang

    The hydraulic turbine blade of the matensitic stainless steel (Cr13%,Ni5%,Mo1%) is a kind of large and curved shape, which is susceptible to deformation in both casting and heat treatment processes. T

    Jan 1, 2010

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction Test Pile Program - Indicator Pile Test Program - Field Work

    By Darrell L. Beddard

    Pile driving started October 29, 1993 and was completed on January 27, 1994. Field work included driving piling from ground surface at one site and at or near proposed footing elevations for the remai

    Jan 1, 1996

  • IOM3
    Comparison of indicator and ordinary kriging in assessment of in-situ coal quality in a Turkish mine

    By A. E. Tercan, D. Mamurekli

    Ordinary kriging on the assumption of a gaussian error distribution and indicator kriging were used to derive the probability that a given calorific value would or would not be exceeded by coal from a

    Jun 19, 1905

  • CIM
    Improving Quality Control and Combustion in Pyrometallurgical Processes using Multivariate Image Analysis of Flames

    By Gianni Bartolacci, Patrice Nadeau, Szatvanyi. Gerard, Carl Duchesne, Claude Chrétien

    "Combustion is used throughout the mineral processing industry to produce steam in boilers, to dry concentrates in rotary dryers, and to apply heat treatments in pyrometallurgical furnaces. Tight comb

    Jan 1, 2005

  • CIM
    CANMET-MMSL Alternative Binder Technology

    By A. Pratt

    Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET-MMSL has invented an alternative binder technology that

    May 1, 2010

  • SAIMM
    Mathematical Modelling Of Heat Transfer In Six-In-Line Electric Furnaces For Sulphide Smelting ? Synopsis

    An efficient and portable mathematical model has been developed for simulating heat transfer in six-in-line slag-resistance-heating electric furnaces for smelting sulphide ores to produce base metals

    Jan 1, 2011

  • SAIMM
    Rock avalanche run out prediction: combined application of two numerical methods

    By R. Poisel, C. Scavia, Preh A., W. Roth, M. Pirulli

    ABSTRACT: Two methodologies for the three-dimensional simulation of the run out of rock avalanches are presented: one based on a granular approach and the other based on a continuum equivalent approac

    Jan 1, 2003

  • SAIMM
    Bord-And-Pillar Mining In Inclined Orebodies

    By J. T. Jordaan

    Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree This paper addresses the critical parameters that need to be considered when designing a mechan

    Jan 1, 2003

  • AIME
    Pyrophyllite Dust-Its Effect and Control

    By M. F. Trice

    PYROPHYLLITE is a hydrous aluminum silicate (A12Si4010(OH)2)1 that occurs in both the foliated and the massive forms. The foliated variety resembles talc in that it has a greasy feel, a pearly luster,

    Jan 1, 1940

  • AUSIMM
    Presidential Address-The Hauraki Goldfields, N.Z. (d4987ecd-7c0b-443f-b1ef-df0f3c599ca2)

    YOUR Excellency, Fellow Members of the Australasian Institute of Mining Engineers and Gentlemen:-Nearly a decade has passed since our Institute first met in New Zealand. May I, at the very outset of t

    Jan 1, 1912

  • CIM
    Get More from Existing Mining Equipment Through Reliability

    Improved Process & Practices Result In: ? Reduction of undesirable downtime, & expensive secondary damage ? Improved equipment performance & health ? Extension of equipment life, & reduction of ope

    May 1, 2010

  • DFI
    Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - Introduction

    By Nino Catalano

    The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso

    Jan 1, 1994

  • AUSIMM
    Design and Construction of the Yarra River Crossing

    By R Blair

    The Domain and Burnley Tunnels, which are major features of the Melbourne City Link Project, are MelbourneÆs first road tunnels. They are 1.6 km and 3.5 km in length respectively and are being constru

    Jan 1, 1999

  • CIM
    Process Mineralogy of Silver Ores and Applications in Flowsheet Design and Plant Optimization

    By Joe Zhou

    "Mineralogical characterization and metallurgical extraction of silver is challenging due to its complex mineralogy and chemistry. Over 200 Ag-bearing minerals have been identified and a silver-rich o

    Jan 1, 2010