Prediction Of Settlement Of Structure With Piled-Raft Foundation Using Nodular PilesBy Koichi Kobayashi
Performance-based approach to design of structures including foundations was adopted after enforcement of the revised Building Standard Law in Japan in 2000. The use of piled-raft foundation is favora
Jan 1, 2006
-
p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test DataBy Mahdi Soudkhah, Akhter Hossain
Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri
Jan 1, 2019
-
Pile Driving Between the Amazonas and Xingu Rivers in the Tucuruí-Manaus Transmission Line – Lessons Learned and Solutions Found for a Challenging ProjectBy José Carlos do Amaral, Marcelo Groszownik, Jorge Beim
"Initiated in 2008, the project of this 1800 km long Electrical Transmission Line is a job of extreme technical complexity, crossing regions of major forests and rivers. When ready, it will allow the
Jan 1, 2015
-
Levee Repair and Upgrade by Dual Sheet Pile Walls and Accordion Sheet Pile WallBy Takefumi Takuma, Ali Fayad, Shigeru Kambe
"This paper discusses the unique design and construction circumstances of the cantilevered dual sheet pile walls and the Accordion Sheet Pile Wall for the repair and upgrade of the East Garden Grove-W
Jan 1, 2017
-
Metro Sao Paulo, Line 5, Five Shaft Diaphragm Wall for Brooklin StationBy Dario Libano, Franz-Werner Gerressen
"Diaphragm walls are known as underground structural elements commonly used for retention systems and permanent foundation walls or elements. Of course they can also be used as deep groundwater barrie
Jan 1, 2017
-
Measurement And Analysis On The Bearing Behaviour And Driving Effects Of Piles In Shanghai RegionBy Gao Dazhao
This paper presents some research results of pile foundation performance. Measurements on the bearing behaviour and driving effects of piles have been carried out during pile testing and pile driving.
Jan 1, 1991
-
Piling In Calcareous Red Bed Soils and Weak Rock Formation – Design Development for a Gas Processing FacilityBy Rick Piovesan, Pramod Rao, Nihal Bohra, Mark Wahler
"This paper discusses the approach followed for the geotechnical design of 355 mm and 457 mm diameter driven open-ended steel pipe piles used for a gas plant at a green field site in Pilbara region in
Jan 1, 2015
-
Comparison of 2D and 3D Anchor Analysis MethodologiesBy Ruth McKeown, Gilson de F. N. Gitirana, Murray Fredlund, HaiHua Lu
The current design standards for the use of anchors in slopes is based on two-dimensional (2D) limit equilibrium analyses. Anchors are considered as discrete loads and the 2D anchor, factored based on
Jan 1, 2019
-
Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 WaltonBy Joel B. Dellaria, Justin R. Lewis
"No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca
Jan 1, 2017
-
Construction-Induced Vibrations And Green Concrete: Literature Review And Case HistoryBy William M. Camp
Construction-induced earthborn vibrations have long been recognized as a potential problem with respect to the constructed environment and various vibration criteria are in use to prevent damage. A s
Jan 1, 2010
-
Acrylamide Grouting: Successfully Controlling Groundwater from Canada to South AmericaBy Daniel Magill, Jim Gentry
"Acrylamide chemical grout (C3H2NO) has been successfully used for over 50 years to control groundwater and stop infiltration. This paper will address three unique projects involving the control of gr
Jan 1, 2017
-
Drilled Displacement Piles - An Innovative Alternative to Typical Steel Driven PilesBy Patrick Granitzki, Alicia Plinio, Janitha Batagoda, Peter Howell
The City of Newark is making a comeback with new mixed-use multi-storied Residential Development projects. The majority of developers tend to use driven H-pile deep foundation systems to support their
Sep 8, 2021
-
Consultants Can Be Safe, Too – A Collaborative ApproachBy Brian FitzPatrick, Michael J. Weaver
Everyone has a role in site safety, even consultants. This paper presents a summary of how a geotechnical and environmental consulting firm, with field staff on construction and subsurface exploration
Jan 1, 2019
-
Piled Rafts: Are We Modelling Them Correctly?By Jonathan J. Dewsbury
It is argued that approximate computer based methods are only suited to modelling conventional piled rafts, for pile enhanced rafts where the interactions will be non linear three dimensional finite e
Jan 1, 2010
-
Sao Paulo’s Brooklin Station: An OPA ContenderBy Dario Libano
"The Line 5 Extension, in Sao Paulo, Brazil, is currently the most important investment in public transportation by Sao Paulo’s state government. It will connect the south part of the city to the city
Jan 1, 2014
-
Post-Katrina Emergency Interim Flood ProtectionBy Fred Fuchs
"Most deep foundation work is either unseen by the general public or viewed as an inconvenience in their daily lives. Hurricane Katrina changed that perspective for everyone in New Orleans — and many
Jan 1, 2008
-
Performance of Large-Diameter Bored Pile Socketed In Sandstone and Siltstone in ThailandBy Zaw Zaw Aye, Sereyroath Chea, Nutthapon Thasnanipan, Thayanan Boonyarak
"As there are only limited numbers of bored pile constructed in sandstone and siltstone in Thailand, load transfer and settlement behavior of a pile in these rocks are still not fully understood. Majo
Jan 1, 1900
-
High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven MethodsBy Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda
The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re
Oct 1, 2022
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KYBy Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Effective Sampling, Testing and Specification Approaches for Deep Mixing at Kitimat LNG, BCBy Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li, Donald A. Bruce
"In-situ wet grab sampling and post-installation coring of soil-cement structures are typically carried out for Quality Control (QC) and Quality Assurance (QA) of deep mixing (DM) schemes. Wet grab sa