Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
Operational Strategy at Chagres Smelter to Maximize Installed CapacityBy R. Bonifaz, R. Subiabre
The Chagres Smelter, part of the Anglo American plc group, situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its oper
Jan 1, 2007
-
Preparation Of Environmental Impact Statements For The Mining IndustryThere are a number of methodologies which can be used for the preparation of environ- mental impact statements. Selection of a method depends upon the type of project and the environmental character
Jan 1, 1976
-
OFR 195(2) - 83 - Evaluation of Safety Assessment Methods for the Mining Industry Volume II - User's Manual of Safety Assessment Methods for Mine Safety OfficialsBy P. M. Daling
The objectives of this study were to examine a representative cross section of formal safety analysis techniques developed for the nuclear and aerospace industries, to recommend those methods that wou
Jan 1, 2006
-
Ergonomic Selection of Stemming Plugs for Quarry Blasting OperationBy M. Z. Emad, M. U. Khan, A. ur Rehman
Stemming plugs are used as an accessory in drilling and blasting industry. They supplement conventional stemming material (i.e. drill cutting) with retention of gases in the drill hole that result in
Jan 1, 2019
-
Multi-objective Mathematical Programming Framework for Integrated Oil Sands Mine Planning and Tailings Disposal Optimization - Mining, Metallurgy & Exploration (2021)By Hooman Askari-Nasab, AHLAM MAREMI, EUGENE BEN-AWUAH
In oil sands mining, tailings are voluminous unwanted by-products generated from extracting the desired mineral from the mined ore. Dyke construction and backfilling activities require well-managed te
Apr 14, 2021
-
RI 9130 Utilization of Scrap Preheating and Substitute Slag Conditioners for Electric Arc Furnace SteelmakingBy Elger. G. W.
The Bureau of Mines investigated preheating of continuously fed, fragmented ferrous scrap charges by furnace offgases and utilizing substitutes for imported fluorspar to condition electric steelmaking
Jan 1, 1987
-
OFR-25-80 Cost And Time Analysis Of The Mining And Environmental Requirements In The Premining Stage For Copper Mining In The Northern Highland, WisconsinBy James P. Ludwig
This report provides the results of a two year study of the projected time and cost requirements for new mine development in Wisconsin and is based on a unique blend of information from mining company
Jan 1, 1979
-
OFR-121-84 Development Of Foreign Economic Indices - Phase I For ZambiaBy Alice M. Chieruzzi
This Country Documentation Report presents the development of economic indices for Zambia for the period from 1970 through 1981. The work done through the Bureau of' Mines, Minerals Availability
Jan 1, 1983
-
IC 9079 Improved Backup Alarm Technology For Mobile Mining EquipmentBy Guy A. Johnson
Despite the use of warning alarms to alert miners to the backward movement of large mining equipment, miners still are injured too frequently in backup accidents. Currently approved backup alarm techn
Jan 1, 1986
-
Planning and Designing For Mining ConservationBy David B. Brooks, Roger L. Williams
Control of the environment is as old as mining. Engineers have always had to consider how best to deal with the surface, and the character of the surface environment always affects mining method in so
Jan 1, 1973
-
Modelling of Hydrocone Crushers for Controlling Product QualityBy B. Csoke
To improve the efficiency of the crushing/screening plant of Bazalt-Középko Kobányák Ltd. (Hungary), the implementation of computer aided quality control is planned. In the current phase, the R & D wo
Jan 1, 2014
-
OFR-20-78 Demonstration Of Fire Suppression Systems On Underground Mining EquipmentBy Ferdinand Roehlich
An evaluation of the use of manually activated, installed,. dry chemical fire protection systems on underground metal and nonmetal mine vehicles is described. In addition, an assessment of the possibl
Jan 1, 1977
-
An empirical model for accurate prediction of yield stress by slump flow based on a mini cylindrical moldBy Aixiang Wu, Minjie Zhang, Zhuen Ruan, Yiming Wang
The paper combines theoretical and experimental analysis to improve the accuracy of predicting paste yield stress by slump flow. It derives an analytical model of slump flow for yield stress, providi
Aug 1, 2023
-
OFR-135-83 Critical Parameters For Tailing EmbankmentsBy Gregory B. Beacher
Analyses have been performed on geotechnical properties of copper, uranium and phosphate (gypsum) tailings materials, with the intent of identifying typical measures of variability within and among si
Jan 1, 1983
-
Energy Conservation for the Mining IndustryBy E. Howard Lambert
"Operating costs of mining plants are increasing due to the increased cost of labour, materials and fuels. Labour and materials costs are factors not readily controlled. However, the use of energy fro
Jan 1, 1973
-
RI 9505 - A Field Test of Electromagnetic Geophysical Techniques for Locating Simulated In Situ Mining Leach SolutionBy D. R. Tweeton
The U.S. Bureau of Mines, the University of Arizona, Sandia National Laboratories, and Zonge Engineering and Research Organization, Inc., conducted cooperative field tests of six electromagnetic (EM)
Jan 1, 2010
-
OFR-21(1)-78 Brake Evaluations & Recommendations - Evaluation And Development Of Performance Requirements Of Braking Systems For Rubber-Tired Mining Equipment In Underground Non-Coal MinesBy Walter W. Kaufman
The braking performance of underground, rubber-tired, non-coal mining vehicles is evaluated. Surveys of mining equipment and braking manufacturers and underground stopping tests are discussed as they
Jan 1, 1977
-
Accelerated Training for EngineersBy W. G. McBride
THE present demand for men with engineering training exceeds anything in the history of the profession. Recent estimates indicate that mechanization of war has reached such a stage that at least twelv
Jan 1, 1942
-
RI 9502 - Accurate Power Monitoring for Electric Arc FurnacesBy Alan D. Hartman
Standard metering of electric arc furnaces usually uses root mean square (RMS) or true root mean square (TRMS) measurements for determining power. Only sinusoidal signals are accurately described by R
Jan 1, 2010