Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Use Of Controlled Modulus Columns In Retail & Industrial Development Projects

    By Frederic Masse

    With widespread acceptance in the market place, many engineers are choosing ground improvement techniques to provide suitable foundation subgrade at sites that would have traditionally required deep f

    Jan 1, 2011

  • DFI
    Comparison of the Pre-Construction and Production QC Test Results for the Sela-22 Elliptical Jet Grouting Project (New Orleans, LA)

    By Filippo Maria Leoni, Alessandro Bertero, Gianluca Pianezze

    "As part of the Southeast Louisiana (SELA) drainage program, designed by the U.S. Army Corps of Engineers (USACE) to reduce flood damages in the City of New Orleans and surrounding parishes through th

    Jan 1, 2016

  • DFI
    Minipiles In Soft Marine Deposits Rescue Sinking Warehouse

    By Bruno Gemmi

    A new warehouse built with prefabricated components over an area underlined by soft marine soil deposits started showing differential settlements well before its completion. Its 103 spread footings c

    Jan 1, 2011

  • DFI
    Hybrid Shoring System for a Deep Temporary Excavation

    By Nadir Ansari, Brian W. Wilson, Marina S. W. Li

    "A hybrid Deep Mixing (DM) shoring system was recently constructed for a high-rise development in downtown Vancouver, British Columbia, Canada for the temporary support of a five-level basement excava

    Jan 1, 2017

  • DFI
    Evaluating Geotechnical Resiliency Solutions in New York City

    By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith

    When selecting a solution for improving resiliency at facilities, such as airports, utility and transit sites, there are many options to protect structures and equipment against potential flooding. Ea

    Jan 1, 2018

  • DFI
    Deep Foundations for Top-Down Construction of High-Rise Project

    By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin

    A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const

    Jan 1, 2019

  • DFI
    Friction Loss in Tieback Anchors used for Landslide Stabilization

    By John P. Turner, Benjamin J. Turner

    "Tieback anchors are now used routinely for landslide stabilization in the USA and abroad. It is generally understood by design engineers that friction loss over the unbonded length of a tieback ancho

    Jan 1, 2017

  • DFI
    Incorporating Site Variability into LRFD Design of Pile Foundations

    By Murad Y. Abu-Farsakh, Md Habibur Rahman

    The properties of all natural soil deposits are highly variable, and they are rarely homogeneous. Cone penetration tests (CPT) were used to assess the site variability, which was then incorporated in

    Sep 8, 2021

  • DFI
    Drilled Pier Foundations for Mercedes-Benz Stadium

    By Jean Wehbe, Daniel C. Brahana

    "The new Mercedes-Benz Stadium (MBS), home of the Atlanta Falcons, is part of a new era of stadium construction in the U.S. These new-age stadiums are larger and have more amenities than their predece

    Jan 1, 2016

  • DFI
    Insight to Foundation Construction of Extradosed - 3rd Narmada Bridge over River Narmada, Bharuch, Gujarat

    By Ekhlaq A. Khan

    "The new third Bridge over Narmada River at Bharuch which was recently completed is characterized by some aesthetically appealing elevations of the pylon and large size of the deck. This paper gives a

    Jan 1, 2017

  • DFI
    A Review of Guidelines for Dewatering Design within the Abu Dhabi Municipality

    By M. Melih Demirkan, Jared Deible, Michael Rosenmeier, Mazen Elias Adib, Juan J. Gutierrez, Raghav Ramanathan

    Dewatering and groundwater control is required frequently for construction projects and needs to be accounted for and dealt with care during design and construction to complete the project successfull

    Jan 1, 2016

  • DFI
    Value Engineering Through Systematic Site Investigation and Design Optimization – A Case Study

    By Lu Yitan, Frances Badelow, Manish Tiwari

    "Large ‘design and construct’ projects often present significant geotechnical risks. However, these also present significant opportunities for value engineering in design. These opportunities can be r

    Jan 1, 1900

  • DFI
    Case History - Augered Cast-In-Place Piling Installed Into Weathered Sandstone

    By Edwin W. Meyer

    The augered cast-in-place piling technique was used to install deep foundations 20 feet into weathered sandstone. The project involved the upgrading of the Air Quality Control System (AQCS) for a 560

    Jan 1, 2006

  • DFI
    Micropile Foundations For Support Of New Bridge Structures Over Abandoned Mine

    By Timothy J. Myers

    Expansion and the economic growth in the southwestern region of Missouri necessitated the expansion of State Route 249 and the construction of a new interchange to provide service to the Joplin, Misso

    Jan 1, 2009

  • DFI
    Advantages of Pressed-In Sheet Piles for New Orleans’ Hurricane and Storm Damage Risk Reduction System Flood Control Project

    By Ian Vaz, Takefumi Takuma

    "The New Orleans area has been repeatedly flooded by major storms and hurricanes since its French colonial era. After severe flooding in May 1995, the U.S. Congress authorized a massive flood protecti

    Jan 1, 2017

  • DFI
    Pile Set-Up to Optimize High-Rise Bridge Design

    By Charles Winter

    The Ohio Department of Transpor- tation's (ODOT's) $228 million 1-480 Valley View Bridge project was needed to keep traffic flowing on one of the state's busiest freeway segments. Deterioration from a

    May 1, 2022

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Hybrid Excavation Support System for the Union Station Revitalization Project

    By Charles G. Crans, Naresh Gurpersaud

    "Toronto’s Union Station, a National Historic Site occupying an entire city block, is the busiest commuter rail transportation hub in Canada. An extensive project is being undertaken to revitalize Uni

    Jan 1, 2017

  • DFI
    Dynamic Pile Testing for the Five Mates Bridge

    By Jonathan G. Cannon

    "This paper will describe dynamic pile testing conducted during installation of driven octagonal precast prestressed concrete piles used as the foundation for this bridge. The piles were long and henc

    Jan 1, 1900

  • DFI
    Dynamic Pile Testing - The Caltrans Results - Dynamic Pile Testing - Who Needs It?

    By G. G. Goble

    Dynamic pile testing is now over 20 years old as a routinely applied tool for evaluating driven pile installation. The first test on a cast-in-place pile was performed more that 15 years ago. The rese

    Jan 1, 1993