Search Documents

  • AIME
    Taxation of Coal Lands as Applied in Pennsylvania

    By E. A. Holbrook

    LOCAL yearly taxes levied on bituminous coal lands in Pennsylvania have become a cost of first importance to the coal industry of the State. In Pennsylvania there is no State tax on real estate, but l

    Jan 1, 1933

  • AUSIMM
    Taxation of Mineral Mining Operations in New Zealand

    Consents Required for Overseas Persons Overseas Investment Regulations 1

    Jan 1, 1982

  • AIME
    Taxation Of Mineral Properties

    By Granville S. Borden

    The fruits of industry are divided between capital, labor, and governments. Capital takes its redemption and remuneration through profits or dividends; labor takes its share through wages; governments

    Jan 1, 1959

  • AIME
    Taxation Of Mineral Properties (3e018790-757a-446e-9804-985a4afe2f7a)

    By Granville S. Borden, Frank H. Madison

    The fruits of industry are divided between capital, labor, and governments. Capital takes its redemption and remuneration through profits or dividends; labor takes its share through wages; governments

    Jan 1, 1964

  • CIM
    Taxes on Mining ? A Short Summary

    By R. D. Brown

    For the first time in years, the spring budgets of federal and provincial governments have not brought down major new proposals affecting the tax burdens of the mining industry in Canada. It seems app

    Jan 1, 1977

  • AUSIMM
    Taxonomy of Interactive Computer-Based Visualisation Systems and Content for the Mining Industry û Part One

    By C Caris, K Fowle, M Schmid, E van Wyk, D Schofield, A Squelch, M S. Kizil

    This paper has been written collaboratively by members of the International Mining VR Group. It is the first of a series of papers. Mining in the 21st century is a high technology industry that strive

    Jan 1, 2008

  • SME
    TBM and Logistics for Constructing Twin Tunnels Between Artificial Islands in Hampton Roads - RETC2021

    By Sergio Estebanez, Martha Gross, Ruben Rubal, Yvonnick Rescamps, Alexandre Cochennec

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in coastal Virginia, USA will add two 1.5-mile (2.4 km) TBM bored tunnels alongside two existing immersed-tube tunnels between artificial islan

    Jun 13, 2021

  • SME
    TBM And NATM Combined Solution For A Very Deep Tunnel?The ?Pajares? Case

    By Enrique Fernández

    INTRODUCTION The high speed rail link between Madrid and Asturias, in the North of Spain, has encountered in the Cantabrian range the biggest challenge of the whole line, a very deep tunnel, 25 km l

  • SME
    TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara

    As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol

    Jun 23, 2024

  • SME
    TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022

    By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell

    As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic

    Dec 1, 2022

  • SAIMM
    TBM cutting forces with particular reference to cutter and tunnel diameters

    By S. Okubo, K. Fukui

    Empirical equations established for estimating the rock strength of the working face based on the cutting forces of a tunnel boring machines (TBM) are further examined and discussed with respect to th

    Jan 1, 2003

  • SME
    TBM Data and Performance Monitoring on Large Diameter TBM Tunnels Lined with Shotcrete in the Himalayas—A Case Study - RETC2021

    By Gary Peach, Peter Mason

    Planning and estimating progress rates and costs for tunnelling is always best done based on experience and historic precedent. Much precedent is available but the use of data monitoring, data mining

    Jun 13, 2021

  • SME
    TBM Data Management And Quality Assurance For The Brightwater Conveyance Project

    By Jeffrey Mitsopoulos

    King County?s (KC) Brightwater Conveyance Project in Seattle, Washington involves the construction of approximately 21 kilometers (13 miles) of bored tunnel, in three contracts, with four TBM?s which

  • SME
    TBM Excavability: Prediction and Machine–Rock Interaction

    By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada

    TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj

    Jan 1, 2007

  • SME
    TBM Excavation Through Pre-Existing Tie-Backs—Ship Canal Water Quality Project (SCWQP) - NAT2024

    By Francesco Chiappalone, Franco Gasperin, Fabrizio Fara

    This document describes the challenging task of mining through tiebacks using a 21'-8" diameter Tunnel Boring Machine (TBM) as part of the Ship Canal Water Quality Project. The mining operation involv

    Jun 23, 2024

  • SME
    TBM Operation Challenges at DTL3 C931 Project in Singapore

    By Bo Kyung Sim, Dae Young Kim, Jae Won Lee, Ebrahim Farrokh

    "The contract C931 of the downtown line 3 (DTL3) mass rapid transit system of Singapore includes half a kilometer twin tunnels running between Mattar and Macpherson stations. An EPB TBM of 6.6 m diame

    Jan 1, 2016

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • SME
    TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021

    By Devan Naik, Matthew Stokes, Andy Nigro

    This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co

    Jun 13, 2021

  • SME
    TBM Rescue Shaft, Tunnel, and Relaunch in Karst Conditions - NAT2024

    By Dan Swidrak, Bill Zietlow

    Halfway through a 17,770-ft long stormwater tunnel, an 11-ft diameter TBM encountered a karst void below the Mississippi River in Missouri, resulting in significant inflow. It was decided that the TB

    Jun 23, 2024

  • SME
    Tbm Shield Abandonment Beneath the Fraser River for Connecting Tunnel and River Riser of the Annacis Island WWTP New Outfall System - NAT2024

    By John Newby, Ulf Gwildis, Ken Massé, Guillaume Roux

    How to connect an effluent conveyance tunnel to riser shaft and diffuser arms of an outfall system is dictated by the ground conditions, which ideally include rock or soil strata of low permeability.

    Jun 23, 2024