Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
SPOTLIGHT on the mechanization of mining operationsBy J. J. Geldenhuys
A colloquium on 'Developments in the Mechanization of Mining Operations' was held in, conjunction with the 1984 Electra Mining Exhibition, at the Milpark Holiday Inn in Johannesburg on 19th
Jan 1, 1985
-
Location And Delineation Of Sea Floor Polymetallic Sulphide Deposits Using The Induced Polarization MethodBy W. H. Pelton
Polymetallic sulphide (PMS) deposits have recently been discovered associated with hydrothermal vents on the sea floor off Vancouver Island, B.C. Visual estimates indicate reserves in excess of 1 mill
Jan 1, 1985
-
IC 8998 Inverted Pyramid-Shaped Plugs For Closing Abandoned Mine Shafts-Galena, KS, Demonstration ProjectBy W. M. Dressel
This Bureau of Mines report describes a shaft closure demonstration project in which 11 inverted pyramid-shaped plugs were used to plug abandoned open mine shafts in Galena, KS, The inverted pyramid-s
Jan 1, 1985
-
Discussions - Relationship Of Fault Displacement To Gouge And Breccia Thickness - Technical Papers, Mining Engineering, Vol. 35, No. 10, October 1983, pp. 1426- 1432 – Robertson, E. C.By D. G. Wilder
D.G. Wilder I found the suggestion that the amount of displacement of a fault can be numerically related to the thickness of gouge or breccia to be both intuitively satisfying and intriguing. I hav
Jan 1, 1985
-
1985 Budget RoundupBy Robert B. Parsons
"The customary onslaught of government budgets this spring offers lots of interesting reading to the mining industry.While the favourable changes tend to get all the fanfare, there are some ""sleepers
Jan 1, 1985
-
In-situ stress determination at Ruttan Mine, Sherritt Gordon Mines Ltd.By R. Pakalnis, H. Miller, Madill. T.
"This paper describes a methodical approach to the estimation of the orientation and the magnitude of in-situ stresses. The study was performed at the Ruttan Mine, Sherritt Gordon Mines Ltd. , a 6,000
Jan 1, 1985
-
Toward a Basic Understanding of Injection Phenomena in the Copper C0nverterBy J. K. Brimacombe
Since the Peirce-Smith converter was introduced to the non-ferrous industry in the early part of this century, there has been a paucity of research on process-engineering aspects of the reactor such a
Jan 1, 1985
-
Strategic Planning For Efficient Underground Mine DesignBy Scott G. Britton
Planning is a management tool used to solve problems and provide data and decision alternatives for company growth, profitability, and direction. Strategic planning is defined as the efforts needed to
Jan 1, 1985
-
Corrosion and Fouling Control in a Cooling Water SystemBy Tobin GJ
Testwork carried out in the cooling water circuit at the Yabulu treatment plant of the Greenvale Joint Venturers (Metals Exploration Queensland Pty. Ltd. and Freeport Queensland Nickel Incorporated) s
Jan 1, 1985
-
Banking Needs For Project Development FinancingBy C. R. Tinsley
A strictly limited number of specialist project finance banks exists, with the necessary specialist personnel able to address project cost-competitiveness, cost and commodity forecasting, joint ventur
Jan 1, 1985
-
HydrometallurgyBy I. H. Warren, F. A. Forward, D. E. Pickett, Ernest Peters, Alvin H. Ross, I. M. Masters, N. P. Finkelstein, R. Derry, A. W. Fletcher
In this section the chemical, physical, and mechanical principles of hydrometallurgical processes are developed and reviewed. Plant practice is not discussed other than to note the metals which are pr
Jan 1, 1985
-
Commodity - Linked Borrowing Opportunities for Resource - Oriented Projects and CompaniesThe traditional form of project financing for resource related projects has involved project financings structured with either recourse to the project sponsor(s) or commercial banks accepting the proj
Jan 1, 1985
-
Evaluation Of Underground Coarse - Coal Slurry Transportation Systems By A Simulation Model (d935be45-f8d1-4dc5-9b83-e154b4daad3f)By H. Sevim
In this paper, the research effort in simulating the operation of underground coarse-coal hydrotransport systems (UCCHS) is summarized. The equipment of the system to be simulated is already optimally
Jan 1, 1985
-
Kinetics Of Biological Ferrous Iron OxidationBy Paul L. Wichlacz
A mathematical model of growth and ferrous iron oxidation for attached bacteria was applied to rotating biological contactor (RBC) units treating acidic mine drainage. The model describes attached bac
Jan 1, 1985
-
Technical sessions emphasize more efficient mining and processing technologies and equipmentBy Steve Karl, Rock Jenkins
The mining industry appears to be slowly rebounding. But many individuals and company officials are still smarting from the beating they received during the recent recession. As a result, companies ha
Jan 1, 1985
-
Sharing Risks And Rewards In International Contract NegotiationsBy Pedro L. Lizaur
INTRODUCTION The degree of success of an association between parties in establishing a new venture ultimately depends on three factors: a. the venture's underlying economic strength, which
Jan 1, 1985
-
Flowing Film ConcentratorsBy F. B. Micheli
Introduction and Historical Background Although both sluices and devices using a simple flowing film are among the oldest known methods of concentration, they are still extensively employed in a vari
Jan 1, 1985
-
Queen Charlotte, Canada - Discovery Of The Queen Charlotte Gold DepositBy V. F. Hollister
The Queen Charlotte gold deposit (also known as the Specogna, Babe, or Cinola) was discovered in late 1970 by Efrem Specogna and Johnny Trico. They were prospecting along the trace of the Sandspit fau
Jan 1, 1985
-
RI 8959 - Bulkheads and Drains for High Sandfill StopesBy R. L. Soderberg
Large open stopes mined by vertical crater retreat or sublevel s are sometimes backfilled with uncemented sand to support the stope walls and alleviate rock bursts. The failure of bulkheads in two dif
Jan 1, 1985
-
A feasibility study on the reclamation of coal waste dumps by bacterial leachingBy R. G. L. McCready, Marco Zentilli
"Brogan coal containing mean averages of 6,93% w/w total sulphur (1.1% sulphate sulphur, 1.6% organic sulphur and 4.24% pyritic sulphur) and 16.34% mineral ash was used as the test coal in these studi
Jan 1, 1985