Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Roof and pillar failure associated with weak floor at a limestone mine - SME Transactions 2015

    By J. L. Ellenberger, G. S. Esterhuizen, T. Miller, M. M. Murphy

    A limestone mine in Ohio has had roof instability problems that have led to massive roof falls extending to the surface. This paper describes a collaborative study of these events undertaken by the Na

    Jan 1, 2015

  • SME
    Metal's Bioremediation

    By Corale L. Brierley

    Bacteria, algae and fungi react to heavy metals in their environment by immobilizing, mobilizing and/or transforming metals. Microorganisms carry out these changes by (1) precipitating metals outside

    Jan 1, 1995

  • SME
    The occurrence and concentration of rare earth elements in acid mine drainage and treatment byproducts. Part 2

    By Paul F. Ziemkiewicz, Aaron Noble, Christopher R. Vass

    Many modern industries rely on rare earth elements (REEs) to produce products that are essential to both civil and defense applications. In a prior study (Vass et al., 2019), we showed that REE grades

  • SME
    Mitchell Point Tunnel, Oregon—Design and Construction - NAT2024

    By Taeyong Lee, Cole Bales, Matt Fowler, John Horne

    Mitchell Point Tunnel near Hood River, Oregon is one of the more unique segments of the Historic Columbia River Highway and State Trail being constructed through the Columbia River Gorge. This 650-foo

    Jun 23, 2024

  • SME
    Evaluation of the Rock Burst Intensity of a Cloud Model Based on the CRITIC Method and the Order Relation Analysis Method - Mining, Metallurgy & Exploration (2023)

    By Yongheng Jiang, Wentong Wang, Haoming Luo, Chuanju Liu, Qianjun Zhang, Sha Guo

    Rock burst has always been a major problem in deep underground engineering with high stress, and rock burst strength evaluation has become an important research topic. To effectively predict the rock

    Sep 1, 2023

  • SME
    Economics Of Geologic Exploration

    By D. M. Davidson

    The economics of geologic exploration have changed materially in the past decade primarily due to the change in three basic factors, namely, increased wages and salaries, increased cost of materials,

    Jan 1, 1958

  • SME
    Discussion of “Study on correlation of quantified coal rank with self-heating temperature”

    By J. Grubb

    "The undertakings described in the paper titled “Study on correlation of quantified coal rank with self-heating temperature” by Wang and Luo in the November 2015 issue of Mining Engineering (Wang and

    Jun 1, 2016

  • SME
    Mystery Of The Missing Grade And Recovery

    By S. Ripke

    Between 2002 and 2004, the performance of a six million ton per year iron ore beneficiation plant dropped significantly. In a classic case of “who done it,” was it the mine, the concentrator, an ore c

    Jan 1, 2007

  • SME
    Risk Management and Long-Term Production Schedule Optimization at the Labmag Iron Ore Deposit in Labrador, Canada

    "A long-term mine production schedule optimization based on stochastic integer programming is presented that manages the risk due to geological variability and uncertainty while jointly considering mi

    Jan 10, 2017

  • SME
    Recent Environmental Regulations And Their Effect On The Minerals Industry

    By F. M. Benavides

    This paper presents recent developments in federal environmental regulations, which in the view of the author, affect mining and the mineral processing industries. This is a summary of activities by t

    Jan 1, 1991

  • SME
    Environmental Planning For A Coal Terminal In A Sensitive Offshore Environment ? Introduction

    By David Atkin

    This paper presents methods and results of environmental planning conducted for a proposed coal and iron ore transshipment terminal which would be located on reclaimed land west of Lisbon, Portugal. O

    Jan 1, 1983

  • SME
    Alteration Mineralogy -A Powerful Tool For Precious Metals Exploration And Ore Control

    Precious metals exploration is increasingly involved with concealed, deeper-seated gold-silver deposits which exhibit considerably more challenges to the geologist than near-surface, oxidized ores. Th

    Jan 1, 1993

  • SME
    Mining Asset Development for Virtual Reality

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • SME
    Project Handoff from Exploration to Development: How to Avoid Fumbling the Ball

    By Gregory A. Hahn

    Explorationists and engineers rarely speak the same language. Explorationists are not cognizant of the information that engineers require to make the appropriate choices and decisions. Engineers can-

    Jan 1, 2001

  • SME
    Multi Mineral Cutoff Grade Optimization With Option To Stockpile

    The Cutoff grade optimization is very critical to the open pit production scheduling. In case of single mineral deposits, algorithms have been developed for determining cutoff grade policy that maximi

    Jan 1, 1997

  • SME
    Optimization Of A Computer Model Of A Grinding Process Using Genetic Algorithms

    By Charles L. Karr

    Grinding is a necessary component in the processing of a number of minerals, and improvements in this area could provide substantial cost savings for the minerals industry. Optimizing the process of g

    Jan 1, 1993

  • SME
    Evaluation Of Fluorspar Deposits ? Introduction

    By W. N. McAnulty

    Because so many interrelated technical, economic, legal and political factors are involved in evaluation of commercial mineral deposits, it is common practice today to assign such work to a team of sp

    Jan 1, 1970

  • SME
    World’s Largest Tunnel Gates and Reservoir Connection go Online as Part of Chicago’s Tunnel and Reservoir Plan

    By Faruk Oksuz, Dave Schiemann, Miguel Sanchez, Patrick Jensen

    "The McCook Main Tunnel connects Chicago’s Tunnel and Reservoir Plan (TARP) Mainstream Tunnel to the McCook Reservoir. The tunnel system consists of a 10 m (33 ft) finished diameter and 490-m (1,600-f

    Mar 1, 2019

  • SME
    Well Integrity Testing System For In Situ Leach Mining Wells (78567e74-cc36-4600-975f-4490fa206b3d)

    By J. K. Ahlness

    The Bureau of Mines investigated technologies for determining the integrity of in situ leach mining wells. A self-contained trailer-mounted well integrity testing system (WITS) was designed and built

    Jan 1, 1986

  • SME
    Linear Programming Optimization Of Asphalt Mix Design - Preprint 09-032

    By K. Awuah-Offei

    The objective of asphalt mix design is to produce a mix with optimal performance using available aggregate stockpiles. Often, this process does not take into consideration aggregate plant stockpile in

    Jan 1, 2009