Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Risk-based approach for minimising tailings dam failuresBy M Barker, H Li
The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not
Jul 23, 2018
-
Risk-based approach to setting of flyrock danger zones for blast sitesBy P. A. Davies
Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 11pp., 15 refs. Hazards s
Aug 1, 1995
-
Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda
The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se
Jun 13, 2023
-
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest InterceptorBy Samuel J. Gambino
Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p
Jan 1, 2008
-
Risk-based Explosives Safety Assessment In Switzerland And EuropeBy Andreas Bienz
The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor
Jan 1, 2007
-
Risk-Based Ore Selection from Conditionally Simulated Block ModelsBy J E. Everett, F Grobler
This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo
Aug 12, 2013
-
Risk-based Rehabilitation Strategies for Post-mined Land in FijiBy J J. Robinson, B N. Noller, D M. Franks, G McIlveen, D R. Mulligan, A T. Soro
Fiji is a developing nation that relies on economic opportunities and recently experienced increased interest in mining and mineral exploration that could potentially benefit the country. In order to
Jul 16, 2014
-
Risk-based slope design: Insights from the Thabazimbi failureBy T. Dlokweni, M. Bester, C. Koegelenberg, I. Basson
Certain degrees of safety, economic, and financial risk are implicit in any mining operation. At Thabazimbi Mine, slope stability was one of the major sources of risk, largely due to data uncertaintie
Sep 1, 2025
-
Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda
The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio
Jun 23, 2024
-
Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface MinesBy J Joy, A Bye, G V. Kizil
This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s
Sep 18, 2012
-
Risk-Management Process for Tailings ControlBy Franco Oboni, Iain G. Bruce
The design of tailings containment structures relies on well-understood engineering methods being applied consistently. Unfortunately, not all facilities are designed or managed to the same level of
Jan 1, 2002
-
RISKGATE and Underground OperationsBy J Harris, J Li, M Shi, P A. Kirsch, D Sprott
Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio
Mar 24, 2014
-
RISKGATE – Shared Coal Mining Knowledge for Managing Risks across Ground ManagementBy P Bergin, J M. Galvin, J Harris, J Li, P Kirsch, M Shi, B Hebblewhite, B Whittaker, R Mitra, D Sprott
Controlling unwanted ground movement is critical in mining as well as many other highly hazardous environments, such as construction and tunnelling. Sharing knowledge about effective hazard management
Nov 5, 2014
-
RISKGATE« - A Case Study in Application to Fires on Mobile PlantBy J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott
Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address
Sep 18, 2012
-
Risks Analysis for Ventilation Network Optimisation Processes in Kazakhstan Metal MinesBy A. Karzhau, B. Aldamzharov, Y. Tussupbekov
"This case study produced for the metal mine operating in Kazakhstan, which has ventilation controlled manually and working continuously at maximum speed to keep air flowing through each part of the m
Jan 1, 2019
-
Risks and challenges affecting opencast pillar mining in previously mined underground bord and pillar workingsBy P. L. Ngwenyama, W. W. deGraaf
South Africa is one of the leading producers and exporters of coal globally. A significant amount of the country’s production is obtained from previously mined underground bord and pillar workings. Th
Dec 1, 2021
-
Risks And Opportunities In Continuous Converting For Nickel At IncoBy J. R. Donald
For processing copper, continuous converting has been successfully employed in a variety of locations, but for nickel, there has yet to be a successful commercial implementation of continuous converti
Jan 1, 2005
-
Risks and Returns on the Exploration Dollar; a Case Study of the Australian Mineral Exploration IndustryA study was undertaken to investigate the relationship between the quantity and value of economic demonstrated resources discovered for 12 mineral commodities over a ten year period and the expenditur
Jan 1, 2004
-
Risks Associated With Finite Element Modelling Of Cut And Cover StructuresBy Tony Suckling
The commercially available finite element program Plaxis has a key benefit over other finite element analysis programs in that it has a relatively simple user interface to input and output data. This
Jan 1, 2010
-
Risks Associated With Rockpasses In Deep-Level Tabular Mines Based On Historical Pass PerformanceBy W. C. Joughin
Problems with the stability and performance of rockpasses in deep-level mines are common. This paper presents the results of an investigation into the recorded performance of rockpasses in deep-level
Jan 1, 2005