Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Occupational Health Effects of Airborne Coal Dust and mine Gases

    The last 40 years has seen a dramatic reduction in the prevalence of pneumoconiosis through improved mining engineering associated with continuing medical surveillance of those at risk. Presently t

    Jan 1, 1983

  • AUSIMM
    Preparation Of Environmental Impact Statements For The Mining Industry

    There are a number of methodologies which can be used for the preparation of environ- mental impact statements. Selection of a method depends upon the type of project and the environmental character

    Jan 1, 1976

  • AUSIMM
    The Development And Application Of techniques For The Assessment And Control Of Longhole Open Stope Stability At ZC/NBHC

    The causes and impact of stability problems associated with longhole open stoping (LHOS) at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NBHC) are discussed and LHOS

    Jan 1, 1983

  • AUSIMM
    Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace

    By Brown D. N, Troth D. A

    Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious b

    Jan 1, 1976

  • AUSIMM
    Productivity Improvement

    Cordeaux Colliery is more logically sited than the historic escarpment Corrimal Colliery, on the same reserve. At Cordeaux the modernisation of mine plans and equipment and the introduction of high pr

    Jan 1, 1991

  • AUSIMM
    The Strength of Backfills Stabilised with Calcined Gypsum

    By R M. Anderson, S P. Pigdon

    The production of stabilised backfill at mine sites commonly uses Portland cement as the binder. Calcined gypsum has cementing properties and is cheaper to produce than cement. This paper discusses th

    Jan 1, 1998

  • AUSIMM
    Differential Flotation Commissioning at Telfer

    By C R. Headley, S O. Hille, N P. Jacob

    The redevelopment of the Telfer Gold Mine in the Pilbara region of Western Australia was primarily based on the construction of a 17 Mtpa dual train concentrator coupled with open pit and underground

    Jan 1, 2007

  • AUSIMM
    The BHAS Copper-Lead Matte Treatment Plant

    By Valenti M

    A by-product of the lead smelting operations at BHAS is a copper-lead matte typically containing 35% copper, 38% lead and 12% sulphur. A hydrometallurgical treatment process has been developed for

    Jan 1, 1989

  • AUSIMM
    Development of Drilling and Blasting Practices at The Vickery Coal Mine

    By Conley R, Payne I

    The Vickery Coal Mine commenced open cut mining operations in May 1991. All overburden and interburden is drilled and blasted for excavation by dragline or hydraulic excavator. The mode of operation a

    Jan 1, 1992

  • AUSIMM
    Long Term Stability of Rehabilitated Strip Coal Mines

    By Williams DJ

    Preliminary calculations suggest that spoil piles in the Bowen Basin will undergo approximately 4 m settlement as the ground water table recovers after mining is abandoned. Approximately 1 m of di

    Jan 1, 1987

  • AUSIMM
    Three Dimensional Graphics Modelling as Applied to Longhole Stoping Design

    By Woodlands W. K

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Hydraulic Stope Filling on the Golden Mile

    Cut and fillstoping using hydraulically placed mill tailings has become an essential feature of stoping operations in Kalgoorlie. ' Approximately 30 per cent of the total production is current

    Jan 1, 1964

  • AUSIMM
    Hilton - The All Electric Mine

    By Todd W, Stone C

    A 3D graphics modelling system has been applied to longhole stope ring design at Z.C. Mines, Broken Hill, NSW. This has been in operation for a four month period (January, 1988). The purpose of th

    Jan 1, 1988

  • AUSIMM
    Parameter Adaptive Modelling of Mineral Beneficiation Processes

    Data logged on mineral beneficiation processes during normal operation are analysed using time series (correlation and spectral) methods to identify the dynamics of the processes for on-line computer

    Jan 1, 1985

  • AUSIMM
    Coal for Blast Furnace Injection

    By Scaife PH, Cripps Clark J, Cameron DB

    Tuyere coke samples have been taken through the tuyere openings of B.H.P. International Blast Furnaces since 1978 with Whyalla No. 2 Blast Furnace taking samples on a regular basis since 1982. The

    Jan 1, 1987

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Goonumbla: 25 Years, Four Deposits, 52 Prospects and Still Drilling...

    The Central West of New South Wales is emerging as a significant metallogenic province. The development of Northparkes Mines (North Limited) and the Cadia Hill deposit (Newcrest) are establishing N

    Jan 1, 1997

  • AUSIMM
    Integrated Methods for Colliery Waste Disposal and Ground Control and Safety

    By Aziz NI, Bridgwood EW, Singh RN

    One of the major impacts of using modern mechanised systems of mining is the production of large amounts of extraneous dirt intermixed with the Run of Mine output. The paper out- lines a proposed s

    Jan 1, 1986

  • AUSIMM
    The Design and Construction of a "Batcave"

    By D Dickson

    The properties along Ida Avenue in Mosman stand 10 m above the road on an outcrop of Sydney sandstone. Access to the houses is generally via a long steep staircase. The owner of 22 Ida Avenue identifi

    Jan 1, 2008

  • AUSIMM
    Design of a Large Flexible Underground Refrigeration Installation

    By Brouwer G, Shaw J

    As South African gold mines go deeper, and improved and more uniform working condi- tions are required, ever larger amounts of refrigeration are needed. At the same time new and more suitable cooli

    Jan 1, 1988