    North Auckland Line—Tunnel Refurbishment - RETC2021

    By Shu Fan Chau, Innes Duncan, Harry Asche, Bill Newns

    The North Auckland Line (NAL) in Northland, New Zealand, is being upgraded to pass Hi-Cube containers. The line includes many tunnels and bridges which need to be refurbished to improve structural cle

    Jun 13, 2021

  • SME
    Construction of the Plymouth Tunnel by SEM Based on a Permanent Shotcrete Liner for The Purple Line Project in Maryland: A Case Study - RETC2021

    By Nicholas Tabor, Norbert Fuegenschuh, Richard Taylor, Jean-Marc Wehrli

    The Plymouth Tunnel forms part of the 16-mile long route of the Purple Line Light Rail Project promoted by the Maryland Transit Administration. The tunnel is approximately 1,220 feet in length with a

    Jun 13, 2021

  • SME
    Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

    By Michael Schultz, Gregory Sanders

    In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu

    Jun 13, 2021

  • SME
    Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021

    By Glenn Mongillo

    Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap

    Jun 13, 2021

  • SME
    Quantification of Tangible and Intangible Benefits of Digitalization in Tunnel Construction - RETC2021

    By Angus Maxwell, Jacob Grasmick

    As the tunneling industry continues to adopt Tunnel 4.0, digital twins of the tunnel construction site are becoming standard requirements for tunneling projects. However, the benefits of these remain

    Jun 13, 2021

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Dustless Hard Rock Tunneling Methods - RETC2021

    By Cody Giroux, Homer Scurlock, Michel Wasag

    Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive

    Jun 13, 2021

  • SME
    Review of Measured Activity Times and Their Impacts on Machine Utilization in Operation of Selected TBMs - RETC2021

    By P. Nelson, R. O’Connell, J. Rostami

    Tunnel boring machine (TBM) system utilization is a critical factor for predicting machine performance. The process of estimating machine performance, including rate of penetration (ROP) and machine u

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021

  • SME
    Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground Works

    By Jürg Künzle

    Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio

    Jun 13, 2021

  • SME
    The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021

    By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan

    The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th

    Jun 13, 2021

  • SME
    Case Study of EPB-TBM Crossing through Boulder Cluster and Method Selected for Claim Resolution - RETC2021

    By Ehsan Nasiri, Keivan Pak Iman

    Historically, boulders are a frequent source of problem in soft ground tunneling. It is important to attempt to make an assessment of the nature and quantity of the boulders, although in many cases, i

    Jun 13, 2021

  • SME
    Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021

    By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield

    During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin

    Jun 13, 2021

  • SME
    Lesson Learned During the EPB TBM Launch Using Umbilical and Muck Pump - RETC2021

    By D. Nebbia, R. Aliberti, F. Solesin

    The launch of a Tunnel Boring Machine (TBM) is one of the most challenging activity parts of the construction of a tunnel. Challenges are coming from limited space available, learning curve, concurren

    Jun 13, 2021

  • SME
    The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021

    By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart

    This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to

    Jun 13, 2021

  • SME
    Design of Large Underground Near Detector Cavern for Fermilab in Batavia, Illinois - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Fermilab is constructing a large underground cavern in Limestone to house scientific equipment. The cavern will have a complex L-shaped geometry and about 215-foot depth with relatively shallow rock c

    Jun 13, 2021

  • SME
    CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021

    By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James

    Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i

    Jun 13, 2021

  • SME
    Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021

    By Leo Gentile, David Selhorst

    The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control

    Jun 13, 2021