Search Documents

Sort by

  • CIM
    The Challenge of Cyanide: Opportunities and Challenges for Backfill Operations Presented by the International Cyanide Management Code

    By C. L. Reichardt

    Pressure exerted on gold producers by regulators, project financiers and civil society in the wake of the Baia Mare tailings spill in Romania during 2000 prompted most responsible gold companies to si

    May 1, 2007

  • CIM
    Convergent Bitumen Recovery

    By Lee Nichols

    Convergent Bitumen Recovery Context of discussion It should be noted that the CBR process is a conceptual bitumen recovery feed methodology, designed to provide supplemental bitumen to the oil sand

    May 1, 2007

  • CIM
    Storage and Safety Issues of Hydrogen as an Energy Vector

    By Pierre Bénard

    To achieve penetration on the energy market, hydrogen must overcome obstacles in the areas of storage, safety and infrastructure. One of the most important is the onboard storage of hydrogen for trans

    May 1, 2007

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Evaluation of the Effect of Mixing Method, Sequence and Time on the Properties of Gelfill

    By C. Doucet

    Since 2001, CANMET Mining and Mineral Sciences Laboratories (MMSL) have worked with Falconbridge Ltd. (now Xstrata Nickel) to evaluate trends in the strength development and water retention properties

    May 1, 2007

  • CIM
    Mechanical Strength of Green Iron Ore Pellets ? A New Approach

    By Mathieu Dubé

    Good mechanical strength of green iron ore pellets is required to avoid breakage and excessive deformation during their handling and further processing. However, green balls with good resistance to ha

    May 1, 2007

  • CIM
    Design and Construction Evolution of the Kemess Mine Tailings Dam

    By Georgia J. Lysay

    The Kemess Mine tailings impoundment is retained behind an earthfill and rockfill dam that, when complete, will measure about 140 m in height with a crest length in excess of 1 km. Due to weak foundat

    May 1, 2007

  • CIM
    Developing Asset Strategies and a Zero Based Budget for an Iron Ore Crushing Plant

    By Jason J. Ballentine

    This paper presents a case study of how an asset strategy and zero based budget was developed for an existing crushing plant that had been purchased from the contract service provider by an Australia

    May 1, 2007

  • CIM
    Stability Analysis of Horizontal and Vertical Paste Fill Exposures at the Raleigh Mine

    The uphole bench extraction strategy at EKJV Management Pty Ltd?s Raleigh Mine, requires simultaneous horizontal and vertical exposure of paste filled stopes. In order to prevent excessive ore dilutio

    May 1, 2007

  • CIM
    Introduction of and Experience Gained With Cemented Hydraulic Fill at the Gossan Hill Mine, Western Australia (5fc42dae-6b1c-469d-926f-1a8ca2654f54)

    On the 26th of June 2000 a hydraulic fill retaining barricade failed at the Bronzewing mine in Western Australia. The barricade failure resulted in the release of 19,000 m3 of saturated hydraulic fil

    May 1, 2007

  • CIM
    Éléonore Project Update

    Éléonore Project Highlights Éléonoreis a multi-million ounce, high grade gold discovery in Québec Currently at the advanced exploration and engineering studies stage Excellent potential for expans

    May 1, 2007

  • CIM
    Integrated Computer Aided Open Pit Design and Planning ?A Case Study?

    By Oyku Selimoglu

    The key to successful mine production plan and subsequent operation is efficient mine layout design and optimization. Pit layout design and optimization allow the delineation and extraction of mineab

    May 1, 2007

  • CIM
    Technologie de Forage et Consommation Énergétique : Étude Comparative

    By Roger Lacroix

    L?arrivée de nouvelles technologies sur le marché des foreuses portables combinée au besoin des mines à mieux consommer l?énergie électrique ont permis d?identifier le potentiel de deux nouveaux type

    May 1, 2007

  • CIM
    Improvement in Performance of Main Ventilation Fan for Mines

    By Sib N. Mukherjee

    Main ventilation fans are used in all the mines and they run continuously 24 hours a day and 365 days in a year. Any improvement in their performance can lead to considerable power saving. The basic p

    May 1, 2007

  • CIM
    Numeric Model of a Cemented Rockfill Span Test at the Turquoise Ridge Mine, Golconda, Nevada, USA

    By D. R. Tesarik

    Researchers from the National Institute for Occupational Safety and Health (NIOSH)1 and engineers from Placer Dome, Inc.2, conducted an underground rockfill span test at the Turquoise Ridge Mine near

    May 1, 2007

  • CIM
    Mine Site Hydrogen Storage and Delivery Model

    By M. C. Bétournay

    Mine site infrastructure for storage and delivery of hydrogen must be standardized and acceptable for routine and safe industrial use before fuel cell technology is adopted as a major power source. A

    May 1, 2007

  • CIM
    Mine Planning for Ore Dilution

    By John G. Henning

    Unplanned ore dilution has a direct and large influence on the cost of a stope, and ultimately on the profitability of a mining operation. This paper presents results of a study on the influence of a

    May 1, 2007

  • CIM
    Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore Fines

    By Stephen B. Hearn

    The SLon Vertical Ring and Pulsating High Gradient Magnetic Separator was developed to overcome multiple disadvantages associated with traditional horizontal type Wet High Intensity Magnetic Separator

    May 1, 2007

  • CIM
    Harnessing a Global Workforce - Best Practice from the Oil and Gas Sector Capability Development and Competence Assurance (CDCA)

    By Alyson Morley

    The mining sector in Canada is facing significant challenges to develop a competent workforce, including increased technical and logistical operational demands, and the imperative to promote local con

    May 1, 2007

  • CIM
    A Study of Cemented Crude Tailings Backfill Technology Based on Vertical Sand Silos

    A key point in the manufacture of cemented backfill is the dewatering and settlement of the total tailings product. A new technology characterized by rapid non-mechanical settlement of total tailings

    May 1, 2007