A Study on Bearing Capacity of Waveform Micropiles Using Centrifuge TestBy Chengcan Wang, Jin-Tae Han, Young-Eun Jang
"The waveform micropile is a newly developed foundation type for increasing the bearing capacity with the created shear keys on the pile’s shaft. Analyzing the increment of resistance at the shear key
Jan 1, 2016
-
Session II - Industry Trends And Up And Coming Innovations - Reflections On Our Industry - Foundation Vs GeotechnicalBy Arturo Ressi di Cervia
From the times when men in lacustrine environments drove wooden piles into the mud to elevate their dwellings, until the beginning of the twentieth century builders reacted to the conditions found in
Jan 1, 2000
-
Interpreting Strain Measurements From Load Tests In Bored PilesBy Jack Hayes
Vibrating wire strain gages have proven to be a very reliable and effective tool for the measurement of strains associated with the loading of bored piles (drilled shafts). However, when these strains
Jan 1, 2002
-
Current Practice For Augered Cast-In-Place (ACIP) And Drilled Displacement (DD) Pile Quality ControlBy Rudolph P. Frizzi
Structures supported on ACIP and DD piles perform successfully when quality control is maintained from the initial site subsurface investigation through pile design, bidding, and construction. The fou
Jan 1, 2005
-
Foundations For The Sohio Corporate Headquarters - A Presentation At The Deep Foundations Institute Annual Meeting Cleveland, Ohio, November 1983By Clyde N. Baker
Foundations for the Sohio Corporate Headquarters in downtown Cleveland have column loads of 11,400 kips, which increase to 15,000 kips with wind loading. An extensive exploratory program was conducted
Jan 1, 1984
-
The "DSEI" Joint: A Destructible Diaphragm Wall Joint (Patented Process)By Christian Besson
This article describes the implementation of a new jointing process for use between diaphragm wall panels. This process was initially introduced on the SOCATOP work site in uburban Paris (which involv
Jan 1, 2002
-
Ground Improvement For The Deep Foundation Of A 650 M Long Quay Wall In The Port Of HamburgBy Peter Arz
In the port of Hamburg a 650 m long quay wall was completed in mid-1985. The watertight wall consists of loadbearing steel buttress piles PSP 1012 which are up to 28 m long and infill interlocking she
Jan 1, 1987
-
Reliability Analysis of a Drilled Shaft Stabilized Slope System (e386e5ff-5c43-4c35-910f-4eb413f46379)By Lin Li
A reliability based analysis method for a drilled shaft stabilized slope system is presented in this paper. In the past effort, a deterministic method using the limiting equilibrium method of slices f
Jan 1, 2017
-
Low Overhead Secant Piles Drilled From Within A ShaftBy Allen B. Stanton, Parthiv Brahmbhatt, Michael Grimm, Stanley L. Worst
Constructing a circular shaft consisting of secant piles has its own complications which make it more difficult than typical drilled shaft construction. Add to that performing under low overhead power
Oct 1, 2022
-
Behavior of Battered Piles under Lateral Loads in Sandy SoilsBy Jogeshwar P. Singh, Ahmed AlaaEldin, Mohamed Ashour
The presented methodology allows the determination of the response of laterally loaded battered long piles in sandy soils based on the soil-pile interaction. The Strain Wedge (SW) model which was orig
Jan 1, 2018
-
Probabilistic Development Of Load And Resistance Factor Design For Driven Pipe Piles In Sands: Lessons LearnedBy K. C. Foye
Use of load and resistance factor design (LRFD) of foundations is growing, from offshore applications to bridge applications and beyond. The development of load and resistance factors for design has
Jan 1, 2008
-
Developing Effective Specifications For Tremie-Concrete Placement In Drilled ShaftsBy Giuliana A. Zelada-Tumialan
Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.
Jan 1, 2009
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
A Review of Current Mexican Design Approaches for Cast-in-Place Drilled Shafts in Granular Soils under Axial LoadingBy Enrique Ibarra, Manuel J. Mendoza
"Abstract: This paper describes the current state-of-practice for the design of cast-in-place drilled shafts in granular soils under axial loading, addressing recent advances that take into account th
Jan 1, 2014
-
Production And Testing Of 600 Reinforced-Concrete Piles For The Central Bank Of IraqBy H. Meseck
The new building of the Central Bank of Iraq in Baghdad was footed in difficult underground conditions on more than 600 reinforced concrete driven piles, with cross-sectional diameters of 45 x 45 cm a
Jan 1, 1989
-
Rapid Vibratory Pile Driving Hammer For Deep FoundationBy Li Tiemin
It is one of important tasks in research of vibratory pile driving to increase speed of pile driving and depth of pile driving -- this means to increase capability of penetrating hard layer. In genera
Jan 1, 1991
-
Washington Avenue Tunnel Project: Fortifying Aging Underground InfrastructureBy Andrew R. Klaetsch, Peter W. Deming
"The Washington Avenue tunnel in Kingston, NY was completed in 1912 to convey combined storm water and sanitary sewage. Over a mile in length, the tunnel was driven almost entirely in bedrock, with th
Jan 1, 2016
-
Brickworks Marketplace Ground Improvement, AdelaideBy Andrew Middleton, Mark Wyatt
"The Brickworks Marketplace Project is a significant shopping centre development in inner north west Adelaide constructed by Badge Constructions in 2014 and 2015. The site was a former brickworks with
Jan 1, 1900
-
Case Histories of Circular Secant Pile Access Shafts for TunnelsBy Piotr Kozlowski, Stanley L. Worst, Matthew J. Niermann
Circular secant pile shafts were installed along the tunnel alignments for both the Ohio Canal Interceptor Tunnel project in Akron, Ohio and the Ohio River Tunnel project in Louisville, Kentucky. The
Jan 1, 2019
-
Test Pile Program Carrier Pier And South Wharf Naval Station Puget Sound Everett, WashingtonBy David G. Winter
The first test pile for the carrier pier and south wharf at NAVSTA Puget Sound was driven on December 27, 1989, and the final pile was tested on February 26, 1990. Implementation and modification of t
Jan 1, 1990