Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison of Non-Destructive Integrity Tests on Experimental Drilled ShaftsBy Armin W. Stuedlein, Jim Zammataro, Bernie Hertlein, Daniel Belardo, Qiang Li, Antonio Marinucci
"An experimental program focusing on four drilled shafts was conducted to determine the effect of high strength steel reinforcement bars on lateral resistance, steel casing on axial and lateral resist
Jan 1, 2016
-
The Use of DSM Columns to Control Heavy Haul Railway Embankment StabilityBy Kim Chan, Bryn Thomas, Ben Dening
"Increased rail capacity is required into Kooragang Coal Terminal near Newcastle, NSW, Australia to relieve rail traffic congestion and improve management of train arrivals. An additional arrivals tra
Jan 1, 2015
-
Economic Design Of Piling Platforms On Coarse Grained SubgradeBy Patrick Wong
The design of piling platforms is addressed in BRE (2004) for both fine grained and coarse grained subgrades. However, for coarse grained subgrades, piling platform designs can often be overly conserv
Nov 1, 2022
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
The Monroe St. Viaduct: A Case History Of MSE Vibro-Concrete Column Supported EmbankmentBy Paul J. Lewis
Replacement of the Monroe Street Viaduct in southwest Baltimore City, Maryland included transforming 240 feet of the south approach from a pile-supported multi-span bridge to a mechanically stabilized
Jan 1, 2007
-
The EFFC/DFI Carbon Calculator: Why and How to Use ItBy Kimberly Martin
The EFFC/DFI Carbon Calculator provides the deep foundations industry the opportunity to be a leader when it comes to carbon reduction. This tool was created 10 years ago in an extensive effort by the
Nov 1, 2022
-
New Pile for Reduced Underwater NoiseBy Dardis J. T. II, P. G. Reinhall
"Impact pile driving of steel piles in marine environments produces extremely high sound levels in the water. It has been shown that current pile driving noise attenuation techniques provide limited n
Jan 1, 2017
-
PSC Piles Overcome Challenges for $650m Power PlantBy Tim Siegel, III Fondren, Billy Camp
"INTRODUCTIONThe new $650 million power block at Santee Cooper’s Cross Generating Station in Cross, South Carolina is being constructed on driven pre-stressed concrete (PSC) piles. S&ME, as geotechnic
Jan 1, 2004
-
Session 12 "Deep Mixing Method II"By Helen Ahnberg
The scope of the present paper is limited to report the experimental evidence and not for describing the analytical assumptions. However, the idea behind the experimental program is that the deteriora
Feb 10, 2003
-
The Stiffening Effect of a Caliche Layer on Pile FoundationsBy Richard Stone, Rouzbeh Afsharhasani, Moses Karakouzian
"Caliche, a hardened sedimentary deposit of calcium carbonate that occurs worldwide, generally in arid or semiarid regions, is frequently encountered in Las Vegas, Nevada. The presence of a caliche la
Jan 1, 2015
-
Investigations on the Distress to the Pavements/PQC Slab around Monorail Piers, Wadala, MumbaiBy Unnikrishnan Nair, Sandeep S. Nikam, Sanjay D. Patil, Prabir C. Basu
"Mumbai Metropolitan Region Development Authority (MMRDA) entrusted to implement Monorail Systems in various parts of Mumbai Metropolitan Region (MMR) with the objective to supplement the present tran
Jan 1, 2015
-
Cased Auger Piles (CAP): An Effective Piling SolutionBy Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for
-
Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)By Federico Pagliacci
Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d
Jan 1, 2017
-
Session 29 "Grouting for Tunnels 1"By Lynn Crayne
We used Glyoxal as the hardener, at a final concentration of 10% by volume and therefore 20% by volume in the A-Component. They worked pretty well what we did was we shaved the joints on each of the
Feb 10, 2003
-
Retaining Structure for Berth at KrishnapatnamBy P. V. Chandramohan
"The paper deals with the arrangement of structural members for a retaining structure used as a berth in the port of Krishnapatnam. The height of retention is 24.3m. A T-shaped diaphragm wall acts as
Jan 1, 2015
-
“Digital Specialist Foundations”- Using The Digital Twin During Project ExecutionBy Marcus Daubner
This paper explains how BAUER Spezialtiefbau GmbH uses digital methods on projects - starting from work preparation to completion of works. More precisely, the advantages of BIM-based planning during
Sep 1, 2022
-
DFI Europe Monitoring and Instrumentation Committee ObjectivesBy Rob van Dorp
"AbstractThe Monitoring & Instrumentation Committee (MIC) of DFI Europe has the objective to support DFI members in concern of risk management of geotechnical matters, where monitoring and instrumenta
Jan 1, 2014
-
Soil-Structure Interaction For A Tension Pile Pulled With StrandBy Chandramohan P. V
A unique tension pile where the pull is at a point a certain distance below the top of the pile. The pull is transferred by a cable consisting of high tensile strands. The HDPE duct of the cable preve
Nov 1, 2022
-
Performance Monitoring for Deep ExcavationsBy Alexi J. Neill
"This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris
Jan 1, 2016