Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Enhancing Mining Productivity during Thunderstorms with Wireless Initiation Systems

    By Orica Peru, Pedro Lozada

    Maintaining a continuous mining process during thunderstorms is one of the primary challenges in Peru's open-pit mines. Safety protocols necessitate the establishment of exclusion zones to minimize th

    Jan 21, 2025

  • ISEE
    Improvement of the technology for performing blasting works in Studena quarry

    By Valeri Mitkov

    Studena Quarry is one of the main suppliers of inert materials for concretes production in Sofia. It is characterized by massif heterogeneity in density and fissuration. Failure to take into consider

    Jan 1, 2010

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    Shock and Transient Gas Pressure Damage to Electronic Detonators

    By G. Adderley, Rob. Farnfield, L. Bermingham

    The benefits of using electronic detonators within the drilling and blasting process in both surface and underground mining operations are well established and the use of this technology is widespread

    Jan 1, 2024

  • ISEE
    Mine optimization using Total smart mining solution

    By Chanhwi Shin, Hyeongmin Kang

    Mine optimization is a key strategy in the mining industry that focuses on improving the efficiency, productivity, and sustainability of mining operations. To achieve mine optimization, digitalization

    Jan 21, 2025

  • ISEE
    A Maximum Instantaneous Charge Map for Environmental Protection in Rock Blasting at the Serra Sul Mine (S11D)

    By Raúl Carretero de la Hoz, Leonardo Soares Chaves, João Paulo Soares Toneli, Francisco Felipe da Silva Dantas, Marcos Peres Lopes, Marcus Vinicius da Silva Gonçalves

    The mining activity results in environmental impact and thus requires the adoption of techniques to minimize its effects. The rock blasting process is required to break up and move the rock enabling t

    Jan 21, 2025

  • ISEE
    Optimizing Drill and Blast Parameters for Enhanced Fragmentation and Cost Efficiency in Open Pit Mines.

    By Shadrack Nuamah, Erik Westman, Bright Afum, Jesse Addy

    Rock fragmentation is the most critical aspect of hard rock production blasting due to its significant impact on drilling and blasting costs and the economics of subsequent loading, hauling, and crush

    Jan 21, 2025

  • ISEE
    Concrete Bridge Pier Removal in an Environmentally Sensitive River

    By Paul Kunze

    When a new bridge was needed across the upper reaches of the Yellowstone River in Montana, removing the old concrete bridge piers became an environmental concern for the highway department engineers.

    Jan 1, 2014

  • ISEE
    Training of Shotfirers in Queensland, Australia

    By A. Pope

    I have attended two Explosives Engineers’ Conferences in the past 4 years. The first was in Brighton, England with the European Federation of Explosives Engineers in 2005 and the International Society

    Jan 1, 2009

  • ISEE
    Measurement of the Vibration Delay Window for an Iron-Ore Mine

    By Maria Sullivan

    There have been many papers and articles presented over the last 60 years questioning the relevance of the 8-millisecond blasting delay window as an ‘Industry rule of thumb’. The concept of using dela

    Feb 6, 2023

  • ISEE
    Blasting, Material Flow & Ore Dilution in Sublevel Cave Mining; State-of-the-Art Review

    By Ayman Tawadrous

    Cave mining offers a flexible technique to exploit large, low grade, deep ore bodies with low operating costs. It is typically done in either a top down approach; i.e. sublevel caving, or in a bottom

    Jan 1, 2015

  • ISEE
    Vibration Reduction Mechanism and Experiment of Stepped V-cut Millisecond Blasting

    By Shi Hongchao, Zou Zou Xinkuan, Zhang Jichun

    As drilling and blasting is carried out in an urban tunnel, which is adjacent to an existing building or structure, the balance between blasting-induced vibration reduction and drivage efficiency is a

    Jan 1, 2015

  • ISEE
    Dispersion Signal Analysis in a Split-Hopkinson Pressure Bar at the University of Kentucky

    By Jhon Silva-Castro, Russell Lamont

    Understanding the behavior of materials subjected to high strain rate conditions is of fundamental importance to the mining industry. Several stages of the mining process involve high speed loading ra

    Jan 1, 2017

  • ISEE
    Permitted Explosives Research work in Australia

    By Duncan Chalmers, Rob Nowell, Miguel Araos

    Australian underground mines produce in excess of 60 mtpa of coal. Most of these use the longwall method, and they require the use permitted explosives (which are called “permissible” in other countri

    Jan 21, 2025

  • ISEE
    Determining The Dynamic Response of Geologic Bodies Through Split-Hopkinson Bar Compression Testing for Blasting Applications

    By Dr. Zach Agioutantis, Elliott Morgan

    The explosives, mining, and heavy civil industries consistently battle the uncertainty that is associated with working with a heterogenous medium like rock in blasting. This has led to studies to incr

    Jan 21, 2025

  • ISEE
    Blast Optimization through Long Term Fragmentation Analysis

    By Florian Bauer

    The Fording River mine in British Columbia produces hard coking coal in an open pit operation. Coal seams are exposed by blasting overburden and digging blasted muck with rope shovels. The drilling an

    Jan 1, 2014

  • ISEE
    Training and Licensing Requirements for Blasters

    By Stanley L. Lippincott

    A number of Federal and State agencies require formal training for blasters. Federal agencies often specify the need for initial training involving all job responsibilities as well as periodic refresh

    Jan 1, 1995

  • ISEE
    Implementation of the QA/QC program at the Carajás Iron Ore mine using Blastscout Probe Technology

    By Kahmmelly Mathildes Pimenta Coelho, Felipe Dantas, Jaine Ribeiro de Souza, Augusto Ferraz, Carlos Roberto Campos Junior, Davi Bastos Martins de Oliveira

    The Carajás Iron Mine, recognized as the largest iron ore province in the world, is notable for its continuous efforts to improve operational efficiency and safety. In response to these objectives, a

    Jan 26, 2026

  • ISEE
    Vibration Controlled Blast Timing Optimization Using the Seed Waveform Modeling Concept

    By Frank Sames

    Ground vibration levels are generally predicted using equations such as the USBM equation implementing the scaled distance concept and describing geological and blast design parameters in a ground tra

    Jan 1, 1995

  • ISEE
    Blasting-Induced Damage in Coal

    By Kaby K. Kabongo

    The paper is drawn from a project intended to explore a technique of prediction, control and optimization of fracture in coal induced by blasting. It evaluates the fines generated in coal submitted to

    Jan 1, 1995