Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Design and Commissioning of the Ridgeway Concentrator

    By B Clemen, D Gordon, F Cesnik, P Griffin

    In March 2002 Newcrest Mining Ltd commissioned a 4 Mtpa gold-copper concentrator at its Cadia Valley Operations in New South Wales. This paper presents the design and construction considerations, comm

    Jan 1, 2003

  • AUSIMM
    Martha Hill Mine - The Mining Contractor's Viewpoint

    By R Butler

    Contract m1n1ng in New Zealand developed in the coal industry and has become an element in the success of recently opened hard rock gold mines. At Martha Hill, the mining contractor is undertaking a w

    Jan 1, 1991

  • AUSIMM
    Metallurgical Practice in the Beach Sands Industry

    The history of the industry which recovers rutile and zircon from the heavy mineral beach sand deposits of Eastern Australia began with the initial discovery of zircon in 1895. Whereas a large number

    Jan 1, 1963

  • AUSIMM
    Review on the Ore Deposit Denudation Degree

    By S Q. Zhao, J H. Wei, Z X Zhao, S N. Liang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The degree of regional denudation is one of the most important factors for judging the pres

    Mar 18, 2015

  • AUSIMM
    Commissioning of the Barrytown Ilmenite Pilot Plant

    By T Wootton

    The Barrytown ilmenite pilot plant was commissioned in two stages using Westport Titanium Project heavy mineral concentrate. The wet concentrator was commissioned on the 17 December 1989 and produced

    Jan 1, 1990

  • AUSIMM
    The Downward Trend of Mining - Infrastructure Costs

    By Glassock C. D

    Most Australian mining projects are becoming smaller, more remote and with lower grades of ore. Their small size has been making it harder for mining companies to absorb the large infrastructure co

    Jan 1, 1997

  • AUSIMM
    Characterisation of the Iron Bridge magnetite project

    By B Godel, E R. Ramanaidou, M Verrall

    Fortescue Metals Group Ltd Iron Bridge (IB) operation is a magnetite deposit located in the Pilbara region of Western Australia situated around 145 km south of Port Hedland. This Mesoarchean deposit b

    Sep 18, 2023

  • AUSIMM
    The Use of Isanol at Roseberry Mine

    The problems encountered with the introduction and use of Isanol underground are described. Significant direct as well as indirect savings have resulted from the use of Isanol. Field studies have s

    Jan 1, 1977

  • AUSIMM
    The Extraction of Metals from Geothermal Fluids

    Spectrum Resources commenced operations as a public listed mining company in August, 1983, with a variety of precious metal projects in New Zealand. At that time the outlook for most mineral commoditi

    Jan 1, 1986

  • AUSIMM
    Investigations on the Martha Hill Gold Prospect

    Mining at Waihi on the Martha Hill commenced in 1878 and between 1892 and 1953 produced 35 million ounces of bullion from some 13.5 million short tons of ore from 40 named quartz reefs. The general g

    Jan 1, 1979

  • AUSIMM
    The Phytoremediation and Phytomining of Heavy Metals

    By B R, R Brooks, R Simcock, R Stewart

    As environmental costs incurred by the mining industry become increasingly subject to critical analysis, new technology is necessary to ensure the further development of good relationships between the

    Jan 1, 1999

  • AUSIMM
    The Reduction of Nickeliferous Laterites: Thermodynamic Considerations

    By Turnbull A. G

    Thermodynamic calculations based on the ideal system NiO - Fe203 - H2(g) - CO(g) - H2O(g) - CO2(g) show that it is not possible to selectively reduce nickel oxide in the presence of hematite because f

    Jan 1, 1980

  • AUSIMM
    Geology and Exploration of the Hamata Deposit

    By Young DJ

    Gold mineralisation at the Hamata prospect is related to a series of stacked pyrite and quartz-pyrite veins associated with a number of shears which strike N to NE and dip E. Mineralisation is con

    Jan 1, 1991

  • AUSIMM
    Establishing Metal Levels in the Ohinemuri River

    By W Donovan

    Concern exists about the potential release of metals from the proposed mining operation at Martha Hill to the Ohinemuri River. Speculation on possible impacts is fuelled by the dearth of published dat

    Jan 1, 1986

  • AUSIMM
    The Blackwater Mine at Waiuta - Exploration Options

    The Reefton Goldfield on the West Coast of the South Island of New Zealand was a significant gold producing area between 1860 and 1951. During this period it produced approximately 2.1 million ounces

    Jan 1, 1992

  • AUSIMM
    The Starra Au-(Cu) Project, N.W. Queensland

    Exploration by Cyprus Minerals Australia Company (formerly Amoco Minerals) has successfully outlined significant Au-(Cu) mineralisation at Starra, 150 kilometres south-east of Mt. Isa. Mineralisation

    Jan 1, 1986

  • AUSIMM
    Coal Utilisation at the Kalgoorlie Nickel Smelter

    To counter depressed world nickel prices, a continuing effort is being made at Kalgoorlie Nickel Smelter to reduce unit production costs. One major area in which production costs can be reduced is

    Jan 1, 1987

  • AUSIMM
    The Prevention of Silicosis by Metallic Aluminum

    By Robson W. D, Irwin D. A

    In November, 1932, an investigation of silicosis was undertaken at the, McIntyre Porcupine Mine, Schumacher, Ont., atfer a discussion of the problem with Sir Frederick Banting and his, staff. As a res

    Jan 1, 1945

  • AUSIMM
    Development Aspects of the Golden Cross Project

    Permitting, engineering and evaluation, detailed design and construction aspects of the Golden Cross goldmining project in New Zealand are briefly reviewed. The extremely lengthy and complicated gover

    Jan 1, 1990

  • AUSIMM
    Instrumentation and Control in The Cobar Concentrator

    The treatment meIhods selected for the concentrator at Cobar Mines Pty. Ltd. called for a high degree of automatic control of both the grinding and flotation sections.The resulting concentrator layout

    Jan 1, 1969