Search Documents

  • DFI
    Sand Compaction Piles ? Synopsis

    By A. Holeyman

    The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ

    Jan 1, 2010

  • NIOSH
    RI 7123 Recovery Of Cerium And Lanthanum By Ozonation Of Lanthanide Solutions

    By D. J. Bauer

    Oxidation of mixed lanthanide solutions with ozone at pH 4.5 and at ambient temperature resulted in precipitation of 98 percent of the original cerium present. Corresponding cerium purity was increase

    Jan 1, 1968

  • SME
    The Application Of Sunshine Nitrous-Sulfuric Acid Pressure Leaching To Sulfide Materials Containing Platinum Group Metals

    By C. G. Anderson

    Historically, the treatment of orebodies for recovery of valuable constituents presents many processing challenges. In a time of heightened environmental awareness, the constraints placed on processin

    Jan 1, 1995

  • CIM
    Mining Tremors Effect Prediction: Models, Parameter Calibration and Uncertainty

    By P. Kolodziejczyk

    Mining seismicity can be harmful both under and on the surface. ? Tremors are not totally damaging, but destructive to buildings and infrastructure, especially in highly urbanized regions, such as Up

    Aug 1, 2013

  • NIOSH
    OFR-76(1)-79 Development Of Highwall Mining Equipment (Phase I) Volume I

    By Mandius C. Lundal

    This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner's susceptibilit

    Jan 1, 1977

  • AUSIMM
    Tailings Disposal Costs ù The Hidden Design Parameter

    The purpose of this paper is to look at the costs of tailings disposal, and in particular the comparative costs of different disposal methods in different situations. Costs are often the hidden design

    Jan 1, 2000

  • SME
    St. Louis Skinker–McCausland Tunnel

    By Jozef F. Zurawski

    River Des Peres Foul water Interceptor (Skinker–McCausland Tunnel) is a gravity sewer tunnel constructed to eliminate dry sewage overflows during high river stages and to improve the wastewater collec

    Jan 1, 2001

  • NIOSH
    OFR-61-88 Improved Ventilation Of Sealed Mine Gob

    By Steven D. Wirch

    Abandoned underground coal mine areas must either be sealed or ventilated to comply with federal mine regulations. Ventilation of these abandoned areas is often impractical due to roof falls and inade

    Jan 1, 1988

  • ISEE
    Within a Stones’ Throw

    By James Goldberg, Mark Withey

    The Material Service Thornton quarry is a multi-million annual production tons complex. Surrounded by busy surface highways, and divided by a railroad on the north/south axis and further divided by a

    Jan 1, 2006

  • SAIMM
    Proceedings, 106th Annual General Meeting, 2003

    The 106th Annual General Meeting of The South African Institute of Mining and Metallurgy was held in the J.C. Lemmer Auditorium, SA National Museum of Military History, 22 Erlswold Way, Saxonwold, Joh

    Jan 1, 2003

  • DFI
    The Alternate Technical Concept Process For Foundations At The New Mississippi River Bridge, St. Louis

    By Dan A. Brown

    The New Mississippi River Bridge (MRB) employed conventional design-bid-build procurement, but the bidding process included the opportunity for pre-qualified bidders to develop and propose confidentia

    Jan 1, 2011

  • CIM
    Integration of Sensor Technologies at a Bucket Wheel Excavator for Identification of Material Type and Detection of Interface Layers

    By Martin Kesting

    The world wide growth dynamics and the continuously growing demand for energy, results in increasing energy prices. Looking from this point, the efficient exploitation of fossil fuel deposits has beco

    Oct 1, 2009

  • AUSIMM
    Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

    The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth. As part o

    May 1, 2010

  • AUSIMM
    Location of Seismic Events Associated with Caving Using Brightness Method

    By T de Wit, S Meyer

    The location of seismic events in mines is traditionally calculated based on the arrival times of P- and S-waves for a given velocity model (homogeneous or heterogeneous). This technique is successful

    May 9, 2016

  • ISEE
    The Importance and Advantages of Accurate Calculation, Evaluation and Control of Dragline Methodologies

    By K B. Holm

    This paper deals with the advances made at Syferfontein Colliery in the calculation and control of dragline methodology. The high capital outlay and operating cost of a dragline necessitates strict co

    Jan 1, 1994

  • NIOSH
    RI 5901 Heats And Free Energies Of Formation Of Anhydrous Silicates ? Introduction And Summary

    By K. K. Kelley

    Thermodynamics data for silicates have applications in the fields of extractive metallurgy, ceramics, and geochemistry. To facilitate these applications, up-to-date tables of heats and free energies o

    Jan 1, 1962

  • SAIMM
    The Development And Implementation Of The Lonmin Mechanized Breast Mining

    By K. Moxham, R. G. B. Pickering

    Over the last few years Lonmin Platinum and Sandvik have embarked on a unique partnership of collaboration through a systematic approach to developing equipment to mechanize and automate narrow reef p

    Jan 1, 2006

  • AUSIMM
    The Geology of Mount Morgan

    CONTENTS:1. Introduct'iona. Previous Accountsb. Summary of Geologyc. Physiography2. Morgan Groupa. Lithologyb. Structurec. Faulting3. The Mineral Deposita. Descriptioni. Size and Shapeii. Composi

    Jan 1, 1952

  • ISEE
    The International Society of Explosives Engineers:, A Valuable Resources for the Explosive Industry

    By Jeffrey L. Dean

    Now in its twenty-fifth year, the ISEE has grown to more than 4000 members representing 75 countries. The Society and its 35 chapters in the US, Canada and Australia work to educate the public about o

    Jan 1, 1998

  • SME
    Extension of the main ventilation system at LKABs Kiruna Mine for the new main haulage level 1365 m

    By L. Mukka

    The existing main mine ventilation system for the production areas to the Kiruna mine was constructed during the period 1994-1996 and extended with 4 more shafts, including fan stations, for the sea o

    Jan 1, 2009