Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
130 M Deep Bored Piles – A New SuperlativeBy Vijay Kumar, Serhat Baycan, Karsten Beckhans
For the deep foundation of podium and tower of the Kuala Lumpur City Centre, BAUER (MALAYSIA) SDN. BHD. constructed 225 bored piles with diameter range of 2.0 to 2.5 m. In order to comply with the dep
Nov 1, 2022
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site CharacterizationBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Building Risk Assessment For Urban Rail Transit Systems In India - Current Practices And ChallengesBy Manchanda H, Agarwal J.
The construction industry has one of the largest numbers of injuries compared to other industries. Thus, reducing accidents and determining construction risks are extremely important. One of the essen
Sep 1, 2022
-
Load Tests on Drilled Shafts at Goethals Bridge ReplacementBy John P. Turner, Steven S. Dapp, Dan A. Brown
"The Goethals Bridge Replacement (GBR) spanning the Arthur Kill Waterway between Elizabeth, NJ and Staten Island, NY is supported on over 200 drilled shaft foundations ranging in diameter from 4.5 ft
Jan 1, 2016
-
Multiple Foundation Systems For The Porter Street Outfall Relocation For The North Approach - SummaryBy William D. Spielvogel
The Massachusetts Highway Department awarded the Porter Street Outfall Project to the J.M. Cashman Company in November 1991. Timely completion of the Project in one and one half years is critical to t
Jan 1, 1994
-
Soil-Mix-Sandwich (SMS)By Ali S. Fayad
"In June 2014, Orange County Flood Control District (OCFCD) completed construction improvements of the East Garden Grove-Wintersburg Channel for a price of $42 million. Instead of the pre-existing tra
Jan 1, 2015
-
Cost and Technical Comparison of Non-Destructive Test Methods for Drilled ShaftsBy Ronnie Melker, Joel Webster, Daniel Belardo, Thomas Hyatt
Quality assurance of drilled shafts is highly dependent upon the construction practices used during the excavation and concrete placement process. When performed under slurry, challenges are presented
Jan 1, 2019
-
Experiences From The Italian High Speed Rail Network AV ConstructionBy Vincent Jue
In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.
Jan 1, 2010
-
Seismic Design for the I-30 Crossing Project in Little Rock, ArkansasBy David S. Graham, Benjamin Turner, Paul J. Axtell
Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an
Sep 8, 2021
-
Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-In-Place and Drilled Displacement Piles"1 INTRODUCTIONThe use of nondestructive testing (NDT) methods to evaluate the integrity of Augered Cast-in-Place (ACIP) and Drilled Displacement (DD) piles has been a subject of significant debate am
Jan 1, 2016
-
Buckling Resistance of Steel Micropiles with Mechanical SplicesBy Fredrik Sarvell, Harald. Ihler, Veli-Matti Uotinen, Jukka Rantala
"Many of the valid international building codes state that the lateral support provided by the soil is sufficient to prevent buckling of fully embedded piles. However, the development of small diamete
Jan 1, 2014
-
Assessment of Existing Bulkhead Walls for Dredging ImpactsBy Rakam Lama Tamang, Michael J. Byle, Stephen Ernst
"For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen
Jan 1, 2017
-
Comparison of Non-Destructive Integrity Tests on Experimental Drilled ShaftsBy Armin W. Stuedlein, Jim Zammataro, Bernie Hertlein, Daniel Belardo, Qiang Li, Antonio Marinucci
"An experimental program focusing on four drilled shafts was conducted to determine the effect of high strength steel reinforcement bars on lateral resistance, steel casing on axial and lateral resist
Jan 1, 2016
-
Post-Tensioned Diaphragm Wall "T" Panels For Large Unbraced Excavation Spans - IntroductionBy Nino Catalano
The combination of two top levels of cross-lot braces designed and installed to act as a truss, and vertical post-tensioning of the panels allow the unbraced excavation of a 36' span. Philoso
Jan 1, 1994
-
Determination Of Hydraulic Conductivity Of The Coralline Limestone Aquifer Of Jeddah, Saudi Arabia: Precautions And Recommendations For Deep FoundationsBy Mohamed A. Eliwah
This paper deals with the determination of hydraulic conductivity of the coastal coralline limestone aquifer of Jeddah, Saudi Arabia. This coastal area has witnessed urban development and establishmen
-
Large Diameter Drilling Operations Of Multi Head Down The Hole Hammer Drill Through Boulders And Granite - Mach Drilling System And Some Construction ExamplesBy J. Nakayama
Construction of foundation piles or diaphragm walls through rocky or boulder containing formations has been long-standing difficulty. It has been widely understood that the down-the-hole hammer is t
Jan 1, 1989
-
PVC And Steel Access Tube Debonding During Sonic Logging Testing For The SC 170 Bridge Replacement ProjectBy Edward L. Hajduk
During sonic logging quality control testing of the drilled shaft foundations for the replacement bridges crossing the Broad and Chechessee Rivers for SC 170 in Beaufort County, South Carolina, irregu
Jan 1, 2004
-
Load Test On A Model Pile Driven Into Sand ? SummaryBy A. Mazzucato
This paper presents the experimental results of driving and load tests on an instrumented pile driven into a test pit filled with fine homogeneous sand.
Jan 1, 2010
-
Piled-Raft Foundation (PRF) Optimization Design With Connected And Disconnected PilesBy A. Eslami
In recent development of piled raft design, the contribution of both raft and piles to tolerate the loads is taken into account, depending on the stiffness and contributions of involved elements i.e.;
Jan 1, 2008
-
New CIGMAT Downhole Penetrometer (DHP-CIGMAT) For Use During Drilled Shaft ConstructionBy C. Vipulanandan
It is critical to monitor the ground conditions during excavation and drilling of boreholes during construction to identify possible changes in the soil and rock formations. Drilled shafts are increas