Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Comparison of the Geological and Grade Distribution Models in Sheytoor Iron Deposit, Bafq, Iran

    By A. Rahmati

    Geological and geo-statistical modeling of the ore deposits play a prominent role in resource and reserve estimation for geo-statistical evaluations. Sheytoor iron deposit is located in the Bafq iron

    Aug 1, 2013

  • CIM
    The Advantages of Standardizing Radiometric Exploration Measurements, and How To Do It

    By A. G. Darnley

    "IntroductionTHE PURPOSE of this paper is twofold. Firstly, to drawn attention to recommendations which have been accepted by the International Atomic Energy Agency concerning radiometric reporting me

    Jan 1, 1977

  • CIM
    A method to synchronize the tandem dragline systems

    By B. Erdem, N. Çelebi

    An important problem associated with tandem dragline systems is that of matching the productive capability of individual draglines in the combination. In this paper, a dependence mechanism among dragl

    Jan 1, 1999

  • CIM
    Yamana Chapada’s Optimisation of a Copper/Gold Plant

    By T. Banerjee, R. deS. Almeida, D. Gudgeon, F. C. F. Batista, L. deÁ. Silva

    "Yamana Chapada’s mine is one of the larger copper-gold mines in Brazil. The mine is located in Goiás state, in the central part of Brazil. The mine has estimated Mineral Reserves of 4.1 million ounce

    Jan 1, 2018

  • CIM
    Computer Adjustment of Metallurgical Balances

    By H. W. Smith, N. Ichiyen

    A convenient method for the calculation of metallurgical balances, based on statistical treatment of all available data, is presented. An error analysis is included. Examples show the advantages of th

    Jan 1, 1973

  • CIM
    Concrete Reinforcement Modeling for Efficient Information Sharing

    By S. Aram

    Concrete reinforcing requires coordination among many roles: structural engineer, estimator, detailer, fabricator, installer and others. The methods used to define and represent concrete reinforcement

    Aug 1, 2013

  • CIM
    Reclamation from Coal Mine Waste Dumps

    By G. C. Hambleton

    "The author has had wide experience in the reclamation of coal from coal mine waste dumps in the United Kingdom.The paper includes such topics as the processing decision and factors affecting processa

    Jan 1, 1972

  • CIM
    Using Operational Readiness and Plant Trials to Successfully Implement a Process Flowsheet Change

    By C. H. Buck, A. J. Taylor

    "In 2015 Vale’s Clarabelle Mill began the process change to enable a higher degree of Cu separation. The flowsheet modification was part of a complete divisional flowsheet change being implemented in

    Jan 1, 2018

  • CIM
    Resolving Detrimental Seasonal Effect on the Flotation Processes at Niobec

    By J-S. Marois, F. Cappucitti, Y. Dodier, D. Downey, G. Matton

    "The flotation processes of the Niobec Mine have been affected by a seasonal loss of recovery and a significant increase in reagent consumption over the past few winters. This paper discusses the prob

    Jan 1, 2018

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    Geological Structure Disclosed in the Keeley Mine

    By H. C. Boydell

    Introduction Situated in the district of South Lorrain, some 16 miles southeast of Cobalt, Ontario, and reached from that centre either by branch line of the T. & N. O. railway or by what, for a mini

    Jan 1, 1931

  • CIM
    Gas Dispersion Management In A Copper I Molybdenum Separation Circuit

    The effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H

    Jan 1, 2007

  • CIM
    Transforming the Effectiveness of the HPGR Circuit at Anglo Platinum Mogalakwena

    The Anglo Platinum Mogalakwena North concentrator was one of the first three hard rock mineral processing applications to utilise a HPGR circuit in preference to a SAG milling circuit. This was driven

    Jan 1, 2012

  • CIM
    Canada's Resources in Building Stone

    By W. A. Parks

    Stone that may be applied to purposes of construction is available in nearly all the inhabited parts of Canada, the most important exception being the prairie region, but, even here, the deficiency is

    Jan 1, 1925

  • CIM
    Improved Malachite Floatability via Depletion-Induced Attraction Force

    By Junhyun Choi, Allan Gomez-Flores, Chonbuk National University, Siyoung Q. Choi, Gahee Kim, Seungkon Kim

    In this study, to confirm the effect of depletion attraction on the flotation, we theoretically and experimentally investigate the effect of the depletion attraction force on flotation. While varying

    Jan 1, 2016

  • CIM
    Status of Ventilation and Cooling in South African Mines

    By W. N. Roman

    This paper will examine the challenges involved in ventilating and cooling South African mines, with particular emphasis on solutions to the issues of heat (generally associated with depth), mechaniza

    Aug 1, 2013

  • CIM
    Iron Ore in Canada, 1970-1980

    By B. M. Monaghan

    "The developments of the 1950s and 1960s have seen Canada become an international source of iron ore, trading in all geographical areas and hemispheres. Canada's production will significantly increase

    Jan 1, 1971

  • CIM
    Separation of Electrode Foils from Li-Ion Traction Batteries

    By Martha Gellner, Lutz Wuschke, Hans-Georg Jackel, Urs A. Peuker

    "Electric vehicles are an alternative to the existing combustion engine driven cars. According to the EU Battery Directive a substantial recycling rate of at least 50 wt.-% has to be met for aged batt

    Jan 1, 2016

  • CIM
    Mineral Resources of the Peace River Area, British Columbia

    By M. Y. Williams

    Introduction During the economic investigation of Pacific Great Eastern Railway subsidy lands, the P.G.E. Survey of Resources made a geological and mineral survey of a large part of the valley of the

    Jan 1, 1934

  • CIM
    Mac porphyry molybdenum prospect, north-central British Columbia

    By G. R. Cope, C. D. Spence

    "The Mac porphyry molybdenum prospect is located 100 km east of Smithers in central British Columbia. The identification of anomalous levels of molybdenum, copper, and silver in three adjacent lakes,

    Jan 1, 1995