Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Cyclic Axial Loading Of Offshore Piles - An Issue Of Concern?

    By Paul Doherty

    Expansion of the global piling industry has been coupled with significant research efforts investigating the mechanisms controlling pile capacity. Static pile design has transitioned from total stress

    Jan 1, 2009

  • DFI
    Dynamic Load Testing Of Non-Uniform Piles

    By Thai Nguyen Ph. D

    Dynamic Load Test (DLT) on driven piles has been performed routinely all over the world. In several recent projects, even 100% testing has become a norm where every single pile is dynamically load tes

    Oct 1, 2022

  • DFI
    Real Time Validation of Driven Cast In-Situ Piles

    By Derek Egan

    "Abstract Construction clients want their foundation solutions to be right first time, every time; but it is often the geotechnical contractor who carries the most risk in achieving this. Robust valid

    Jan 1, 2014

  • DFI
    Compensation Grouting Under Real-Time Monitoring, Rio Piedras Project, San Juan, Puerto Rico - Deep Foundations Institute 25th Annual Meeting And 8th International Conference New York USA, October 5-7, 2000

    By Jean-Pierre Hamelin

    Ground movements induced by underground excavation are always of critical concern, particularly in urban areas. Compensation grouting now appears as a safe means to control these movements. The paper

    Jan 1, 2000

  • DFI
    Static And High Strain Dynamic Test Co-Relation Studies On Cast-In-Situ Concrete Bored Piles - Synopsis

    By N. V. Nayak

    Maharashtra State Road Development Corporation Ltd., has initiated a scheme for construction of 55 flyovers in Mumbai in India. To ensure speedier completion of projects several new technologies were

    Jan 1, 2000

  • DFI
    Quality Control For Installation Of Augered Cast-In-Place Piles

    By Francis J. Arland

    The installation of augered cast-in-place (ACIP) piles requires careful quality control to assure a successful pile installation. Unlike steel, pre-stressed concrete or other types of driven piles, wh

    Jan 1, 1997

  • DFI
    Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York City

    By Willie M. NeSmith

    Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp

    Jan 1, 2004

  • DFI
    RResearch On Dynamic Inspection Of Prototype Models Of Reinforced Concrete Piles

    By Xuhui

    Pile foundations are underground projects which are carried out under complicated site conditions, so it is difficult to summarize their characteristic patterns from the everchanging practical pile fo

    Jan 1, 1991

  • DFI
    Are Specifications for Deep Foundation Concrete Up-To-Date?

    By Karsten Beckhaus

    "Abstract Tremie concrete for special geotechnical works needs special properties, especially during the casting process. Today’s execution standards for bored piles and diaphragm walls, EN 1536 and E

    Jan 1, 2014

  • DFI
    Consideration on Liquefaction Resistance of Ground Improved by the Sand Compaction Pile Method

    By Kazunori Matsushita, Masaru Sakakibara, Kenji Harada, Naotoshi Shinkawa, Mitsuo Nozu

    The Sand Compaction Pile (SCP) method has been widely used as a typical countermeasure against liquefaction in Japan, and its effectiveness has been confirmed in many case histories of damages caused

    Jan 1, 2017

  • DFI
    Influence Of Freeze–Thaw Cycles On Strength And Heavy Mental Leaching Performance Of Petroleum Drilling Mud Stabilized By Waste

    By Tian Miaomiao, Cheng Yin, Shen Jun, Yu Hao, Li Yafei

    Vast amounts of waste drilling mud containing heavy metals is produced during oil drilling process, which causes great pollution to the environment. Therefore, it needs to be treated until it is harml

    Nov 1, 2022

  • DFI
    Experimental And Numerical Assessment Of Osterberg Load Tests On Large Bored Piles In Sand

    By Roberto Nova

    The selection of the Osterberg Cell (O-Cell) technology as the standard testing method for deep foundations of the Railways Po Viaduct in Northern Italy offered a relevant number of field measures on

    Jan 1, 2008

  • DFI
    Upgrading of the Equipment on CDM Vessels to Accommodate Water Depth and Environmental Considerations

    By Takashi Enomoto

    "The cement deep mixing (CDM) method has a wide range of applications, both on land and at sea. This paper describes the features of the equipment on CDM vessels engaged in maritime construction in Ja

    Jan 1, 2015

  • DFI
    Vibrations Caused by Pile Driving (bb4f9935-841f-4be3-bb1b-f95875d26e25)

    By K. Rainer Massarsch

    "Part 1 of 2 By K. Rainer Massarsch, Geo Engineering AB, Stockholm, SwedenINTRODUCTIONConstruction activities, such as driving of piles and sheet piles, soil compaction or excavation generate noise an

    Jan 1, 2004

  • DFI
    Vibro Stone Columns With Preloading – An Effective Foundation Solution For Large Storage Structures

    By Ramanathan C, Prasad P. V. S. R

    The most critical challenge for any large size storage structures to be constructed on soft compressible soils is bearing capacity and consolidation settlements. Consolidation is the time dependent ph

    Sep 1, 2022

  • DFI
    Corrosion Protection Of Micropiles

    By Racquel Nottingham, Marc Mastrantuono

    Micropiles often provide a favourable solution for many deep foundation problems especially when significant site constraints such as confined construction sites or vibration limitations have been ide

    Oct 1, 2022

  • DFI
    Low Strain Integrity Testing Of Deep Foundations ? Introduction

    By Jay A. Berger

    Nondestructive testing of deep foundations for integrity problems made great strides in the late 1980's. Inexpensive portable computers have allowed the immediate and rapid processing of field me

    Jan 1, 1990

  • DFI
    Piled Raft Design For High Rise Buildings In East London, UK

    By D. P. Nicholson

    The current phase of office development at Canary Wharf in the London Docklands includes twelve multi-storey buildings varying from eighteen to forty stories in height. The area of Canary Wharf South

    Jan 1, 2002

  • DFI
    Resonance Pile Driving with Zero Ground Vibration

    By Mark Johnson, Mathew Janes

    "The Resonator RD 260 Resonant Pile Driver delivers ground disturbance free, high production pile driving. The Resonator has recently been used on numerous production pile driving sites in the Netherl

    Jan 1, 1900

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019