Search Documents

Sort by

  • CIM
    Design and Construction of a Unique Shaft Bottom Structural System for a Potash Mine

    By E. Nolasco, J. Ouellet, T. Tikka

    "Shaft bottom structural systems are used in underground mining to support transfer of personnel, equipment and ore to and from underground to the surface. This paper first summarizes the evolution of

    Jan 1, 2019

  • ISEE
    Design and Construction of an Electric Oven to Determine the Detonation Temperature of the Fulminant

    By Alexander S. Escalante, Luis R. Ramirez, Nelson A. Arostegui

    Research, analyze, discuss, design, and build an electric oven to perform one of the quality control tests the fanel or common fulminers to determine what temperatures they can detonate at. Give pract

    Feb 1, 2020

  • CIM
    Design and Construction of Deep Shaft Concrete Linings in the UK

    By F. A. Auld

    "During the period 1958-1980 seven deep shafts were sunk from the surface in the UK. From 1977 until 1989 sixteen deep shafts were sunk in the UK, all concrete lined. Subsequently from 1989 up to the

    Jan 1, 2019

  • SME
    Design And Construction Of Earth Bottom Thickeners

    By Edward S. Hsia

    Pluor Utah has been closely associated with the engineering and construction of earth bottom thickeners for porphyry copper operations, for the counter-current decantation circuit of a gold cyanide pl

    Jan 1, 1977

  • CIM
    Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing Technology

    By J. Ouellet

    The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr

    Aug 1, 2013

  • DFI
    Design And Construction Of Integral Drilled Shaft - Columns For The Boscawen-Canterbury Bridge

    By Frederick C. Rhyner

    Drilled shafts have become an economical foundation choice for bridges in the northeast United States, especially when they can be constructed over water without the use of cofferdams. For the Boscaw

    Jan 1, 2004

  • AUSIMM
    Design and Construction of Large Caverns in Granite – Ulu Jelai Hydroelectric Project, Malaysia

    By B Chapman, B Gaida, L Drowley

    The 372 MW Ulu Jelai Hydroelectric Project is a peaking power scheme located in the Cameron Highlands, Malaysia. The main features of the project include an 84 m high roller compacted concrete dam; tw

    Sep 17, 2014

  • SME
    Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022

    By M. Trim, Y. Sun, D. Tepavac, A. Kumar

    Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse

    Dec 1, 2022

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • DFI
    Design And Construction Of Micropiles Each Subject To 110 Kips Of Lateral Load

    By Andrew Baxter

    The Crystal Bridges Museum of American Art in Bentonville, Arkansas is a beautiful glass and concrete structure cut into a valley that mingles with water ponds spanned by multiple bridges with suspend

    Jan 1, 2008

  • CIM
    Design and Construction of Mineral Processing Plants using Project Management

    By A. J. Williams

    "Whenever a decision is made to bring a mineral deposit into production, the Owner in actual fact has decided to convert substantial sums of capital into productive capacity with the intenti6n of maki

    Jan 1, 1974

  • DFI
    Design and Construction of Mixed Ground Working Platform for a CCR Surface Impoundment

    By Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste

    An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D

    Jan 1, 2019

  • CIM
    Design and Construction of Natural Gas Transmission Lines

    By B. W. Snyder

    INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h

    Jan 1, 1951

  • SME
    Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022

    By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent

    The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit

    Dec 1, 2022

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • SME
    Design and Construction of REM Tunnels and Underground Structures - RETC2023

    By Verya Nasri, Agustin Rey

    Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill

    Jun 13, 2023

  • DFI
    Design And Construction Of Shear Pins For Landslide Stabilization

    By Fei-chiu Huang

    A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv

    Jan 1, 2010

  • DFI
    Design and Construction of Specialty Foundation for the Historic Virginia State Capitol Building

    By Robert S. Thomas, Bernard M. Tarralle, Nasser Massoudi

    "The Commonwealth of Virginia is restoring and expanding its Capitol of great historic significance. Designed by Thomas Jefferson in 1785, it is the second oldest Capitol building in the United States

    Jan 1, 2005

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • CIM
    Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )

    By Earle J. Klohn

    "The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr

    Jan 1, 1972