Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Dynamic Modelling for Brownfield Process SimulationBy Michel Ruel, Ali Soltanzadeh, Benjamin Légaré
High fidelity commercial process simulation packages can be used at different stages of a greenfield project, from initial plant design to operator training in the later stages. However, there are sev
Jan 1, 2016
-
A Survey to Better Understand Collegiate Talent for Recruiting PurposesBy Paul Sainato
Recruiting and retaining students in the explosives industry is becoming increasingly important each year. With no undergraduate degree in explosives engineering currently available in the United Stat
Jan 1, 2016
-
Tunnelling Under the Fraser River at 6 Bar - Design and Construction of the Port Mann Main Water Supply TunnelBy Tim Langmaid, Steve Skelhorn, Stephanie Robillard, Allen Mitchell
"The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of t
Jan 1, 2016
-
Particle Damage and Exposure Analysis of Microwave Treated Ores for Bio-Heap LeachingBy S. M. Bradshaw, E. Charikinya
"Microwave induced cracks have the potential to enhance metal recovery from coarse sphalerite particles in heap leaching operations by creating new crack surface areas for lixiviant and enhancing valu
Jan 1, 2016
-
EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow ConditionsBy Matthew Geary, Stephen J. Marino, Jordan A. Schreiner
"INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo
Jan 1, 2016
-
Larger Tonnages, Larger Crushers?By Ian Orford, Ken L. Boyd
"Can the ever-increasing tonnages of ore and waste being mined today be accommodated simply by using bigger and better crushers? This paper updates the principal author’s earlier publication, “Crushin
Jan 1, 2016
-
Life-Cycle Costing - An Economic Approach to Evaluate the Operational Equipment of TunnelsBy Hans Adden, Anne Lehan, Markus Thewes
"1. INTRODUCTION AND MOTIVATION Traditionally design processes are focussed at creating new tunnels for lowest building cost. But the trend towards sustainable constructions in tunnelling has greatly
Jan 1, 2016
-
Business Management: Lead the People and Manage the WorkBy M. Bunch
"THE SUPER CYCLE IS GONE The utopia of the rising sales volume, for mining companies from 2002-2011, was entirely due to rising production volume and prices. The Australian mining sector experienced a
Jan 1, 2016
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016
-
Case Study: Feather River West Levee Program Cutoff WallsBy Kyle R. Lackner, Jared P. Williams
"The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat
Jan 1, 2016
-
Bentonite Self-Hardening Slurry Mix Variations and Field Implementation MethodsBy Christopher R. Harris
"Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo
Jan 1, 2016
-
Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay DevelopmentsBy Mikael Calando, Thomas Joussellin
"San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa
Jan 1, 2016
-
Jet Grouted Foundation for 57-Story TowerBy Robert Alperstein, Nidal AbiSaab, Joe Pastore
"This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit
Jan 1, 2016
-
Interactive 3-Dimensional Modeling of Anchors at Bluestone DamBy Jamey Rosen, Georgette Hlepas
"Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement
Jan 1, 2016
-
Thermomechanical Properties Of Bilayer La2Zr2O7 Thermal Barrier CoatingsBy Xingye Guo, Yeon-Gil Jung, James Knapp, Zhe Lu, Jing Zhang, Li Li
La2Zr2O7 is a promising thermal barrier coating material due to its low thermal conductivity and superior high temperature stability. In this work, Bilayer La2Zr2O7 and conventional 8 wt% yttria stabi
Jan 1, 2016
-
Advanced Oxygen Lances For Safer Furnace Tapping OperationsBy Peter Sylvén, Darwin Morales
Despite being crucial for the smelting process, furnace tapping using oxygen lances has not been considered an operation that brings value. Therefore, these important tools have not seen a significant
Jan 1, 2016
-
Thermodynamic Analysis And Experiments On Vacuum Separation Of Sn-Sb AlloyBy Anxiang Wang, Kunhua Wu, Yifu Li, Junjie Xu, Yongnian Dai, Bin Yang, Lingxin Kong
In this study, the saturated vapor pressures of tin (Sn) and antimony (Sb), the separation coefficient and the vapor-liquid phase equilibrium of Sn-Sb alloy were theoretically analyzed, which demonstr
Jan 1, 2016
-
Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power FacilityBy David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar
"With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil
Jan 1, 2016
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric ProjectBy Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews
"The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re
Jan 1, 2016