Search Documents

  • AUSIMM
    Reoxidation of Al-killed ultra-low C steel by FetO in CaO-Al2O3-MgOsat.- FetO slag representing RH slag by experiment and kinetic modelling

    By Y-B Kang, W-Y Cha, Y-M Cho

    Molten slag used in the secondary refining process (RH process) for the production of Ultra-Low C (ULC) steel is typically composed of CaO-Al2O3-MgOsat.-FetO with minor constituents. FetO in the RH sl

    Jun 19, 2024

  • SME
    Repair And Reconstruction Of Interceptor Sewers Newtown Creek Project

    By Timothy P. Smirnoff, Arthur P. Chase, Herman J. Smith

    INTRODUCTION The Newtown Creek Pollution Control Project (P.W. 53) is a major system of facilities designed to collect wastewater from large areas of the Boroughs of Manhattan, Brooklyn and Queens,

    Jan 1, 1979

  • DFI
    Repair Methods For Corroded Steel Piles

    By C. Vipulanandan

    With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999

  • CIM
    Repair Process Development for Blisk Applications in Aero Engines

    By L. Zhu, S. Kaierle, M. Dahmen, C. Zimmermann, T. Haubold, I. Kelbassa, C. Mattern

    Application of integrally bladed disks (blisks) is of increasing interest in compressors of aero engines. Blisks are preferred due to their potential for size and weight reduction, for increased perfo

    Jan 1, 2006

  • CIM
    Repair Technologies: Past and Present

    By Raj Thamburaj

    "Over the last few decades, the emphasis on affordability and reduced cost of ownership has necessitated the development of innovative processes to carry out repairs in aero engine components. Convent

    Jan 1, 2010

  • SME
    Repair the Fan, Save Money

    By Thomas J. Kuli, Tim Rape

    When a fan or blower breaks down or becomes worn, customers have two choices. They can replace it or they can have it repaired. In the past, replacement was the preferred option, especially when the

    Jan 1, 2005

  • SAIMM
    Repair works and tests at the Rossio tunnel, Portugal

    By F. Pinto, J. V. Lemos, A. Sousa, L. Ribeiro e Sousa

    The Rossio railway tunnel was built in 1890 crossing several formations involving limestones, basalts and also sandy and clayey formations. Due to the fact that it is an old underground structure reha

    Jan 1, 2003

  • SME
    Repairing Conveyor Belting Without Vulcanising

    By A. J. Friedrich

    Conveyor belts are designed to go unnoticed. When they work well, they attract little attention. When they are not doing the job right, it is noticeable, and they need to be fixed immediately. Vulcan

    Jan 1, 2000

  • AIME
    Repairing Party Collapsed Cylindrical Furnaces

    By John P. Cosgro

    THE increasing use of internal furnace-boilers for mining power-plants (doubtless due to the facility with which they may be installed by reason of their portability; the fact that they require no mas

    Mar 1, 1905

  • AIME
    Repairing The Upper Part of a Furnace Lining Without Blowing Out

    By Frank Firmstone

    WE found it necessary, in December, 1874, to repair the upper part of the lining in No. 5 furnace at Glendon, and, as we succeeded in doing it with comparatively little trouble, a description of the p

    Jan 1, 1876

  • SME
    Repairs and Modifications to the Providence Water 2.3 m ID Scituate Aqueduct and Tunnel

    By David Belknap, Clay Haynes, David Egger

    Rehabilitation challenges were met nearly two months ahead of contract schedule for the Design-Build, Fast Track Scituate Aqueduct & Tunnel project in Cranston, Rhode Island. The aqueduct and tunnel w

    Jan 1, 2005

  • CIM
    Repairs of Brunswick Mining, Smelting and Fertilizer concentrate and bulk handling system

    By D. T. Aikens, R. Gaudreault

    "This paper summarizes structural repairs carried out on a marine wharf consisting of six 13.7 m by 13.7 m reinforced concrete cribs linked together by five 14.6 m long beam spans. As a result of prob

    Jan 1, 1988

  • DFI
    Repairs Of Diaphragm Walls, Lessons Learned

    By Raymond J. Poletto

    This paper describes the special problems that occur with the construction of diaphragm walls and discusses the lessons learned during the repairs of structural walls. Although diaphragm or slurry wal

    Jan 1, 2011

  • TMS
    Reparation of a Master Alloy from a Southern Oregon Laterite

    By Ralph H. Nafziger

    The feasibility of smelting a Ni-Co-Cr-bearing laterite ore from southern Oregon was evaluated by the Bureau of Mines. The objective was to prepare a master alloy for subsequent stainless steel produc

    Jan 1, 1993

  • ABM
    Reparo A Quente No Regenerador Do Alto-forno 3 Da Usiminas - Usina De Ipatinga

    By Eustáquio Vieira Junior

    O Alto-Forno 3 da Usiminas, em Ipatinga, possui três regeneradores de câmara de combustão interna e passou por sua última reforma em 1999. Nessa reforma, não foram realizadas alterações de projeto nos

    Aug 2, 2018

  • ABM
    Reparo A Quente Nos Coletores De Gases De Combustão Através Da Projeção De Massa Refratária Com Video Monitoramento

    By Neussias Inocêncio Henrique

    O processo de coqueificação em uma Coqueria do tipo Heat Recovery é baseado na queima da matéria volátil presente no carvão, principal combustível para aquecimento dos fornos. A Combustão dos gases te

    Aug 17, 2017

  • ABM
    Reparos Especializados Em Regeneradores

    By Johannes Münzer

    Regeneradores são elementos importantes em uma usina siderúrgica. Eles são os responsáveis pelo aquecimento do ar de sopro aplicado no alto-forno a partir do aproveitamento da energia contida nos gase

    Aug 17, 2017