Search Documents

Search Again

Search Again

Sort by

  • CIM
    Application of Dynamic Modelling for Brownfield Process Simulation

    By Michel Ruel, Ali Soltanzadeh, Benjamin Légaré

    High fidelity commercial process simulation packages can be used at different stages of a greenfield project, from initial plant design to operator training in the later stages. However, there are sev

    Jan 1, 2016

  • ISEE
    A Survey to Better Understand Collegiate Talent for Recruiting Purposes

    By Paul Sainato

    Recruiting and retaining students in the explosives industry is becoming increasingly important each year. With no undergraduate degree in explosives engineering currently available in the United Stat

    Jan 1, 2016

  • SME
    Tunnelling Under the Fraser River at 6 Bar - Design and Construction of the Port Mann Main Water Supply Tunnel

    By Tim Langmaid, Steve Skelhorn, Stephanie Robillard, Allen Mitchell

    "The Port Mann Main Water Supply Tunnel project provides a critical water main crossing of the Fraser River for the owner, Greater Vancouver Water District (Metro Vancouver). The project consists of t

    Jan 1, 2016

  • CIM
    Particle Damage and Exposure Analysis of Microwave Treated Ores for Bio-Heap Leaching

    By S. M. Bradshaw, E. Charikinya

    "Microwave induced cracks have the potential to enhance metal recovery from coarse sphalerite particles in heap leaching operations by creating new crack surface areas for lixiviant and enhancing valu

    Jan 1, 2016

  • SME
    EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow Conditions

    By Matthew Geary, Stephen J. Marino, Jordan A. Schreiner

    "INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo

    Jan 1, 2016

  • CIM
    Larger Tonnages, Larger Crushers?

    By Ian Orford, Ken L. Boyd

    "Can the ever-increasing tonnages of ore and waste being mined today be accommodated simply by using bigger and better crushers? This paper updates the principal author’s earlier publication, “Crushin

    Jan 1, 2016

  • SME
    Life-Cycle Costing - An Economic Approach to Evaluate the Operational Equipment of Tunnels

    By Hans Adden, Anne Lehan, Markus Thewes

    "1. INTRODUCTION AND MOTIVATION Traditionally design processes are focussed at creating new tunnels for lowest building cost. But the trend towards sustainable constructions in tunnelling has greatly

    Jan 1, 2016

  • SME
    Business Management: Lead the People and Manage the Work

    By M. Bunch

    "THE SUPER CYCLE IS GONE The utopia of the rising sales volume, for mining companies from 2002-2011, was entirely due to rising production volume and prices. The Australian mining sector experienced a

    Jan 1, 2016

  • DFI
    Cannonsville Dam Emergency Borehole Response

    By John Vickers, William H. Hover, Paul C. Schmall

    "Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n

    Jan 1, 2016

  • DFI
    Case Study: Feather River West Levee Program Cutoff Walls

    By Kyle R. Lackner, Jared P. Williams

    "The Sutter Butte Flood Control Agency initiated the Feather River West Levee (FRWL) Program in 2010 to bring 35 miles of levee along the Feather River into compliance with applicable Federal and Stat

    Jan 1, 2016

  • DFI
    Bentonite Self-Hardening Slurry Mix Variations and Field Implementation Methods

    By Christopher R. Harris

    "Considerations are presented for developing and implementing self-hardening slurry mix designs to be utilized in barrier seepage walls. Slag-cement-cement-bentonite (SCCB) slurries are the primary fo

    Jan 1, 2016

  • DFI
    Applications of Diaphragm Wall Technology for Deep Foundations and Permanent Underground Structures for the Transbay Transit Center and the Transbay Developments

    By Mikael Calando, Thomas Joussellin

    "San Francisco's rapid growth has caused the city to plan for the Transbay Transit Center Project, a visionary transportation and housing project, that will transform downtown San Francisco and the Sa

    Jan 1, 2016

  • DFI
    Jet Grouted Foundation for 57-Story Tower

    By Robert Alperstein, Nidal AbiSaab, Joe Pastore

    "This paper describes the design and construction aspects of the foundation support for a 57-story building currently under construction in lower Manhattan. The site is located near the East River wit

    Jan 1, 2016

  • DFI
    Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam

    By Jamey Rosen, Georgette Hlepas

    "Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement

    Jan 1, 2016

  • TMS
    Thermomechanical Properties Of Bilayer La2Zr2O7 Thermal Barrier Coatings

    By Xingye Guo, Yeon-Gil Jung, James Knapp, Zhe Lu, Jing Zhang, Li Li

    La2Zr2O7 is a promising thermal barrier coating material due to its low thermal conductivity and superior high temperature stability. In this work, Bilayer La2Zr2O7 and conventional 8 wt% yttria stabi

    Jan 1, 2016

  • TMS
    Advanced Oxygen Lances For Safer Furnace Tapping Operations

    By Peter Sylvén, Darwin Morales

    Despite being crucial for the smelting process, furnace tapping using oxygen lances has not been considered an operation that brings value. Therefore, these important tools have not seen a significant

    Jan 1, 2016

  • TMS
    Thermodynamic Analysis And Experiments On Vacuum Separation Of Sn-Sb Alloy

    By Anxiang Wang, Kunhua Wu, Yifu Li, Junjie Xu, Yongnian Dai, Bin Yang, Lingxin Kong

    In this study, the saturated vapor pressures of tin (Sn) and antimony (Sb), the separation coefficient and the vapor-liquid phase equilibrium of Sn-Sb alloy were theoretically analyzed, which demonstr

    Jan 1, 2016

  • DFI
    Diaphragm Wall Construction, Instrumentation, and Testing for a Hydroelectric Power Facility

    By David Gatto, Nicolas A. Willig-Friedrich, Jeff A. Segar

    "With the increasing demand for electricity, and requirements to generate this power cleanly, more producers are turning towards hydroelectric power. A project in Iowa currently under construction wil

    Jan 1, 2016

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016