Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ore Reserve Estimation At Syncrude Canada Ltd. (18624a23-71c0-4fc5-945a-d70b7be965f7)By Neil D. Donnell, O&apos
Ore reserve estimation at the Syncrude Canada Ltd. open-pit oil sands mine in Northern Alberta has evolved since the project's inception. Early techniques followed a conventional petroleum reserv
Jan 1, 1985
-
OFR-5-87 Mine Hoist Electrical Systems Study - Volume II - Data/Analysis System Design StudySafe operation and system integrity are two important properties of a mine hoist electrical system. Previous methods used to assess these systems, though rare, have involved extensive downtime and req
Jan 1, 1985
-
Basic Solar Pond Modeling And Material Balance TechniquesBy David S. Butts
There are many solution mining operations that use solar ponds as a mineral recovery step. Other locations in the world are now under investigation to recover minerals by solution mining but require t
Jan 1, 1985
-
Operational Risk Assessment Of Mining EnterprisesBy Peter J. Szabo
INTRODUCTION The time period from the detailed feasibility study to the post investment audity usually ranges from three to eight years depending upon the nature of the mining project considered. I
Jan 1, 1985
-
The Effect Of Host Government Attitude Upon Foreign Investment In MiningBy G. E. Pralle
INTRODUCTION The decade from 1969 to 1979 saw the crest of a wave of investments by companies and investors, primarily from the major industrial nations, in the metals and minerals industries of th
Jan 1, 1985
-
An Improved Simulation Model For Semi-Autogenous GrindingBy L. G. Austin
The model originally proposed by Austin, et al., has been modified in the light of further investigation of the breakage laws in SAG milling. The model uses a fully-mixed reactor for short L/D mills a
Jan 1, 1985
-
Precious MetalsBy Nathaniel Herz, R. J. Adamson, C. M. Romanowitz, Frank W. Jr. McQuiston, C. D. Hoyt, Robert S. Shoemaker, P. H. O’Neil
1. INTRODUCTION In this section, precious metals are defined as gold, silver, and the platinum group metals comprised of platinum, palladium, iridium, osmium, and rhodium. If the first three years
Jan 1, 1985
-
RI 8960 - Separation of Cast and Wrought Aluminum Alloys by Thermomechanical ProcessingBy R. D. Brown
There are techniques for separating aluminum alloys from mixed scrap, but there are no efficient ways to separate wrought aluminum from cast aluminum. This Bureau of Mines report describes a novel tec
Jan 1, 1985
-
Optimization Of Block Height At The Luossavaara Mine ? IntroductionBy Dan Nilsson
The Luossavaara "Research Mine" is the First large, offensive effort in mining research conducted by the Swedish state. Over a 5-year period, 1981-1985, the Swedish Mining Research Foundation works in
Jan 1, 1985
-
The Role Of The Independent Consulting Firm In Project FinancingBy Hans W. Schreiber
INTRODUCTION At the end of the day, the decision by the sponsor to proceed with a project and to seek financing, or the decision by the financier to grant financing are made on a judgmental basis.
Jan 1, 1985
-
Electric Demand Growth: An Uncertain Future For Uranium ? IntroductionBy J. G. Asbury
Broadly conceived, the demand for electricity depends upon three sets of variables: (i) the growths of the many individual demands for energy services; (ii) the competitiveness of electrically driven
Jan 1, 1985
-
Radiation Grafted Structures - A New Tool for Recovery of Precious Metals from Dilute SolutionsBy G. Shore
Radiation grafted structures my be fabricated to contain ion exchange groups selective to an ion complex. Proper choice of substrate and monomer will provide selective ion exchange with differing phys
Jan 1, 1985
-
Technical Note - Delbridge Mine: Case History Of A Lithochemical Ore DiscoveryBy J. Boldy
Discovery of the Delbridge massive sulfide deposit in the Noranda district of Quebec resulted from an appreciation of the significance of a mercury leakage halo as a lithochemical pathfinder to blind
Jan 1, 1985
-
Evaluation Of Collectors For Molybdenite Flotation - IntroductionBy D. Malhotra
Most primary-molybdenite producers use a selective-flotation process in which molybdenite is floated from the ore while other sulfide and non-sulfide gangue minerals are depressed in the same step (Fi
Jan 1, 1985
-
RI 8989 - Electrostatic Sensitivity, Strength, and No-Fire Current of Short-Delay DetonatorsThe Bureau of Mines evaluated short-delay coal mine detonators manu-factured by three domestic companies for electrostatic sensitivity, strength, and no-fire current level. Electrostatic sensitivity w
Jan 1, 1985
-
Primary vertical Crafter Retreat Mining at the Zinc Corporation, LimitedBy Hebbard GJ
Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase
Jan 1, 1985
-
IC 9047 Lightweight Fiberglass Feed Leg For Hand-Held Pneumatic Percussion Rock DrillsBy Ellsworth R. Spencer
A lightweight fiberglass feed leg for hand-held pneumatic percussion rock drills has been fabricated and tested by the Bureau of Mines. Its lighter weight facilitates easier handling of the rock drill
Jan 1, 1985
-
Warrants and SPTCs add zest to new share issuesBy Robert B. Parsons
"This month, Tax Notes focuses on two features which can potentially ""dress up"" a new issue of common shares to make the shares more attractive to investors. Attaching warrants to a share issue is a
Jan 1, 1985
-
Uranium, Rare Earth And Iron Mineralization In Pegmatite At The Bemco Mine Prospect, Cranberry Lake, New JerseyBy John H. Puffer, Andreas H. Vassiliou
The Bemco mine area is within the Precambrian igneous and metamorphic rock terrain of the New Jersey Highlands province. Rocks In the area include a pyroxene granite, a hornblende granite, a quartz-ol
Jan 1, 1985
-
Sensitivity Analysis For Mining ProjectsBy John C. Robison
INTRODUCTION Sensitivity analysis is a means of gauging the impact of individual risks on a financing. Key risks can occur in three time periods: - Feasibility, engineering and construction phas
Jan 1, 1985