Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Be Open to Closure - It Can Save You MoneyBy J Heyes
Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi
Jan 1, 2009
-
Developments in Steel Recycling TechnologyBy Y Pan
The recycling of steel is a crucial aspect of the shift toward a sustainable metals industry. The emphasis on steel recycling through the introduction of the scrap based mini-mill concept is also matc
Jan 1, 2004
-
Transcending the Mining Discipline Divide – Multidisciplinary, Interdisciplinary or Transdisciplinary?By J Coombes
"In today’s challenging climate of reduced staffing, limited funding and uncertain markets, we are called on to operate more productively and ‘be more innovative’. As an industry, we are quick to iden
Mar 8, 2016
-
Shaft Plumbing at Mount IsaIn the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can
Jan 1, 1940
-
The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New ZealandBy R Cooksey
The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou
Aug 22, 2011
-
Orepass Monitoring and Management at Olympic Dam MineBy J Rose, D O’Toole, D Grant
Orepasses are a critical element in the transport of ore from the stope drawpoint to the surface ore stockpile, making them an integral part of an underground mine’s ore-handling system. Well-designed
May 9, 2016
-
The Evolution of Wall Control Programs at Kidston Gold MinesBy A Marton
Concerns with crest losses have seen changes to a number of design and operating parameters to retain the integrity of the wall and the berms of the Kidston Gold MinesÆ Eldridge Pit. Until trials bega
Jan 1, 2001
-
Getting the Most out of Technology to Drive Mine Productivity ImprovementsBy K Sommerville, J Parkinson
"Open pit mines today have more technology and data available. The challenge is to effectively use resources to analyse and identify mine productivity improvements. AMC Consultants Pty Ltd (AMC) has c
Nov 15, 2016
-
The Separation of Pentlandite from Chalcopyrite, Pyrrhotite and Gangue in Nickel Projects Throughout the WorldBy L Kormos, V Lawson, G Hill, G Marrs
"In sulfide nickel deposits throughout the world, pentlandite and pyrrhotite are commonly found together along with varying amounts of chalcopyrite and platinum group minerals (PGMs). The mafic or ult
Sep 1, 2014
-
Professional Development for Metallurgists – Improving Technical SkillsBy D Drinkwater
In 2009, Peter Munro and Peter Tilyard examined the “human capital” in the mineral processing sector in a paper entitled Back to the Future (Munro and Tilyard, 2009). One of their major concerns was
Aug 8, 2011
-
Implementation of a Heuristic Algorithm to Optimise Stope Limits with Excel ModulesBy Baafi E. Y
A heuristic approach for the optimisation of the stope geometry is presented. The heuristic method uses economic model of a given deposit to search for the best combination of mining blocks that res
Jan 1, 1998
-
Using Life Cycle Analysis to Assess the Toxicity Impacts of Waste Streams from Metal Production ProcessesBy N Haque
Base metal ores contain low levels of toxic/hazardous elements such as arsenic, antimony, bismuth, cadmium, lead and mercury. Given the large tonnage of base metal ores mined and processed each year g
Jan 1, 2009
-
Innovative Tailgate Mobile Goaf Gas Management in Two Gate Road Longwall Panels – Concept to ImplementationBy B Belle
In a deep, gassy predrained coalmine, ventilation and goaf drainage systems act as critical controls to manage longwall (LW) panel return gas levels. The goaf capture efficiency of most LW panels rang
Aug 31, 2015
-
Reconciliation of Orebody Model Predictions – System and PeopleBy T Burns, P Savory
In 2013, Rio Tinto Iron Ore (RTIO) produced 251 Mt from 15 mines in Western Australia. Throughout the mines, Ore Reserve models are used for long-term and medium-term mine planning. Grade control data
Aug 18, 2014
-
Development – Back to BasicsBy I T. Ross
In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic
Mar 24, 2014
-
Improved Flotation Process Control at Newcrest's Telfer OperationBy S Hille, J Karageorgos
With the increased variability of todayÆs large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcrest Te
Jan 1, 2007
-
Post Closure Management of the Mt Leyshon Gold Mine - Water the IntegratorBy T Baumgartl, D Mulligan, R Haymont
Mining at the Mt Leyshon Gold Mine in semi-arid north Queensland stopped in 2002. Newmont Australia has recently initiated a thorough post-closure water management study of the site by revisiting the
Jan 1, 2006
-
Cannington Mine Development Project 1993 - 1998The Cannington silver lead zinc deposit is located near Mt Isa in North West Queensland. This world class orebody is owned by BHP World Minerals (BHP) and is estimated to contain 45 million tonnes of
Jan 1, 1998
-
Biological Processes for Gold RecoveryBy I R. F MacCulloch
Bacterial oxidation of sulfide minerals is a familiar and commercially available process to enhance gold recovery with problem ores. Pintail Systems, a Colorado, USA based company had developed bio-pr
Jan 1, 2004
-
Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium MineThe Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of
Jan 1, 2002