Search Documents

Sort by

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • SME
    Controls Of Precious Metal Mineralization In West Central Sierra Madre Occidental, Mexico - SME Annual Meeting March 1-3, 1999, Denver, Colorado

    By F. Warnaars

    Historically, this area produced gold and silver from many well-known vein deposits, like Tayoltita, Topia, and San Jose de Gracia. Modern exploration identified three categories of deposits: 1) low g

    Jan 1, 1999

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian mining industry, possibly as a consequence of the downturn in mar

    Jan 1, 1999

  • SME
    Environmental Benefits Of Using Clay Granules In Pesticide Applications

    By D. R. Taylor, R. G. Goss

    The use of clay granules as carriers for pesticides dates from the early 1940's and by the present day represents a business conservatively estimated at between 200 - 300 thousand tons / year in

    Jan 1, 1999

  • SME
    Selection Of A Biooxidation Process For The Pre-treatment Of Refractory Gold Ores

    By James L. Whitlock, Amy E. James

    During the past twenty years, numerous advances have been made in the technologies used to pretreat sulfidic refractory gold ores. These advances have included improved equipment design, increased gol

    Jan 1, 1999

  • SME
    Improvement Of Cyanidation At New Britannia Mine

    By G. Deschenes, M. Fulton

    The New Britannia Mine processes a qumtz-carbonate gold ore containing 4.63 git Au at a rate of 2,200 tpd. The ore contains approximately 3 .0% arsenopyrite, 2. 7% pyrite and the rest is gangue minera

    Jan 1, 1999

  • SME
    Mine To Mill Integration - The Next Step Improvement

    By J. O. Craig Imrie

    Mine operations are being squeezed to do more with less. This is not new. But, where do mine operators turn for the next stage of improvement? Many have waged strong wars on the cost reduction front a

    Jan 1, 1999

  • SME
    Commercial Status Of Bioleaching

    By Corale L. Brierley

    This paper lists commercial bioheap and stirred tank bioleach operations and explains the status of these operations. A total of 17 commercial-scale bioleaching plants have been commissioned. Bioleac

    Jan 1, 1999

  • SME
    Bio-Indicator Evaluation Of Water Quality Impacts From Inactive And Abandoned Mines In The Bear Butte Creek Basin Of The Black Hills

    By A. D. Davis

    Environmental impacts from acidic mine drainage are growing national concerns that are particularly acute in the headwaters of the Rocky Mountain region. In the Black Hills of South Dakota, approximat

    Jan 1, 1999

  • SME
    Accuracy Analysis Of GIS-Based Coal Resource Estimation

    By E. Westman

    Geographic Information Systems (GIS) are becoming a more commonly used tool for resource estimation as they provide not only a database management platform, but also the graphical capabilities to visu

    Jan 1, 1999

  • SME
    The Sage Mill Project

    The Sage Mill Project w approved by Santa Fe Pacific Gold Corporation's Board of Directors in October 1994. The Sage Mill Project included a pressure oxidation plant designed and constructed to p

    Jan 1, 1999

  • SME
    A New Approach For Removing Talc For Upgrading Molybdenite Ores

    By X. K. Jiang

    Upgrading molybdenite ore can be technically difficult and expensive if talc is a major impurity in the ore. The layered structure of molybdenite and talc decreases the surface specificity of floatati

    Jan 1, 1999

  • SME
    Adding A Third Main Fan At The Waste Isolation Pilot Plant (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By K. H. McDaniel, L. Griswold

    The Waste Isolation Pilot Plant (WIPP) is adding a third fan to operate in parallel with, and supplement, its two existing main fans. An engineering analysis conducted in 1995 identified the need for

    Jan 1, 1999

  • SME
    Deep Cut -Ground Control And Worker Safety In Coal Mines (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By E. R. Bauer

    The trend in underground room-and-pillar coal mining is to employ remote-control continuous mining machines and extended cuts, 12 m (40 ft) deep or more. This system of coal extraction, adopted by ove

    Jan 1, 1999

  • SME
    Designing And Managing Unpaved Opencast Mine Haul Roads For Optimum Performance (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By A. T. Visser

    The expansion of surface mining has led to the development of very large off-highway trucks currently capable of hauling payloads in excess of 290t. Mine haul roads have historically been designed emp

    Jan 1, 1999

  • SME
    Application Of Economic Parameters And Cutoffs During And After Pit Optimization (SME Annual Meeting March 1-3, 1999, Denver, Colorado)

    By B. K. Baird, P. C. Satchwell

    The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each

    Jan 1, 1999

  • SME
    Application Of Economic Parameters And Cutoffs During And After Pit Optimization

    By B. K. Baird

    The application of cutoffs during and after pit optimization is examined for a lower-grade multi-metallic copper deposit. Pit optimization requires calculation of the net revenue associated with each

    Jan 1, 1999

  • SME
    Coal Mine Subsidence Prediction Using A Boundary-Element Program

    By Keith A. Heasley

    Historically, the surface subsidence over underground coal mines has been predicted using empirical profile or influence functions which have little or no connection to the actual mechanics of the sub

    Jan 1, 1999

  • SME
    Design Of Stillwater Mining Company's East Boulder Mine

    By B. Strickland

    The decision to accelerate development of Stillwater Mining's East Boulder Mine was made in March of 1998. It required the completion of conceptual designs by July of 1998. This was accomplished

    Jan 1, 1999

  • DFI
    Designed, Load Tested, Installed, And Integrity Tested ACIP Piles At Lovers' Key Site In Southwest Florida

    By Gregory A. Stephan

    A case history of design, prediction, instrumented static load tests on probe piles, installation monitoring, and integrity testing of production piles is presented. Based upon project-specific subsoi

    Jan 1, 1999