Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Effc/Dfi Guide To Support Fluids For Deep Foundations

    By Chris Harnan, Christophe Justino

    The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20

    May 1, 2022

  • DFI
    Data Drives Herbert Hoover Dike (Hhd) Rehabilitation Efforts

    By Michael Arnold, Jignyash Manyam, Yoav Rappaport

    The USACE required construction of over 13 miles of cutoff wall at an average depth of 65 feet for the Herbert Hoover Dike (HHD). To meet project requirements, to provide quality control and make soun

    Oct 1, 2022

  • DFI
    Automated Instrumentation For ACIP And Drilled Displacement Piles - 1. Introduction

    By John Lemke

    Current practice for monitoring static pile load tests commonly consists of measuring load and displacement at the top of a pile. This is typically accomplished by monitoring dial gauge movements, lin

    Jan 1, 2002

  • DFI
    Nonlinear Spring Functions For 3-D Seismic Responses Of Structures On Piles

    By Nien-Yin Chang

    The contemporary seismic response analysis of structures using a finite element analysis code requires six elastic spring constants to address the six degrees of freedom ground/foundation contribution

    Jan 1, 2007

  • DFI
    Computation Of The Load/Settlement Behaviour Of HP-Bearing Piles - 1. Introduction

    By E. E. De Beer

    This paper describes a method for the determination of the settlement of an individual H-bearing pile, based on the results of CPT-tests. As implied by the nature of the problem, no analysis perform

    Jan 1, 1987

  • DFI
    An Unusual Permanent Shoring Job

    By Gordon Demetrick

    3900 Yonge St. was not a typical site on which to build a condominium apartment. A steep hill covered the majority of the site. In order to use as much of this site as possible, the rear of the buildi

    Jan 1, 1987

  • DFI
    Experimental And Theoritical Studies On Pile Capacity - Synopsis

    By K. Rambha Devi

    The paper is an attempt to co-relate the findings of pile capacity using a number of formula suggested by various authors with the actual field load test results. Five locations consisting of wholly s

    Jan 1, 1996

  • DFI
    Installing And Testing Multi-bar High Capacity Rock Tiedowns

    By Andrew Pontecorvo, Steven Lowe, David Sposito

    Buildings with large height-to-width ratios require foundations with significant uplift resistance. This paper presents a case study of the permanent rock tiedowns installed for One Manhattan West, a

  • DFI
    Analysis Of Vibratory Driven Pile ? Introduction

    By Sherrill Gardner

    Vibratory drivers have been used since the 1930s to drive and extract piles. Vibratory pile drivers have the capability of significantly decreasing pile installation time, especially in granular type

    Jan 1, 1987

  • DFI
    Toe Protection For H-Piles On Sloping Bedrock At Rainy River - Summary

    By Jon E. Bischoff

    Construction of a secondary clarifier on the banks of Rainy River, Northern Minnesota, required the driving of H-piles 14HP102 to a sloping, very strong bedrock through thick deposits of soft and medi

    Jan 1, 1993

  • DFI
    New Outfall Bridge Structures At Bonneville Dam - 1. Introduction

    By Lance Helwirg

    New high and low double outfall bridge structures for a juvenile fish bypass system have been constructed on the Washington Shore approximately two miles downstream from the Bonneville Dam on the Colu

    Jan 1, 2001

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Horseshoe Secant Compression Shoring System For Tunnel Repair

    By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari

    A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten

    Oct 1, 2022

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River

    By Craig H. Olson

    "A new ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at

    Jan 1, 2008

  • DFI
    Philadelphia Dock Story—Pile Challenges at Delaware River (06bf9951-abf5-4656-aab7-81fa955662d4)

    By Craig H. Olson

    "Anew ship dock at a Philadelphia area refinery will be capable of docking the largest tanker to travel the Delaware River, the Stena V-MAX, which will induce significant lateral loads. The loads at t

    Jan 1, 2008

  • DFI
    Contractual Pitfalls To Avoid With ACIP Piles

    By William Babcock

    Augered, Cast-In-Place (ACIP) piles can be an economical, reliable, versatile foundation system. They have also been a part of projects that were behind schedule and the subject of lawsuits. The ACIP

    Jan 1, 1997

  • DFI
    Stabilization of an Existing Cellular Tower Foundation by Installing Jet Grouted Piles

    By David T. Farber

    "Stabilization of an existing cellular tower foundation system without dismantling the tower or compromising the existing foundation system was accomplished by installation of a jet grouted pile syste

    Jan 1, 2005

  • DFI
    Stabilizing A 100 Ft Rock Slope With Limited Access And Tight Construction Tolerances Using Observational Method And Real-time 3d Modeling

    By Travis A. Shoemaker, Mitchell S. Youmans, Nancy T. Chin, Michael S. Senior

    A geologic assessment and stability analysis of the right abutment of Boundary Hydroelectric Dam in Pend Oreille County, Washington was completed in May 2017. The stability analyses identified a poten

  • DFI
    Borehole Loading Test Using A Self-Boring Instrument ? Synopsis

    By H. Mori

    This paper describes a new borehole loading test using a self-boring instrument appropriate for dense sandy soils and stiff clayey soils. The results of loading tests for the bearing strata of deep fo

    Jan 1, 2010

  • DFI
    Secant CFA- Pile Walls - A Risk Management View

    By Mandy Korff

    Walls consisting of CFA-piles are often used for vertical cut offs for building pits. Several methods of installation and geometry may be used and sizes, depths and strengths of walls necessary vary w

    Jan 1, 2006