Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cost Effective Concentrator DesignBy G Lane
This paper discusses the factors that contribute to the cost effective design of a concentrator. Concentrator design and layout outcomes are functions of the team (engineer’s and owner’s) participati
Aug 8, 2011
-
Guidelines for Economic Evaluation of ProjectsBy P Card
“Let’s get discipline and quality into easy to understand evaluations!” Project Managers and MetPlant Operators accept poor quality evaluations because they are generally unaware of what they should
Aug 8, 2011
-
Fosterville Gold Mine Heated Leach ProcessBy M Binks
The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo
Aug 8, 2011
-
In-Pit Tailings – World’s Best Practice for Long-Term Management of TailingsBy G M. Mudd
Mine tailings represent one of the two largest sources of mine waste from the minerals industries (the other being waste rock). Given the problems of declining ore grades and growing production, taili
Aug 8, 2011
-
Contract Commissioning and Operation of Western Areas’ Cosmic Boy ConcentratorBy C Dick
Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm
Aug 8, 2011
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle MillBy V Lawson
Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the
Aug 8, 2011
-
IsaMill™ Design Improvements and Operational Performance at Anglo PlatinumBy C Rule
In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan
Aug 8, 2011
-
Engineering and Science in Flotation Cell DesignBy J Euston
In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi
Aug 8, 2011
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas MineBy A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Increasing Capacity and Efficiency of Grinding Circuits with High Frequency ScreensBy J Wheeler
The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an
Aug 8, 2011
-
Predicting Variations in Mill FeedBy P McCarthy
The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction
Aug 8, 2011
-
Filtration Test Work – Extracting the Whole Story for Studies and DesignBy G Bickert
Australia is currently developing and engineering a range of specialised processing options for rare earth (RE) (Lynas, 2011, Alkane, 2005), zirconia (Alkane, 2005), lithium (Galaxy Resources, 2008) a
Aug 8, 2011
-
Secondary Copper Processing using Outotec Ausmelt TSL TechnologyBy J Wood
Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa
Aug 8, 2011
-
The Importance of Evaluating Grinding PerformanceBy R L. Koenig
Previous papers at Metplant conferences have covered the options for crushing and grinding circuit selection. High Pressure Grinding Rolls (HPGR) may have considerable advantages over autogenous mill
Aug 8, 2011
-
Reducing the Energy Required in Grinding Clinker to Cement – Some Case StudiesBy H Benzer
Grinding clinker to finished cement consumes more energy than any other comminution process. World production of cement in 2009 was 2840 million tonnes and the energy required for comminution was 40-6
Aug 8, 2011
-
The Casposo Gold-Silver Project – Process Selection and DesignBy D Connelly
Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi
Aug 8, 2011
-
The Influence of Liner Wear on Milling EfficiencyBy P Toor
Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in
Aug 8, 2011
-
The Great Oil Debate – Does Quenching Oil have a Deleterious Effect on Flotation?By C J. Greet
Oil can enter a flotation circuit from a number of sources (for example, from mining equipment, oil leaks from the grinding equipment and coatings on the grinding media, but to name a few). Folklore g
Aug 8, 2011
-
Solvent Extraction of Uranium – Towards Good Practice in Design, Operation and ManagementBy P Bartsch
Uranium solvent extraction, USX has been applied commercially for recovery and concentration for over 50 years. Uranium in acidic liquor, which is prepared following ore leaching, solid/liquid separat
Aug 8, 2011