Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Solid bowl decanter centrifuges – the alternative technologyBy M Player, R Klug, N Schwarz
There are several technologies available for thickening and dewatering of mining process slurries. The most commonly used are thickeners and filters, but technological developments have made solid bow
Jul 1, 2021
-
Using technology to support best practice for tailings storage facilities (TSF) management, governance and disclosureBy H Arvidson, A Walker, N Pollock
Following the recent tailings tragedy in Brumadinho, the Investor Mining and Tailings Safety Initiative was formed representing institutional investors in the mining industry. This Initiative, led by
Jul 1, 2021
-
Emerging Data Processing Technologies for TBM Projects— State of the Art and Outlook - RETC2021By Ulrich Maidl, Jamal Rostami, Ulf Gwildis
Tunnel Boring Machines (TBM) have more or less become the preferred method of tunneling in various ground conditions and Programmable Logic Controllers (PLC) or microprocessors are standard features o
Jun 13, 2021
-
Calibration Techniques for Discrete Element Method Analysis in Soft Ground TBM Applications - RETC2021By Glenn Mongillo
Discrete Element Method (DEM) software has been successfully used to simulate various machine/soil interactions and provide insight for industries such as mining and bulk material processing. This pap
Jun 13, 2021
-
Contracting Practices for Underground Freight Transportation Projects: A Look at Cargo Sous Terrain - RETC2021By Jürg Künzle
The use of the underground space has been a recurring issue in human history, whereas the reasons for building subsurface structures have changed over time. In the decades to come, the world will be m
Jun 13, 2021
-
Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan
Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio
Jun 13, 2021
-
High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler
In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi
Jun 13, 2021
-
Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar
The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat
Jun 13, 2021
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
High-Frequency InSAR Displacement Monitoring and Trend Detection Analysis for Tunneling Projects - RETC2021By Marie-Josée Banwell, Cyriac Sebastian, Giacomo Falorni, Sara Del Conte
Interferometric Synthetic Aperture Radar (InSAR) is a satellite-based monitoring technique that complements other in-situ methods for detecting and measuring surface displacement. Recent advances in d
Jun 13, 2021
-
Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry
Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel
Jun 13, 2021
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021By D. Lynn, D. Arthur
Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los
Jun 13, 2021
-
CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James
Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i
Jun 13, 2021
-
Major Underground Station in Montreal - RETC2021By Verya Nasri, Jaeseoung Lee, Ashish Bhargava, Shashank Gupta
This paper presents the unique design and construction challenges for the Technoparc Station, located in downtown Montreal as a part of Réseau Express Métropolitain (REM), a light rail rapid transit s
Jun 13, 2021
-
InSAR Monitoring of Tunneling Surface Displacement - RETC2021By Brian Young, Ben Pantony
Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O
Jun 13, 2021
-
TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021By Devan Naik, Matthew Stokes, Andy Nigro
This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co
Jun 13, 2021
-
Final Lining Construction of a SEM Cavern–Regional Connector Transit Project - RETC2021By Christophe Bragard, Rebecca Reeve
The Regional Connector Transit Corridor (RCTC) Project is a 1.9-mile-long metro light-rail extension project that traverses the historical core of downtown Los Angeles, California. This project aims t
Jun 13, 2021
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021