Embodied Carbon Assessment For A Multi-Phased Development Pile Testing StrategyBy Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Statnamic Load Testing Of High Capacity Marine Foundations (62a0500e-14c7-4ace-9608-4578694a5392)By Mike Muchard
STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o
Jan 1, 2013
-
Ground Improvement By Controlled Modulus Columns - A San Pedro Case StudyBy Sunil S. Basarkar, Vinothkumar S
Ground Improvement Techniques serves to improve various engineering properties for supporting various foundations. These may be undertaken either by conventional or advanced methods. The Controlled Mo
Sep 1, 2022
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Deep Excavation with Well Point Dewatering in Soft SoilBy Mihir B. Roy
"Coal transported by rail for Thermal Power Plant in Haldia, West Bengal, India, was to be received and stored in Coal Complex comprising of Wagon Tippler, Track Hopper, Junction Houses and network of
Jan 1, 2015
-
High Capacity And Fully Removable Soil AnchorsBy Anthony D. Barley
Over 60,000 multiple anchors have been used internationally since their introduction in the early 1990s, including 1000 in the United States. The multiple anchor system comprises a "multiple" of "unit
Jan 1, 2002
-
Measurements of CDSM Strengths and Seepage Data Following Seismic Upgrades of San Pablo DamBy Atta B. Yiadom, A. David Miller, Robert C. Kirby, Sean M. Todaro
"San Pablo Dam is a 170-foot (52-meter)-high earthfill embankment, located approximately 10 miles (16 kilometers) north of downtown Oakland, California, that impounds a 38,600 acre-feet (47.6 million
Jan 1, 2015
-
Vsm And Ofd® Technology: Mechanized Solutions For Deep On- And Offshore FoundationsBy Nils Schneider, Marc Peters, Stefan Frey, Andrea Fluck
Due to the worldwide population growth, the development of sustainable infrastructure and the exploration of renewable energies plays a key role to handle the rising megacity trends and to limit carbo
Nov 1, 2022
-
Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - SynopsisBy N. V. Nayak
Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were
Jan 1, 2000
-
Dynamic and Static Load Testing: A Cost Savings ApproachBy Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez
A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations
Jan 1, 2019
-
Deep Bored Piling in Soft Soil and High Lateral LoadsBy W. Sondermann
"AbstractThe construction of a distribution centre of minerals for a global mining and resources cooperation demanded the control of deformations and displacement of the stack reclaimer facilities on
Jan 1, 2014
-
Dynamic Load Testing of 2 Metre Steel Tubular Piles Driven into Foliated Phyllite BedrockBy Bosco Poon, Kim Chan, Luis Raúl Castañeda, Geoff McKay
"Driven steel tubular piles of up to 2 m diameter have been used to support abutments and piers of a bridge over Nambucca River and floodplain. The bridge was designed by Arup-Aurecon Design Joint Ven
Jan 1, 1900
-
Pile Lateral Behaviour under Full Scale Lateral Load Tests in Thick Compacted Marine Carbonate Sand Fill of an Artifical IslandBy Challa Venkata Rami Reddy, Anindya Roy, G. R. Konni
This paper presents the results of pile lateral capacities obtained from both conventional design and fullscale pile lateral load tests. Conventional design using P-Y curve analysis is very commonly b
Sep 8, 2021
-
Innovation In Spliced Prestressed Piles: Testing And Use Of The Emeca Pile SpliceBy John C. Ryan
The Emeca Pile Splice, an innovative mechanical prestressed concrete pile splice, is the first robotically welded splice to be fabricated in the United States. An analytical and experimental study wa
Jan 1, 2010
-
Preliminary Assessment of Reliability and Sampling Requirements for Deep Mixing Method (DMM) Foundations for LNG Processing Facility and Storage Tank (52fd79c3-58e2-4970-9b21-5f8e12930105)By Paul Summers, Kevin Richardson, Willem (Billy) Villet, Paul J. Sabatini, Attasit Korchaiyapruk, Edward C. Clukey
"A deep mixing method (DMM) foundation was selected by the Project Team for a very large LNG facility in West Africa. As described in a companion paper, this foundation consists of a large number of c
Jan 1, 2017
-
Holding Back The Watchung MountainsBy Ryan C. Linthicum
A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains
Jan 1, 2003
-
Nailed It! The Great Wall of the Chinese EmbassyBy Fred Tarquinio, Giovanni Bonita, Lars Wagner
"A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large
Jan 1, 2007
-
Marine Prefabricated Vertical Drains for the Craney Island Eastward Expansion (c2c7d75f-a035-4e5c-9df5-e768ce1a9e85)By Mohamed Mekkawy, William W. Wheaton, Ira Brotman
"The Virginia Port Authority and the U.S. Army Corps of Engineers are partnering to construct the Craney Island Eastward Expansion (CIEE) to meet the dual purpose of extending the life of Craney Islan
Jan 1, 2017
-
Extrapolation of Unit Side Resistance in Drilled Shaft Foundations Based on Bi-Directional Load Test DataBy Ramin Motamed, Joseph A. W. Toth
Evaluation of the capacity of large-diameter drilled shafts using current load test methods present challenges when considering the magnitude of loads required to fully mobilize their capacities. Ofte
Jan 1, 2018