Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    "X-ray Computed Tomography – Determination of Rapid Scanning Parameters for Geometallurgical Analysis of Iron Ore"

    By I Basson, J A. Miller, M Becker, F C. de Beer, L C. Bam

    "Geometallurgy brings together geologists, mine planners and process engineers to extract meaningful mineralogical and textural information from an orebody, with a view to predicting its metallurgical

    Jun 15, 2016

  • AUSIMM
    Finding Optimal Soil Restoration Strategies in the Face of Uncertain Future Rainfall Amount

    By S Arnold

    Properties of the soil profile fundamentally control water-limited ecosystems. Soil water availability affects vegetation dynamics of plant communities, but is also affected by these communities in re

    Jul 10, 2012

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Viable and feasible decarbonisation – Tent Mountain coalmine repurposing for the clean energy economy

    By B D. Saffron

    In 1983, open cut coal mining operations were suspended at the Tent Mountain coalmine, located in Alberta, Canada in an area called Crowsnest Pass. Montem Resources (‘Montem’), an Australian mining co

    Aug 2, 2023

  • AUSIMM
    Selection of Mine Water Management Options Considering both Water and Energy Impacts

    By M T. Nguyen, S Vink, M Ziemski

    On any given mine site the water system is contingent upon its initial design. Through time the initial design is adjusted by a myriad of water management options in order to improve water system perf

    Nov 26, 2013

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    A cost-effective tool to assess iron ore products and optimise their operations in blast furnaces towards decarbonisation – state-of-the-art CFD models

    By X Yu, Y Shen

    The iron ore products should be assessed in terms of in-furnace behaviour and overall furnace performance, their operation should also be optimised under industry-scale blast furnace (BF) conditions,

    Sep 18, 2023

  • AUSIMM
    Owner-Operator versus Contractor Production Scheduling - A Vision for the Effective Exploitation of Australian Gold Resources by Surface Mining

    By R Halatchev

    Production scheduling optimisation in open pit gold mining is a complex problem as it is driven by economic criteria reflecting particular economic interests of the concerned parties in the mining bus

    Sep 26, 2013

  • AUSIMM
    Re-defining Compliance Planning through data integration and ultra-short-term scheduling

    By C Fong

    Compliance Planning is an active approach to ensure mining operations align more closely to their longer-term plans. Through Compliance Planning, operations can not only measure their performance on i

    Jun 22, 2022

  • AUSIMM
    Australia's First and Second Nickel Booms: The Similarities and Contrasts

    Between 1966 and 1976, Australia moved from being a non-producer to a position of meeting more than ten per cent of world nickel demand. New mine developments beginning the early-1990s have the prom

    Jan 1, 1996

  • AUSIMM
    Design of raise caving operations in LKAB mines

    By T Ladinig

    Raise caving is a novel cave mining method, which has been proposed for mass mining at increasing mining depths in LKAB operations. The method makes use of the raise mining technology and an active st

    Mar 29, 2023

  • AUSIMM
    A Combined Sorption-Flotation Technology for Gold Recovery From Cyanide Solutions and Pulps

    A viable flow sheet of the sorption-flotation technology for gold recovery from low-grade ores and concentrates using powdered activated carbon modified by organic compounds as the sorbent-bearer has

    Jan 1, 2005

  • AUSIMM
    The Due Diligence Defence Against Personal Liability for Consultants

    By Hancock RG, Dewar GJA

    The mining and exploration industry is governed both directly and indirectly by a complex and constantly changing regulatory and legal system, yet few technical professionals realise the extent to.

    Jan 1, 1995

  • AUSIMM
    Dust Management - Thinking Outside the Square

    Dust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th

    Jan 1, 2009

  • AUSIMM
    An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground Coalmines

    By P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat

    "Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea

    Nov 5, 2014

  • AUSIMM
    Hydrogeological characteristics of co‐disposed tailings and coarse rejects from coal processing

    By S Fityus, K Koosmen, J Simmons

    The purpose of this paper is to therefore investigate the hydrogeological characteristics of tailings, coarse and mixed rejects from coal processing to enable better understanding of the potential for

    Jul 1, 2021

  • AUSIMM
    Arsenic pathways in copper mining – sustainability issues and potential solutions

    By D Bradshaw, E Forbes, M Edraki, M Tayebi-Khorami, E Manlapig

    There is an increasing trend in the extraction and development of copper resources from complex deposits. These deposits pose mineral processing challenges, as they often contain low grade disseminate

    Jul 25, 2018

  • AUSIMM
    What Have we Learnt About Managing Rock Burst Risks?

    By Y Potvin

    Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i

    Mar 21, 2011

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011