Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Supporting Quarry Operations with Blasting TechnologyBy Tacio Ferreira
How state-of-the-art software, data analysis and communication applied to drilling and blasting techniques have have allowed quarries in the Midwest of the United States to improve results downstream
Feb 1, 2020
-
Effect of Presplit Perimeter Control in an Underground Cut and Fill MineBy David Porter, Nathan Rouse
The implementation of presplit perimeter control in underground mining as a method to decrease dilution yields positive benefits throughout the current and future mining cycles. A case study to unders
Feb 6, 2023
-
Close-in Pipeline Trench Blasting – Why PipeBlast Does Not WorkBy N. Skopak, C. Aimone-Martin, J. Redyke, B. O. Meins
PipeBlast is a spreadsheet-based calculator based on research conducted by Southwest Research Institute (SwRI), used by the pipeline industry to determine if proposed blasting planned near existing pi
Jan 1, 2024
-
Modeling An Artificial Screen For Reducing Seismic VibrationBy Lazar Kricak, Vladislav Kecojevic, Dragan Bogunovic
In spite of many advantages explosives have, their usage may cause environmental problem such as seismic vibration. One of the solutions to this particular problem may be application of an artificial
Jan 1, 2007
-
Examination and Comparison of Shock Wave Characteristics in Open-Air Arena Test vs. Shock Tunnel ConfinementBy D J. McLane, J T. Rathbun, B T. Lusk
The dynamics of explosive detonations are understood, however recreating a real-world, full scale scenario is costly. The use of a shock-tunnel allows testing to be done on a smaller scale, with the s
Jan 1, 2013
-
Underground Airblast Monitoring for Blast Performance Diagnosis and Detailed Attenuation ModellingBy Jon Hurt, Brent Meins, David Vardiman
"Two test blasts were conducted at the Sanford Underground Research Facility to establish optimum blast designs and to limit blast effects on existing research rooms and equipment in preparation for t
Jan 1, 2017
-
Prediction of blast induced ground vibration and its associated dominating frequency using a comprehensive support vector machine modelBy T. G. Sitharam, P. B. Choudhury
Prediction of ground vibration (peak particle velocity, PPV) and frequency is an important task in geoscience. Till date, many empirical equations are derived from conducting trial blasts in the mines
Jan 1, 2010
-
Case Studies Using the Multiple Blasthole Fragmentation (MBF) Model at Open Pit Mines in CanadaBy Scott King, Norm Patterson, Ruilin Yang
The multiple blasthole fragmentation (MBF) model developed by Orica models the contributions from multiple blastholes to fragmentation at any given point in the rock and simulates a production blast w
Jan 1, 2018
-
10th International Symposium on Rock Fragmentation by Blasting - Fragblast 10 (FB 10) 24-29 November 2012, New Delhi IndiaBy Agne Rustan
The goal of this paper is to describe Fragblast 10 for those who did not have the opportunity to attend the Symposium and also give some examples of new research findings used in practise in some coun
Jan 1, 2013
-
Hybrid Specifications for Underwater Blasting Specifications on the Soo St. Marie Channel DeepeningBy Timothy Smith, Matthew Ryan, Dr. Anthony Konya
Hybrid specifications are a relatively new style of specifications specifically for the drilling and blasting industry that has seen widespread use over the last decade with the U.S. Army Corp of Engi
Feb 1, 2020
-
Microseconds Matter in MonitoringBy Gregory B. Poole
Data collected with 16K sampling at a variety of blasting sites (construction, quarry, trench, mine) and monitoring locations was analyzed to effectively show the 16 different 1K readings all based on
Feb 1, 2020
-
AN Railcar Derailed Debris Collection – Data Analysis UpdateBy Brandon Fryman, Josh Hoffman, Rhys Baker
A post-detonation debris collection project was led in conjunction with a large ammonium nitrate (AN) railcar detonation conducted by the Department of Homeland Security-Transportation Security Admini
Feb 1, 2020
-
Subdrill – The Underutilised Blasting ParameterBy Stephen Mansfield
In metalliferous mining operations, subdrill is that portion of the blast hole that is drilled below the target grade elevation, and in most cases loaded with explosives. Its primary aim is to enable
Feb 1, 2020
-
Application, monitoring, and control of vibrations induced by underground rock blasting using a near-field methodologyBy A. Gontijo, A. Matos, P. Lincoln, L. Fonsecail
This paper investigates how to manage and model the vibrations caused by rock blasting in a Brazilian underground mine. Considering the frequent detonations and the previous lack of effective vibratio
Jan 1, 2024
-
Sustainable productivity in the exploitation processes of a mining site adjacent to communitiesBy J. Aravena, S. Gajardo, M. Ayala, P. Salinas
Both, Teck Carmen de Andacollo (Teck CDA) and Orica, work hard in the implementation of new technologies available in the explosives industry and drilling and blasting techniques, with the objective o
Jan 1, 2024
-
Blast Vibration Modelling - An Instrument to Optimise Quarry ProductionBy Drew Martin
In March 2010 the Boral Linwood Quarry, Adelaide South Australia, implemented the blasting contractors Monte Carlo Blast Vibration Model as part of their blast design process. The Linwood Quarry was d
Jan 1, 2012
-
The Statistical Analysis of Site-Specific Blasting Data Using Prediction Intervals and Tolerance IntervalsBy Perry Sisk
In order to protect nearby structures during a blasting project, a peak particle velocity limit is often stipulated by a government agency or the owner of a particular structure. At the start of a bla
Jan 1, 2013
-
Fines Reduction and Its Impact on the Economics of Aggregate OperationsBy J. Eloranta
"Previous work indicated that the annual per-capita consumption of raw aggregate material averages about 10 tons; half of which is produced by blasting. Given a population of approximately 320 million
Jan 1, 2017
-
Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness RockBy Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores
One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure
Feb 6, 2023
-
Tunneling in Thinly Foliated Rockmass ConditionsBy H. S. Venkatesh, G. Gopinath, R. Balachander, G. C. Naveen
Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne
Feb 1, 2020