Search Documents

Sort by

  • SME
    Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021

    By D. Nebbia, R. Aliberti, F. Solesin

    The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren

    Jun 13, 2021

  • AUSIMM
    Lesson Learned From the Start-Up and Operation of the World's Newest and Largest ISL Uranium Mine

    The Beverley uranium mine û now in production in the remote north of South Australia at1000 tonnes per annum û was established to meet a projected, but little-recognised shortfallin primary supply of

    Jan 1, 2002

  • NIOSH
    Lessons From The Granite Mountain Shaft Fire, Butte. - Introduction.

    By Daniel Harrington

    On the night of June 8, 1917, the flame of a carbide lamp accidentally set fire to the uncovered and frayed insulation of an armored power cable near the 2,400-foot level of the North Butte Mining Co.

    Jan 1, 1922

  • SME
    Lessons Learned After Completion of the Michigan I75 Design-Build Resiliency-Improvement Tunnel - NAT2024

    By David Mast, Irwan Halim, Brian Hagan, Kaveh Talebi, Jason Edberg, Amanda Foote

    On June 14, 2023 Jay Dee Contractors’ Tunnel Boring Machine (TBM) “Phoenix” holed through and completed mining the second drive of the I-75 Segment 3 Storage and Drainage Tunnel. Completion of the tun

    Jun 23, 2024

  • CIM
    Lessons Learned and Best Practices ? Ontario?s Mining Sector Compressed Air System Energy Efficiency Pilot Project

    By Ivor da Cunha

    Ontario Mining Association (OMA) represents 57 members that are engaged in exploring, producing & processing mineral resources in an environmentally responsible manner. Conservation Bureau at the Onta

    May 1, 2007

  • SME
    Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021

    By Todd Kilduff, Paul Wilkinson

    Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project

    Jun 13, 2021

  • DFI
    Lessons Learned From Construction Of A Tire Plant In Karst, Ns2 Tires, White, Ga

    By Robert L. Goehring, Fred Munene

    This case history for three major additions to a tire manufacturing plant in north Georgia discusses the impact of highly variable Karst (sinkhole) geology on both foundation design and construction.

  • SME
    Lessons Learned From EPB and Slurry Tunneling in Glacially Deposited Soils in Seattle, Washington, USA

    By Shinichi Konda, Gary Nishimura

    "Thousands of years ago large glaciers carved much of the landscape in Puget Sound, depositing abrasive and granular soils including cobbles and boulders along with layers of clay and sand. Tunneling

    Jan 1, 2016

  • CIM
    Lessons Learned From Expanding Al-Agoza Hospital in Egypt

    By Nehad Elsafty

    It is always necessary to expand existing buildings, so that they could meet the growing societal needs. Compared with demolishing them and then constructing new ones, the expansion of existing buildi

    Aug 1, 2013

  • AUSIMM
    Lessons Learned from Geometallurgical Investigations Carried Out on a Nickel Sulfide Flotation Plant

    By B Newcombe

    From many years practical industrial experience the author has drawn together a list of the key points to consider when embarking on a large-scale geometallurgical project. Fundamental aspects which m

    Sep 5, 2011

  • SME
    Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024

    By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada

    The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai

    Jun 23, 2024

  • SME
    Lessons Learned From Near-Miss Events: Use of the Critical Decision Method to Identify Strategies to Improve Haul Truck Safety in Mining - SME Annual Meeting 2024

    By Jonathan K. Hrica, CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    Accidents involving powered haulage and mobile equipment such as haul trucks often account for the greatest number of fatalities in the mining industry each year. Despite previous analyses that have i

    Feb 1, 2024

  • CIM
    Lessons Learned from the East Malartic Fire

    By T. V. Nethery

    Introduction A brief account of the East Malartic fire is essential if this paper is to serve the purpose implied by its title. The fire originated in the timbers of No. 4 shaft at the 10th, or

    Jan 1, 1950

  • SME
    Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023

    By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski

    High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode

    Jun 13, 2023

  • AUSIMM
    Lessons learnt in geotechnical investigation and stability analysis for upstream tailings storage facility raise design

    By C Armstrong, B Wentzinger

    Upstream embankment raises often represent the lowest cost option for increasing the capacity of tailings storage facilities (TSF), but also pose the highest stability risk due to constructing on top

    Jul 23, 2018

  • SME
    Let's Be Practical Again A Focus On Midwest Mining

    By Dale D. Teeters

    Today, I would like to talk about ways to maximize the efficiency of surface coal operations. I doubt I will present any startling new ideas, but my comments may, hopefully, stimulate some conversatio

    Jan 1, 1981

  • SME-ICGCM
    Letter Of Nomination - 26th International Conference on Ground Control in Mining

    By Christopher Mark

    Dr. Christopher Mark serves as Team Leader of the Rock Mechanics Section in the Rock Safety Engineering Branch of the NIOSH - Pittsburgh Research Laboratory. In this position he leads a multi-discipl

    Jan 1, 2007

  • AIME
    Letters To The Editor - Principal Cobalt Source

    My bets are on you, every time! But who is right? In the "cobalt issue" of our favorite magazine, January 1951, you stated: "By far the best immediate United States prospect for, large amounts of coba

    Jan 1, 1952

  • AIME
    Letters To The Editor - Shortage Of Engineers Can Be Cured

    The engineering personnel shortage, present and impending, so well brought out in the article in Mining Engineering in the August, 1951 number, both in the editorial lead and the article by William B.

    Jan 1, 1952

  • DFI
    Level Crossing Removal Project – Package 1

    By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong

    "The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin

    Jan 1, 1900