Search Documents

Sort by

  • SME
    Financing Options For Small Mines—what We Learned In Our Senior Design Project - SME Annual Meeting 2022

    By G. V. Campbell, O. T. Holdsworth, M. G. Nelson

    A senior design project is required by all accredited mining engineering degree programs. Often referred to as the capstone of a student’s education, this project is expected to include all the import

    Mar 2, 2022

  • DFI
    Pile Design Philosophies For Coralline And Weak Carbonate Rocks

    By Rahul Wankhade, Sunil S. Baswankar, Aditya S. Kharatkar

    Despite advances in pile design methodologies and piling techniques at site, difficulties and uncertainties still exists for design of piles particularly in coralline deposits and weak carbonate rocks

    Sep 1, 2022

  • SME
    Remediation of the Falls of Ground in a Water Conveyance Tunnel - NAT2024

    By Amir Karami, Scott Munro

    This paper focuses on remediation of a 3.6 km long water conveyance tunnel that suffered two large falls of ground (FoGs), one of which subsequently progressed to the ground surface, resulting in full

    Jun 23, 2024

  • AUSIMM
    Mineral chemistry of iron oxides in the Leveaniemi iron ore deposit in Northern Sweden

    By A Larsson, K Niiranen

    The Palaeoproterozoic Leveäniemi iron oxide apatite (IOA) deposit of the so-called Kiruna type is currently mined by Luossavaara-Kiirunavaara AB (publ.), commonly known as LKAB. The mineralogy of iron

    Nov 8, 2021

  • AUSIMM
    A novel approach to evaluating gravity pre-concentration amenability utilising the hydrodynamics of dense liquids in inclined channels

    By J Zhou, T D. McGrath, K P. Galvin, C P. Lowes, J J. Eksteen

    Pre-concentration of low grade ores can improve the economic and environmental sustainability of an operation significantly, with opportunities for implementation ranging from run-of-mine to mill disc

    Nov 10, 2020

  • AUSIMM
    Utilisation of energy sources other than coke in the sintering process

    By T Higuchi, K Fukada, K Takehara, Y Iwami, S Fujiwara

    Following the Paris Agreement adopted in 2015 and the SDGs, reduction of CO2 emissions has been taken up as an issue worldwide, and the steel industry, which has a particularly large emission, is requ

    Nov 8, 2021

  • SME
    Concept of a Digital Twin for an Underground Laboratory at the Reiche Zeche Mine Utilizing Artificial Intelligence - SME Annual Meeting 2025

    By Ali Ahmadi, Andreas Rausch, Angela Binder, Stefan von der Mark, Dhananjeyan Jeyaraj, Jana Thomas, Nils Nöther, Stefan Wittek, Thomas Ulrich, Eleni Gerolymatou, Mario Kolling, Helmut Mischo, Michael D. Martin, Tugba Sen, Jens-André Paffenholz, Erik Farys, Oliver Langefeld, Wilfried Ließmann

    This paper outlines the MOVIE project, which is dedicated to the development of a digital twin for an underground laboratory at the research and education mine “Forschungs- und Lehrbergwerk Reiche Zec

    Feb 1, 2025

  • AUSIMM
    Improving industrial copper processing operations through the application of thermodynamic fundamentals and advanced predictive tools

    By G R. F Alvear Flores

    Mineral resources are becoming more complex in composition and structure making it more difficult to produce clean concentrates for primary metal smelting. In parallel, providing technological solutio

    Jun 17, 2024

  • SME
    From Planning to Commissioning: A Complete Overview of the Northeast Boundary Tunnel Project - NAT2024

    By Moussa Wone, Jeff Peterson, Filippo Azzarà, Daniele Nebbia

    The DC Water and Sewer Authority's Long Term Control Plan includes tunnels, sewer separation, pumping station rehabilitation and green infrastructure to reduce combined sewer overflow (CSO) discharges

    Jun 23, 2024

  • DFI
    Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction Approach

    By M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek

    "The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB

    Jan 1, 2016

  • DFI
    Optimization Of Drilled Shaft Design For A Highway Bridge In Arizona Using Load Test Results

    By John C. Niedzielski

    The existing US-70 Bridge over the Gila River at Bylas, Arizona is planned to be replaced due to its current poor condition. The replacement bridge is planned to be a 15-span, 1,904-foot (580 meter)

  • DFI
    Foundation Design And Construction Challenges For The Phoenix Sky Train Project

    By John C. Niedzielski

    The PHX Sky Train is a five mile long automated people mover system located at Phoenix Sky Harbor International Airport. Phase I of the PHX Sky Train includes the design and construction of 227 drill

    Jan 1, 2010

  • SAIMM
    Beyond the empirical pillar design method: The strain criterion and the pillar load inversion concepts

    By J. van Zyl, K. B. Le Bron, L. J. Gardner

    Pillar design is a crucial aspect of underground mining engineering, as it directly impacts the safety, stability, and overall effectiveness of mining operations. In this paper we present a method to

    Jun 10, 2024

  • AUSIMM
    The Development of Colloidal Mixer Base CRF Systems

    By A E Reschke

    The high-shear colloidal mixer is generally recognised as the most efficient method of mixing cement based grouts. Only recently however has this technology been applied to the production of cemente

    Jan 1, 1998

  • NIOSH
    RI 6510 Separation of the Lanthanide Series and Yttrium Using Phosphonic and Imillediatic Acid Resins

    By J. O. Winget

    Phosphonic acid and iminodiacetic acid chelating resins were investigated to assess their potential as selective ion exchangers for separating lanthanide elements and yttrium . The affinity of phospho

    Jan 1, 1964

  • AUSIMM
    Union Reefs: A Project Assessment and Development Case History

    By Giles D, Wegmann D

    The Mt Todd Gold Project is located 42 km northwest of the township of Katherine within the Northern Territory of Australia. It is situated in the southeastern portion of the Pine Creek Geosyncline.

    Jan 1, 1994

  • NIOSH
    RI 5628 Carbonizing Properties of Boone County, W. Va., Coals

    By G. W. Birge, D. E. Wolfson, J. H. Lynch

    This report by the Federal Bureau of Mines describes the carbonizing properties of coals from the principal beds in Boone County , W. Va . Results are given for samples of coals from No. 5 Block , Sto

    Jul 1, 1960

  • DFI
    The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall

    By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers

    Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM

    Jan 1, 2019

  • DFI
    Specialty Geo-Engineering in a Caisson Town

    By William H. Walton, Joel Dellaria, Jeffrey R. Hill

    The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The

    Jan 1, 2019

  • SAIMM
    Understanding decision making associated with the development of process routes for value-metal recovery: A reflection on two zinc operations over the last century, N. Uys, M. Becker, M. Reuter, E. Asselin, and J. Petersen

    By J. Petersen, M. Reuter, E. Asselin, M. Becker, N. Uys

    In order to meet society’s ever-increasing demand for metals and address the numerous technical, economic and environmental challenges within the current mining context, a holistic approach to process

    Jan 1, 2020