Search Documents

Sort by

  • SME
    Noranda's exploration strategy

    By D. L. Stevens

    Following an in-depth scenario and strategic-planning exercise in 1997, Noranda's mine production goal was set at 500 kt/a (550,000 stpy) of both copper and zinc metal in five years. There had be

    Jan 1, 2000

  • SME
    Noranda's Exploration Strategy (f4182cc3-beca-4d56-8bde-6070cd1c6670)

    By D. L. Stevens

    Following an in-depth scenario and strategic planning exercise in 1997, Noranda's mine production goal was set at 500,000 tonnes per year of both copper and zinc metal within five years. There ha

    Jan 1, 1999

  • CIM
    Noranda/Teniente Copper Bath Smelting Process Variations Impact on Energy Requirements

    By C. M. Díaz, P. J. Mackey, P. Coursol

    In a recent paper [1], the present authors discussed calculated energy consumption numbers in copper sulphide concentrate smelting for four different smelting technologies. For the present study, from

    Jan 1, 2011

  • CIM
    Noranda’s participation in continuous mining developments

    By André Piché

    "Over the last ten years, several developments have been undertaken to conceive a machine capable of carrying out simultaneously all the mining tasks in hard rock deposits: cutting, mucking, hauling,

    Jan 1, 1996

  • SME
    Nordberg 2390 Vs. 7' SHD Symons Cone Crusher Performance Comparison

    By V. Karra

    Based on extensive investigations on the effect of design variables on process performance, during 1982-85, Nordberg developed a 1000 hp cone crusher, with the objective of boosting crushing productiv

    Jan 1, 1988

  • SME
    Nordberg's New Generation Of Crushers: Mp And Hp Cone Crushers

    By D. Kaja

    The Symons Cone Crusher was invented by Edgar B. Symons in 1923. It was quickly accepted as a superior secondary and tertiary crusher. Nordberg manufactured crushers for the Symons Brothers Co. and in

    Jan 1, 1998

  • IIMP
    Norma internacional ASTM para la limpieza e inspección de corona en molinos SAG y de bolas: engranajes de molinos y hornos

    By Thomas Shumka

    El presente texto señala la norma internacional ASIM E2905 aplicada a la limpieza e inspección de corona en los molinos SAG, bolas, engranajes de molinos y hornos donde se busca detectar electrónicame

    Sep 1, 2014

  • AUSIMM
    Normal Fault Hosted Quartz-Scheelite Lodes and Associated Vein Swarm, Glenorchy, NW Otago

    Lower greenschist quartzo-feldspathic schists within the N-S trending Earnslaw Synform of the Upper Wakatipu area are pervaded by late-stage quartz filled extensional and extensional shear fractures,

    Jan 1, 2001

  • CIM
    Normetal Mine

    By W. L. Brown

    "The Normetal mine is about 7 miles east of the Ontario-Quebec boundary, and 13 miles north of the town of Dupuy on the Canadian National railway. The mine workings are largely on lots 44 and 45 in th

    Jan 1, 1954

  • SME
    North 27th Street ISS Extension: Unique Owner/Contractor Agreement Settles Major Disputes

    By Donald J. Olson

    The North 27th St. ISS Extension tunnel will, under present plans, be the last constructed section of Milwaukee Metropolitan Sewerage District?s (MMSD?s) existing deep tunnel system. The 6.5 m (21 ft)

  • SME
    North American Net Import Reliance of Mineral Materials in 2014 for Advanced Technologies

    By R. G. Sinclair, E. Sangine, S. M. Fortier, J. Brainard, K. Stone

    "The U.S. Geological Survey and Natural Resources Canada conducted a study on the net import reliance of each North American country, and the impact of North American trade on the net import reliance

    Jan 7, 2018

  • SME
    North Auckland Line—Tunnel Refurbishment - RETC2021

    By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns

    The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle

    Jun 13, 2021

  • SME
    North Carolina Feldspar Flotation And Solutions To Waste Disposal Problems - Introductions

    By Immo H. Redeker

    This is a final progress report on a cooperative project conducted by three private feldspar companies,** North Carolina State University, and the federal Bureau of Mines. The object of the project wa

    Jan 1, 1970

  • SME
    North Carolina Natural Phosphate-A Geologic And Agronomic Overview (e1582aa4-d27a-4a73-aae0-af86da15115c)

    By I. K. Gilmore

    Texasgulf Inc. currently operates an open pit phosphate mine in the central coastal plain of North Carolina. The area of phosphate deposition lies within the Aurora Phosphate district which consists o

    Jan 1, 1995

  • SME
    North Carolina Phosphate Concentration. The Texas Gulf Sulphur Company Project At The Asheville Minerals Research Laboratory

    By Immo H. Redeker

    Introduction In October of 1961 Texas Gulf Sulphur Company contacted the Asheville Minerals Research Laboratory, of the North Carolina State University, and requested assistance in the development of

    Jan 1, 1971

  • CIM
    North Rim deposits Athabasca Basin

    By L. A. Homeniuk, R. J. McH. Clark

    "The Maurice Bay deposit, the Stewart Island showing, the Fond-du-Lac deposit, the Middle Lake showing and the Nisto deposit are located on the North Rim of the Athabasca Basin. They are probably unco

    Jan 1, 1986

  • CIM
    North Star and Don Jon Mines

    "The North Star and Don Jon copper deposits lie beneath the waters of Thompson Lake, which is 12 miles east of Flin Flon, Manitoba. The deposits were discovered during the years 1949 and 1951 by diamo

    Jan 1, 1949

  • SME
    Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023

    By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch

    The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align

    Jun 13, 2023

  • DFI
    Northeast Boundary Tunnel – Mount Olivet Road Drop Shaft

    By Jeremiah M. Jezerski, Russell H. Lutch

    The Mount Olivet Road Drop Shaft (MOR-DS) support of excavation (SOE) is a circular unreinforced concrete shaft with an inside diameter of a 30.5 ft (9.3 m) and depth of 120.5 ft (36.7 m), constructed

    Oct 1, 2022

  • CIM
    Northeast Corner of Its Development Alberta and Adjacent Area: and Mineral Potential

    By John D. Godfrey

    A brief account of economic developments in and around northeastern Alberta is presented and mention is made of mining and industrial developments currently of interest in the area. Planned and projec

    Jan 1, 1960