Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
TBM cutting forces with particular reference to cutter and tunnel diametersBy S. Okubo, K. Fukui
Empirical equations established for estimating the rock strength of the working face based on the cutting forces of a tunnel boring machines (TBM) are further examined and discussed with respect to th
Jan 1, 2003
-
TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021By Gary Peach, Peter Mason
Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining
Jun 13, 2021
-
TBM Data Management And Quality Assurance For The Brightwater Conveyance ProjectBy Jeffrey Mitsopoulos
King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which
-
TBM Design and Performance of Today - A Rapid Development - Where Will it End?The last decade has seen a very rapid development in TBM tunnelling. Some trends are purely technical or economical and others relate more to preferences of different interests. Power levels have more
Jan 1, 1993
-
TBM Excavability: Prediction and Machine–Rock InteractionBy Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
TBM Excavation Of Rogers Pass Railroad TunnelBy Gail B. Knight
INTRODUCTION In May 1984, The Canadian Pacific Railway awarded to the Joint Venture of Foundation of Canada, Ltd. of Toronto, Atlas Construction Co. of Montreal, and S. A. Healy Co. of Chicago the
Jan 1, 1987
-
TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara
This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv
Jun 23, 2024
-
TBM Operation Challenges at DTL3 C931 Project in SingaporeBy Bo Kyung Sim, Dae Young Kim, Jae Won Lee, Ebrahim Farrokh
"The contract C931 of the downtown line 3 (DTL3) mass rapid transit system of Singapore includes half a kilometer twin tunnels running between Mattar and Macpherson stations. An EPB TBM of 6.6 m diame
Jan 1, 2016
-
TBM Performance At Four Hard Rock Tunnels In CaliforniaBy Tim Avery, Steve Klein, Mark Schmoll
Tunnel boring machine (TBM) performance in hard rock is highly dependent on the geologic conditions, including the type of rock and hysical properties like the rock strength, hardness, and the spacin
Jan 1, 1995
-
TBM Recovery Shaft Construction - SR-99 TunnelBy Lance Rasband, Richard Hanke, John Starcevich
"The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure
Jan 1, 2016
-
TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021By Devan Naik, Matthew Stokes, Andy Nigro
This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co
Jun 13, 2021
-
TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024By Dan Swidrak, Bill Zietlow
Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB
Jun 23, 2024
-
TBM Risk Management System considering Predicted Ground Condition Ahead of Tunnel Face: Methodology Development and ApplicationBy Hee-Young Chung, In-Mo Lee, Jeongjun Park, Hangseok Choi, Seok-Won Lee
"When using a Tunnel Boring Machine (TBM) during tunneling work, unexpected ground conditions can be encountered that are not predicted in the design stage. These reduce the stability of tunnels, and
Jan 1, 2016
-
Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux
How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.
Jun 23, 2024
-
TBM System Downtime - Causes, Frequency, And Duration On Six Tunnel ProjectsBy Priscilla P. Nelson, Steven D. Glaser, Thomas D. Rourke, O&apos
Construction records from six projects which employed full-face TBMs to drive 18 km of tunnel in sedimentary rock have been analyzed. More than twenty individual causes of delay could be identified. D
Jan 1, 1985
-
TBM Technology for an Australian Coal Drift: The Grosvenor ProjectBy Robert Marks, Enrico Dal Negro, Richard Schulkins
"In July 2012 construction started on the Grosvenor project, a five million tonne per annum underground longwall mine planned for Moranbah in Central Queensland. Grosvenor is located immediately to th
Jan 1, 2016
-
TBM Technology in a Deep Underground Copper MineBy Ron Allum, Ed VanDerPas
The application of high speed tunneling in a deep underground copper mine is essential for an ambitious expansion project at Magma Copper Company's San Manuel Mine. At stake is the future of over
Jan 1, 1995
-
TBM Trailing Sandwich Belt High Angle Conveyor - RETC2023By Joseph A. Dos Santos
The largest TBM (Tunnel Boring Machine) tunnels are typically along modest slopes, but not always. Occasionally high slope angles are required beyond the capabilities of conventional open trough trail
Jun 13, 2023
-
TBM Tunnel Logistics Management on the Longest Outfall Tunnel in the Middle East - NAT2022By H Vigil, G. Peach
Long tunnels with only one access shaft pose many program problems for logistics, combine these with the requirement to drive directly out under the seabed for 10.2 km, and the program issues become e
Dec 1, 2022
-
TBM Tunnel Offshore Connection - RETC2023By H. Vigil Fernandez, G. Peach
The Musaimeer pump station and outfall project located in Doha Qatar, was designed to collect and manage ground and stormwater and then discharge the treated waters offshore. The project constructed a
Jun 13, 2023