    Design and Construction Considerations for the Pawtucket CSO Tunnel - RETC2023

    By Victor Despointes, Stephane Polycarpe, Kathryn Kelly, Chris Feeney, Brian Hann, Vojtech Ernst Gall

    The Pawtucket Tunnel is a 2.2-mi, 30.2-ft diameter CSO storage tunnel in Rhode Island. The primary tunnel is built using a dual-mode open-EPB TBM capable of sealing the face within 120 seconds to mana

    Jun 13, 2023

  • SME
    Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023

    By Chris Lynagh, Collin Schroeder

    Determining the best excavation method is a critical step in successful tunnel construction. In rock tunneling, several factors can dictate the excavation method, such as: (1) rock characteristics, (2

    Jun 13, 2023

  • SME
    Eisenhower Memorial Tunnel—50 Years Later - RETC2023

    By Neal Retzer, Adam Bedell, Nick Cioffredi

    The first wagon trail across Loveland Pass was built in 1869 thus starting the struggle between the Colorado Rockies and interstate travel. The 1st Pioneer Bore underneath Loveland Pass at the Contine

    Jun 13, 2023

  • SME
    Flood Resilience for San Francisco - RETC2023

    By Eva K. Fernandez, Paul Y. Louie, Derek S. Adams, Renée L. Fippin

    The Folsom Area Stormwater Improvement Project is part of SFPUC’s flood resilience efforts under the Sewer System Improvement Program. This 4,000-foot-long, 12-footinside- diameter tunnel will help re

    Jun 13, 2023

  • SME
    Risk Baseline Report: An Innovative Risk Management Approach for a Complex Underground Project - RETC2023

    By David J. Hatem, K. Bhattarai

    The increasing popularity of alternative methods in delivery of underground infrastructure projects has given rise to innovative and collaborative contracting strategies to allocate and manage the uni

    Jun 13, 2023

  • SME
    Evaluating the Tradeoffs Between Microtunnelling and Tunnel Boring Machines for Small Diameter Tunnels—A Case Study of the Ferry Road and Riverbend Combined Sewer Relief Project - RETC2023

    By Dani Delaloye, Kas Zurek

    Evaluating and selecting the appropriate excavation method is a key to the success of any tunnelling project. The benefits and risks of different methods should be well understood by the designer and

    Jun 13, 2023

  • SME
    New Water Supply—Oslo - RETC2023

    By Ingunn Opland, Silje M. Tinderholt

    Drill and blast project in Norway’s capital. The contract consists of 7 rock caverns (350–950 m2), 9.2 km tunnels, and four shafts. With 110 blue-collar and 31 white-collar, the project produces an av

    Jun 13, 2023

  • SME
    30 Years of Advances in Risk Management for Underground Projects - RETC2023

    By Kevin Lundberg, Philip Sander, Daniel Weinberger, John Reilly

    Since the early days of risk management, developments in technology and guidelines (ITA, ITIG, OGG, UCA) have advanced risk management and probable cost estimating, which are now widely recognized. WS

    Jun 13, 2023

  • SME
    Development and Performance of Large Span Caverns at Depth for the LBNF Far Site Project - RETC2023

    By S. Pollak, J. Rickard

    The Long Baseline Neutrino Facility Far Site in Lead, South Dakota is currently under construction and involves drill and blast excavation of the largest and deepest caverns in North America. This pap

    Jun 13, 2023

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Progressive Design-Build in the Tunneling/Underground Construction Industry—Perspective from the Private Sector - RETC2023

    By Carlos Tarazaga

    Progressive Design-Build (PDB) is an emerging variation of alternative delivery programs in the underground construction industry. PDB refers to the way a construction project design is developed by t

    Jun 13, 2023

  • SME
    Lessons Learned: Implementing BIM for the Chiltern Tunnels for High Speed 2 in the UK - RETC2023

    By Yuan Le, Dominic Reda, Vojtech Ernst Gall, Kurt Zeidler, Tomasz Kecerski

    High Speed 2 (HS2) mandated that Building Information Modelling (BIM) processes be implemented during design and construction. Gall Zeidler Consultants (GZ) was responsible for developing the BIM Mode

    Jun 13, 2023

  • SAIMM
    Dependence of solar reflector soiling on location relative to a ferromanganese smelter

    By K. J. Craig, M. A. Swart, Q. G. Reynolds, L. Hockaday

    A solar reflector soiling study was carried out at a ferromanganese smelter in South Africa to assess the soiling rates at different locations around the plant. Several meteorological parameters were

    Jun 5, 2023

  • SAIMM
    Assessing coal mine closures and mining community profiles for the ‘just transition’ in South Africa

    By A. T. van Zyl, M. Mthenjane, M. J. Cole

    Growing global concern over the impacts of climate change, attributable largely to fossil fuel energy sources, has led to the widely shared goal for a ‘just transition’ to cleaner energy and reduced d

    Jun 5, 2023

  • SAIMM
    Predicting open stope performance at an octree resolution using multivariate models

    By K. Woodward, Y. Potvin, B. McFadyen, M. Grenon

    Open stoping has become a popular mining method in hard rock mines, not only due to the safety of the method as a non-entry approach, but also because of the high extraction rate and low costs. At min

    Jun 5, 2023

  • SME
    Projectile Impact Testing of a Concrete Coal Mine Seal Rated for 120 psi - Mining, Metallurgy & Exploration (2023)

    By Kyle A. Perry, Ethan A. Steward

    The mining of underground coal presents several hazards for miners, including the risk of an explosion fueled by methane gas and coal dust. Methane gas, produced during coal formation, can continuousl

    Jun 2, 2023

  • SME
    Using Near‑Miss Events to Create Training Videos - Mining, Metallurgy & Exploration (2023)

    By Brendan Demich, Brendan Macdonald, Timothy J. Orr, Jonathan K. Hrica, CASSANDRA L. HOEBBEL, Jason Navoyski, Jennica L. Bellanca

    Haul truck fatal accidents and injuries continue to be a significant concern for the mining industry. However, the availability of high-quality training materials continues to be limited. Near-miss in

    Jun 1, 2023

  • AUSIMM
    Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)

    By G Zhang, I Glacken

    Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p

    May 24, 2023

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • AUSIMM
    ML and AI for resource estimation – what could possibly go wrong? Nothing! Everything!

    By M J. Nimmo

    extremely powerful tools for building predictive and generative models. ML can be used for building highly accurate regression and classification models. But without careful data science and statistic

    May 24, 2023