    Conventional Mining of Coal for Power Generation

    The Electricity Commission of New South Wales operates three power stations located on Lake Macquarie and Lake Munmorah. Coal for these power stations is supplied by three collieries operated by th

    Jan 1, 1972

  • AUSIMM
    The Use of a Decline at Mt. Windarra for Mine Access and Haulage

    A system of decline mine entries and ore haulages has been designed for the Mt. Windarra mine. This choice was controlled by the nature of the ore- bodies, the mining method chosen and the capital

    Jan 1, 1973

  • AUSIMM
    Biological Treatment of Bendigo Refractory Gold Ores - Possibilities for the Future

    R F Johnston 1 ABSTRACT The possibilities for bacterial leaching of refractory gold ores found in the Central Victorian region of Australia are examined. The behaviour of bacteria, especially 77ioba

    Jan 1, 1994

  • AUSIMM
    An Evolutionary Look at Grinding Mill Control

    The automatic control of grinding mills for optimum performance is an area of control which can benefit from new control concepts and technology. Economic pressures dictate that the mining industry

    Jan 1, 1978

  • AUSIMM
    Occupational Health Effects of Airborne Coal Dust and mine Gases

    The last 40 years has seen a dramatic reduction in the prevalence of pneumoconiosis through improved mining engineering associated with continuing medical surveillance of those at risk. Presently t

    Jan 1, 1983

  • AUSIMM
    Preparation Of Environmental Impact Statements For The Mining Industry

    There are a number of methodologies which can be used for the preparation of environ- mental impact statements. Selection of a method depends upon the type of project and the environmental character

    Jan 1, 1976

  • AUSIMM
    The Development And Application Of techniques For The Assessment And Control Of Longhole Open Stope Stability At ZC/NBHC

    The causes and impact of stability problems associated with longhole open stoping (LHOS) at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NBHC) are discussed and LHOS

    Jan 1, 1983

  • AUSIMM
    Mineral Reserve Reporting For Government Requirements

    By Morrison J

    Considerable confusion is to be found in the methods of estimating mineral reserves. The solution appears to be more cooperation between industry and government to agree upon a classification syste

    Jan 1, 1979

  • AUSIMM
    Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace

    By Brown D. N, Troth D. A

    Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b

    Jan 1, 1976

  • AUSIMM
    Productivity Improvement

    Cordeaux Colliery is more logically sited than the historic escarpment Corrimal Colliery, on the same reserve. At Cordeaux the modernisation of mine plans and equipment and the introduction of high pr

    Jan 1, 1991

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum

    By R M. Anderson, S P. Pigdon

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses th

    Jan 1, 1998

  • AUSIMM
    Differential Flotation Commissioning at Telfer

    By C R. Headley, S O. Hille, N P. Jacob

    The redevelopment of the Telfer Gold Mine in the Pilbara region of Western Australia was primarily based on the construction of a 17 Mtpa dual train concentrator coupled with open pit and underground

    Jan 1, 2007

  • AUSIMM
    The BHAS Copper-Lead Matte Treatment Plant

    By Valenti M

    A by-product of the lead smelting operations at BHAS is a copper-lead matte typically containing 35% copper, 38% lead and 12% sulphur. A hydrometallurgical treatment process has been developed for

    Jan 1, 1989

  • AUSIMM
    Development of Drilling and Blasting Practices at The Vickery Coal Mine

    By Conley R, Payne I

    The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a

    Jan 1, 1992

  • AUSIMM
    Long Term Stability of Rehabilitated Strip Coal Mines

    By Williams DJ

    Preliminary calculations suggest that spoil piles in the Bowen Basin will undergo approximately 4 m settlement as the ground water table recovers after mining is abandoned. Approximately 1 m of di

    Jan 1, 1987

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Hydraulic Stope Filling on the Golden Mile

    Cut and fillstoping using hydraulically placed mill tailings has become an essential feature of stoping operations in Kalgoorlie. ' Approximately 30 per cent of the total production is current

    Jan 1, 1964

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Parameter Adaptive Modelling of Mineral Beneficiation Processes

    Data logged on mineral beneficiation processes during normal operation are analysed using time series (correlation and spectral) methods to identify the dynamics of the processes for on-line computer

    Jan 1, 1985

  • AUSIMM
    Coal for Blast Furnace Injection

    By Scaife PH, Cripps Clark J, Cameron DB

    Tuyere coke samples have been taken through the tuyere openings of B.H.P. International Blast Furnaces since 1978 with Whyalla No. 2 Blast Furnace taking samples on a regular basis since 1982. The

    Jan 1, 1987